Any guesses as to what we had to do here? Don't worry, it's temporary
![]()
|
|
|
|
|
|
#2 |
|
Contractor
Trade: Excavation, Foundation, Concrete
Join Date: Feb 2006
Location: Maryland
Posts: 3,276
|
Re: On The Fly Engineering??
I have no clue.......but it looks like it could get messy.
|
|
|
|
|
|
#3 |
|
Pro
Trade: entrepreneur of excavating expertise
Join Date: Mar 2006
Posts: 2,604
|
Re: On The Fly Engineering??
be my guess you replaced a manhole where a service went directly into it. you've run the 4" thru the manhole as a temp so you can pour the invert of the manhole and not contend w/the flow. your supplier sell pre-poured inverts? we haven't poured a bottom in 7-8 yrs now. man, i miss steps. our city has outlawed them in any new manholes.
__________________
someday, i'll be as patient as Nick. |
|
|
|
|
|
#4 |
|
Vagitarian
|
Re: On The Fly Engineering??
Is that perm or temp ?? It leads me to believe that it is perm since you have your butyl rope in place. Why couldn't you just pop a hole in the side of the manhole and run it in that way ??
Edit: Nevermind, I see that you said it is temp. Either way, you are gonna have to pop a hole in the side for the lateral anyway, right ??
__________________
Life is hard. It is harder when you are stupid Uncle Sam wants YOU....to speak ENGLISH Last edited by rino1494; 02-22-2009 at 06:48 PM. |
|
|
|
|
|
#5 |
|
Pro
Trade: entrepreneur of excavating expertise
Join Date: Mar 2006
Posts: 2,604
|
Re: On The Fly Engineering??
many cities no longer allow service lines going directly into manholes.
__________________
someday, i'll be as patient as Nick. |
|
|
|
|
|
#6 |
|
Pro
Trade: Excavation Contractor
Join Date: Apr 2008
Posts: 374
|
Re: On The Fly Engineering??
Combine all the replies and you are all pretty much correct. The existing lateral that we had to redirect will be abandoned and reconnected into the newly constructed system "upstream". Like Day said, the City does not like laterals coming into manholes especially temporary ones that will have to be regrouted above the flow line. Thus you have what you see here. We actually had to pull the manhole forward from the plans since the existing sewer was pretty messed up with a saddle going right between two bells and a "custom" grouted in clean-out riser making our specified tie in point non-existant. Thank goodness for street lights and understanding wives..............putting a street back together at 7:30PM makes for good memories
Last edited by cexcavation; 02-22-2009 at 11:42 PM. |
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Missed engineering!! | Cache | Framing | 16 | 12-06-2008 11:59 AM |
| Engineering Degree? | J Howard | General Discussion | 14 | 09-29-2008 10:50 PM |
| Engineering question regarding perc | guyute65045 | Excavation & Site Work | 6 | 03-10-2008 04:44 PM |
| tile roof engineering terms? | bobbrown | Roofing | 4 | 06-28-2006 09:57 AM |
| Go to Page... |