Old 03-03-2009, 10:40 PM   #1
Registered User
 
ABB's Avatar
 
Trade: General Contractor Remodeling
Join Date: Mar 2009
Posts: 3

Contract Claus


I am a GC getting ready to do a large room addition. We will be digging (32) 12" dia. x 96" d piers into what seems like clay on the surface.
My question... Does anyone out there have a clause in their contract that stipulates an additional charge if you run into excessively hard soil or rock (river rock etc.) and how do you handle this type of situation and how do you word the clause?

ABB is offline  
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Old 03-04-2009, 12:16 AM   #2
Pro
 
cexcavation's Avatar
 
Trade: Excavation Contractor
Join Date: Apr 2008
Posts: 374

Re: Contract Claus


Sounds like you already know what to say I just make it clear that my bid is based on the customer description of the soil type (if no test pits prescribed) and if the soil changes in the way of rock etc. then the project goes from a bid to a time and material at a predetermined rate. There is no way I will bid based on assumptions unless it is agreed that of the "assumptions" are wrong then I at least get to make my hourly rate and the customer gets a fair deal.......it takes what it takes
cexcavation is offline  
Old 03-04-2009, 06:38 AM   #3
Pro
 
AtlRemodeling's Avatar
 
Trade: Residential Remodeling
Join Date: Jan 2008
Location: Suwanee, Georgia
Posts: 380

Re: Contract Claus


We use the following:

"Unless specifically stated elsewhere, this contract does not cover unsuitable soils, buried debris or buried rock. An estimate for remediation of these items will be made upon discovery."

AtlRemodeling is offline  
Old 03-04-2009, 06:43 AM   #4
Contractor
 
tgeb's Avatar
 
Trade: Excavation, Foundation, Concrete
Join Date: Feb 2006
Location: Maryland
Posts: 3,274

Re: Contract Claus


We looked at this issue a while ago, check out this thread and the one it references, you will find all you need........I think.

http://www.contractortalk.com/f62/rock-clause-32404/

Welcome to the site, good luck on the pier footings. 12" diameter 8" deep sounds like a lot of fun, how do you dig those?
__________________
Tom

www.gebcon.com
tgeb is online now  
Old 03-04-2009, 07:34 AM   #5
Pro
 
SDC's Avatar
 
Trade: Remodeling
Join Date: Jan 2009
Location: New Hampshire
Posts: 295

Re: Contract Claus


This is in part of my contract. it can be easily changed as needed.


From time to time during remodeling projects we come across certain “Unforeseens.” These are things such as pipes or heat ducts running inside walls that are being removed. They could also be ledge, large rocks or a stump pile under the ground that we are excavating, thickness of concrete. These are things that we cannot see and cannot plan for. In these cases we make you the homeowner aware of the situation and offer a solution to the problem. These are usually handled by a time-and-material change order.
__________________
David Cookman
SDC is offline  
Old 03-04-2009, 07:58 AM   #6
Pro
 
JDavis21835's Avatar
 
Trade: Excavation
Join Date: Feb 2009
Location: Saginaw Michigan
Posts: 272

Re: Contract Claus


Quote:
Originally Posted by AtlRemodeling View Post
We use the following:

"Unless specifically stated elsewhere, this contract does not cover unsuitable soils, buried debris or buried rock. An estimate for remediation of these items will be made upon discovery."
You may want to add a buried tanks or contaminated material to that. Most lawyers would split hairs about the buried debris.
JDavis21835 is offline  
The Following User Says Thank You to JDavis21835 For This Useful Post:
AtlRemodeling (03-04-2009)
Old 03-04-2009, 05:48 PM   #7
Registered User
 
Heimy's Avatar
 
Trade: site contractor
Join Date: Jan 2009
Posts: 6

Re: Contract Claus


We use this

**Please Note*** Contractor shall be entitled to extra compensation by change order for the increased costs incurred to remove from the Project and to perform Contractor's work if rock, slag, buried concrete, hazardous materials, unsuitable soil and/ or other similar subsurface conditions are encountered at the Project
Heimy is offline  
Old 03-04-2009, 05:55 PM   #8
Custom Stuff
 
Mike(VA)'s Avatar
 
Trade: General Contractor - Custom Renovations
Join Date: Jan 2008
Location: Manassas, VA
Posts: 859

Re: Contract Claus


A little long, but here is what we use:

10b. STANDARD EXCLUSIONS: Unless specifically included in the “General Scope of Work” section above, this Agreement does not include labor or materials for the following work: Plans, engineering fees, or governmental permits and fees of any kind. Additional work required by governmental plan checkers on final “Red Lined” Job copy of plans that are yet to be issued. Testing, removal and disposal of any materials containing asbestos (or any other hazardous material as defined by the EPA). Custom milling of any wood for use in project. Moving Owner’s property around the site. Labor or materials required to repair or replace any Owner-supplied materials. Repair of concealed underground utilities not located on prints or physically staked out by Owner which are damaged during construction. Surveying that may be required to establish accurate property boundaries for setback purposes (fences and old stakes may not be located on actual property lines). Final construction cleaning (Contractor will leave site in “broom swept” condition). Landscaping and irrigation work of any kind. Temporary sanitation, power, or fencing. Removal of soils under house in order to obtain 18 inches (or code-required height) of clear space between bottom of joists and soil. Removal of filled ground or rock or any other materials not removable by ordinary hand tools (unless heavy equipment is specified in Scope of Work section above), correction of existing out-of-plumb or out-of-level conditions in existing structure. Correction of concealed substandard framing. Rerouting/removal of vents, pipes, ducts, structural members, wiring or conduits, steel mesh which may be discovered in the removal of walls or the cutting of openings in walls. Removal and replacement of existing rot or insect infestation. Failure of surrounding part of existing structure, despite Contractor’s good faith efforts to minimize damage, such as plaster or drywall cracking and popped nails in adjacent rooms or blockage of pipes or plumbing fixtures caused by loosened rust within pipes. Construction of a continuously level foundation around structure (if lot is sloped more than 6 inches from front to back or side to side, Contractor will step the foundation in accordance with the slope of the lot). Exact matching of existing finishes. Public or private utility connection fees. Repair of damage to roadways, driveways, or sidewalks that could occur when construction equipment and vehicles are being used in the normal course of construction. Cost of correcting errors and omissions by the Owner’s design professionals and separate contractors. Cost of correcting/testing/remediating mold/fungus/mildew and organic pathogens unless caused by the sole and active negligence of Contractor as a direct result of a construction defect that caused sudden and significant water infiltration into a part of the structure. Cost of removing ponding ground water or other unusual concealed site conditions during excavation. Extra costs associated with refusal of caisson drilling, cave-ins, etc. Cost to modify and/or remanufacture custom brackets and other custom-fabricated materials that are manufactured per plans and/or specifications but do not fit properly into the structure.
__________________
__________________________________________________ ___________
I EXPECT THAT SOMEDAY I WILL SEE THE FRUITS OF MY LABOR. IS IT SOMEDAY YET?
Clifton, Great Falls, McLean, Fairfax Station, Manassas, Virginia Renovation Contractor
Mike(VA) is offline  
Old 03-04-2009, 10:02 PM   #9
Registered User
 
ABB's Avatar
 
Trade: General Contractor Remodeling
Join Date: Mar 2009
Posts: 3
Thumbs up

Re: Contract Claus


Thank you all for the great tips & advise. I can add this to my arsenal. We will be digging these piers with a small (tight access)excavator w/ auger & a bobcat loader.

Thanks again.
ABB is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Contract Question... RiskIt Business 10 03-01-2009 06:30 AM
Time To Really Consider Escalation Clauses Ed the Roofer Business 18 06-25-2008 11:42 PM
Help, I'm in a contract with a crazy lady! Flawless Finish Painting & Finish Work 18 01-31-2008 08:22 PM
Pre contract contract woodmagman Business 0 04-22-2007 01:43 PM
Contract and terms. AFI Painting & Finish Work 28 09-29-2006 07:57 PM

Join Now... It's Fast and FREE!

Privacy Badge
I am a professional contractor
I am a DIY Homeowner
ContractorTalk.com is for
PROFESSIONAL CONTRACTORS ONLY!

At ContractorTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?