Contractor Talk - Construction and Remodeling Site
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Contractor Talk - Professional Construction and Remodeling Forum > Trade Talk > HVAC

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 08-07-2009, 03:43 PM   #1
Pro
Trade: H.v.a.c.
 
Join Date: May 2008
Location: Boise, Id
Posts: 549
new venting through a chimney.

The current venting setup on this job is one common vent for an 80% furnace and water heater through a chimney.

I am considering pulling out the existing vent, and running a 4"b-vent for the w/h and the pvc vent for a new furnace. has anyone done this? If so, what are some things that I might want to be aware of?

flashheatingand is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 08-07-2009, 05:51 PM   #2
Member
Trade: HVAC
 
Join Date: Apr 2009
Posts: 53
If you are doing a 90% + furnace, I see no problems, done this many times. Just seal the masonry chimney up top to stop draft & rain. Sometimes I leave it open for combustion air though if a one pipe furnace. We usually do two pipe though, but the water heater needs air many times.

Last edited by gene2; 08-07-2009 at 05:54 PM.
gene2 is offline   Reply With Quote
Old 08-08-2009, 02:57 PM   #3
Pro
Trade: H.v.a.c.
 
Join Date: May 2008
Location: Boise, Id
Posts: 549
Thanks Gene, I was concerned about the spacing between the pvc vent and the B-vent. I don't think the heat from the b-vent would "melt" the pvc, but was curious if that might be an issue. I guess if there was a problem, you would have heard about it by now.

Once again, thanks for the input.
flashheatingand is offline   Reply With Quote
Old 09-07-2009, 01:52 PM   #4
Member
 
coolmen's Avatar
Trade: hvac
 
Join Date: Mar 2006
Location: north jersey
Posts: 89
all codes apply that 1" clearance from bvent to any cumbustable materials
coolmen is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Clearance problem for chimney GregWCIL Masonry 3 07-07-2009 09:54 PM
Suggestions on supporting chimney in attic? John Andrews Masonry 6 06-10-2009 07:47 PM
Dangerous Chimney Dilemna The Boss Masonry 27 04-25-2009 08:35 PM
Metal chimney replacement trade Construction 5 04-06-2009 12:35 PM
Questions About a No Good Chimney Bruce Masonry 11 01-02-2007 12:46 AM




Top of Page | View New Posts


All times are GMT -5. The time now is 07:51 AM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC