Grouted Riprap

Hey. I am thinking of installing some grouted riprap as an energy dissapator for water coming out of a bunch of gutter drainpipes and a culvert pipe at a house. Currrently the pipes are discharging into a wooded ravine at the side of the house. The rainwater has eaten away a huge chunk of the slope. Anywho, I know what the end product needs to look like because I have seen it on plans before. But I have never actually done it. What is the process? Once I get the dirtwork done, can order up some grout from the local concrete batch plant and pour a bed of that, and then hurry and set all the riprap in the grout. Help me. Thanks.

purdueboy is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 08-28-2009, 05:25 PM   #2
Member
 
Stock's Avatar
Trade: contract manager
 
Join Date: Jun 2009
Location: Eire
Posts: 39
Simple enough job when you have your earth works done,get some lean mix dry concrete and bed the first course of rock on this,then either stack the next layer on these and use some 1/2"-3/4" clean chip to fill in between the rocks and the clay,when you have attained your height haunch the last row with concrete to 3/4 way up the rock so you can cover it with topsoil,then point the front face if required.
The reason chip aggregate is used is that it is self compacting and allows the irregular faces of the rip rock to bed in safely and take the load of the top layer of stones so the whole structure is self supporting.
__________________
Common sense is not common practice
Stock is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Stone is grouted but not sealed caustin Ceramic & Stone Tile 19 04-02-2009 06:04 PM




Top of Page | View New Posts


All times are GMT -5. The time now is 11:02 PM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC