Here in my area we are required to use 4x10 ADS black perforated pipe in our rock trench for septic systems. 6" under it & 2" on top total of 12" rock
I've seen the box built that you drag thru the trench and it lays the pipe and rock
Would like to see everyone's tricks/devices
farmboy55 is offline  

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

   

Advertisement

 

Old 08-30-2017, 08:32 AM   #2
Pro
 
sparehair's Avatar
 
Trade: Painting, flooring
Join Date: Nov 2008
Location: Portland, Or
Posts: 713
Rewards Points: 1,230

Re: Holding Leaching Field Pipe While Installing Rock Over It


For the record, 6 +2 is 8. Other than being a troll I got nothing.

Sent from my SM-N910T using Tapatalk

Advertisement

sparehair is offline  
Old 08-30-2017, 08:58 AM   #3
Pro
 
jhark123's Avatar
 
Trade: Pro Cat Herder
Join Date: Aug 2008
Location: Enumclaw, WA
Posts: 2,464
Rewards Points: 1,622

Re: Holding Leaching Field Pipe While Installing Rock Over It


I use little sections of 6" pvc pipe. Cheap, easy to roll and if the operator accidentally buries one its no big deal.
jhark123 is offline  
   
 
Old 08-30-2017, 12:10 PM   #4
Pro
 
dayexco's Avatar
 
Trade: entrepreneur of excavating expertise
Join Date: Mar 2006
Posts: 5,968
Rewards Points: 52

Re: Holding Leaching Field Pipe While Installing Rock Over It


Why not have somebody hold it while you're putting on your cover aggregate?
dayexco is online now  
Old 08-30-2017, 01:14 PM   #5
.....
 
Frank Castle's Avatar
 
Trade: Remodeling
Join Date: Dec 2011
Location: Central Illinois
Posts: 1,431
Rewards Points: 156

Re: Holding Leaching Field Pipe While Installing Rock Over It


Quote:
Originally Posted by sparehair View Post
For the record, 6 +2 is 8 + 4(pipe & rock beside it) = 12. Other than being a troll I got nothing.
I assume you knew that.

Troll on.
__________________
Adapt, Improvise, Overcome.
Frank Castle is online now  
The Following User Says Thank You to Frank Castle For This Useful Post:
sparehair (08-30-2017)
Old 08-30-2017, 01:36 PM   #6
Pro
 
sparehair's Avatar
 
Trade: Painting, flooring
Join Date: Nov 2008
Location: Portland, Or
Posts: 713
Rewards Points: 1,230

Re: Holding Leaching Field Pipe While Installing Rock Over It


Op said 12" rock not 12" total. I dont care what he meant I only care about arguing abiut nothing until all relevant information is lost and the op gives up on the forum in utter frustration and despair as his fundamental understanding of basic arithmetic is cremated in an altar of unabashed egotism.

Sent from my SM-N910T using Tapatalk
sparehair is offline  
The Following User Says Thank You to sparehair For This Useful Post:
Rio (08-30-2017)
Old 08-30-2017, 02:03 PM   #7
.....
 
Frank Castle's Avatar
 
Trade: Remodeling
Join Date: Dec 2011
Location: Central Illinois
Posts: 1,431
Rewards Points: 156

Re: Holding Leaching Field Pipe While Installing Rock Over It


If it weren't for X-mas coming and the 2017 Drive: Marine Toys For Tots, plus I tweeked my shoulder this morning (moving my own rock) and can't do anymore work today. So, I'll play.

How are you gonna get the 2" of rock to stay on top of the pipe without 4" rock next to pipe?

2 Pipes?

1 for leach field
1 for Mary Jane
__________________
Adapt, Improvise, Overcome.
Frank Castle is online now  
The Following User Says Thank You to Frank Castle For This Useful Post:
sparehair (08-31-2017)
Old 08-30-2017, 05:04 PM   #8
Registered User
 
farmboy55's Avatar
 
Trade: Excavating
Join Date: Aug 2017
Location: Kentucky
Posts: 7
Rewards Points: 10

Re: Holding Leaching Field Pipe While Installing Rock Over It


Tuff bunch here for sure 😳😳
farmboy55 is offline  
Old 08-30-2017, 07:57 PM   #9
Pro
 
B.Johnson's Avatar
 
Trade: Builder
Join Date: Sep 2016
Location: SE Michigan
Posts: 1,060
Rewards Points: 1,632

Re: Holding Leaching Field Pipe While Installing Rock Over It


Around here they use stone slingers.
http://stoneslinger.com/
__________________
Home Designer Series Software
B.Johnson is offline  
The Following 2 Users Say Thank You to B.Johnson For This Useful Post:
Rio (08-30-2017), RLH_CT (09-01-2017)
Old 08-30-2017, 08:15 PM   #10
.....
 
Frank Castle's Avatar
 
Trade: Remodeling
Join Date: Dec 2011
Location: Central Illinois
Posts: 1,431
Rewards Points: 156

Re: Holding Leaching Field Pipe While Installing Rock Over It


Quote:
Originally Posted by farmboy55 View Post
Tuff bunch here for sure 😳😳
Just like the job site.
__________________
Adapt, Improvise, Overcome.
Frank Castle is online now  
Old 09-04-2017, 04:28 PM   #11
Vagitarian
 
rino1494's Avatar
 
Trade: site and utility contractor
Join Date: Jan 2006
Location: Dallas, PA
Posts: 3,589
Rewards Points: 2,388

Re: Holding Leaching Field Pipe While Installing Rock Over It


Lay down your 6" of stone using excavator and laborer to rake off and maintain grade with a laser level. Install pipe and use excavator to place additional stone ontop of pipe.
__________________
Life is hard. It is harder when you are stupid

Uncle Sam wants YOU....to speak ENGLISH
rino1494 is offline  
The Following User Says Thank You to rino1494 For This Useful Post:
dayexco (09-06-2017)
Old 09-05-2017, 10:54 AM   #12
Pro
 
Fishindude's Avatar
 
Trade: Industrial
Join Date: Aug 2017
Location: Indiana
Posts: 216
Rewards Points: 454

Re: Holding Leaching Field Pipe While Installing Rock Over It


We have made up some steel rod stakes with adjustable support brackets to suspend the pipe in place prior to installing stone. Get the pipe all shot in nice at proper grade, then trickle the stone in place gently. Pull the stakes and brackets after stone is in place enough to support the pipe and re-use them on next job, then fully cover the pipe with stone.

Have also done same thing making up wood stakes with brackets in the field and just abandon them in place in the trench with pipe.
Fishindude is offline  
The Following 2 Users Say Thank You to Fishindude For This Useful Post:
farmboy55 (09-06-2017), NYgutterguy (09-11-2017)
Old 09-06-2017, 07:30 PM   #13
Pro
 
Moxley-Kidwell's Avatar
 
Trade: Excavation & Asphalt Paving
Join Date: Jan 2011
Location: Frederick, MD
Posts: 555
Rewards Points: 286

Re: Holding Leaching Field Pipe While Installing Rock Over It


Quote:
Originally Posted by rino1494 View Post
Lay down your 6" of stone using excavator and laborer to rake off and maintain grade with a laser level. Install pipe and use excavator to place additional stone ontop of pipe.
THIS! Don't over complicate it. Get the bottom stone on grade, lay the pipe, put half a bucket on each stick to keep it in place and then backfill the rest. No reason to waste time or money on gadgets to keep it in place.
Moxley-Kidwell is offline  
Old 09-07-2017, 08:45 PM   #14
Contractor
 
tgeb's Avatar
 
Trade: Excavation, Foundation, Concrete
Join Date: Feb 2006
Location: Maryland
Posts: 5,902
Rewards Points: 1,470

Re: Holding Leaching Field Pipe While Installing Rock Over It


I've installed a lot of septic systems all by myself. I get the base stone on grade, set the pipe in place, (I prefer to use pvc pipe, it lays strait better).

When I cover the pipe I will approach the trench with the loader at a slight angle, enough that when the stone is dumped it will cover both sides and the top of the pipe, the pipe stays centered in the trench no problem.
__________________
Tom

www.gebcon.com
tgeb is online now  
The Following 2 Users Say Thank You to tgeb For This Useful Post:
dayexco (09-08-2017), jhark123 (09-11-2017)
Old 09-11-2017, 01:15 AM   #15
Pro
 
jhark123's Avatar
 
Trade: Pro Cat Herder
Join Date: Aug 2008
Location: Enumclaw, WA
Posts: 2,464
Rewards Points: 1,622

Re: Holding Leaching Field Pipe While Installing Rock Over It


I should add, I am using rigid pvc, not sure why you would use ads. If I was using flexible pipe, I would definitely put the 6" of rock down first.

Advertisement

jhark123 is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Installing grab bars in fiberglass tub shelf guy Kitchens & Baths 26 09-22-2015 01:42 AM
How do I run a new vent pipe and tie in 2 toilets NC2X4 Plumbing 21 07-24-2013 10:31 PM
custom bookcases vs. radiator pipe. Rich D. Construction 2 12-13-2011 10:21 AM

Join Now... It's Fast and FREE!

I am a professional contractor
I am a DIY Homeowner
Drywall Talk is for
PROFESSIONAL CONTRACTORS ONLY!

At DrywallTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?