Invisible Basement Ductwork

 
Thread Tools Search this Thread Display Modes
Old 09-25-2009, 01:31 PM   #1
Red Dot D+B
 
Dog Gone's Avatar
 
Trade: Licensed General Contractor
Join Date: Aug 2009
Location: seattle, wa
Posts: 9

Invisible Basement Ductwork


Dealing with low basement height clearances is a common problem for many remodelers. Aside from the occasional beams, HVAC supplies and returns are often the biggest obstical. Traditionally, we've minimized the ductwork's intrusion by using shallower and wider ducts and creating ceiling soffits.

What would be the problem with constructing the Supply line so that is has a short down-vent immediately leaving the furnace and running supply along the FLOOR hiding ducts under window seats, etc.

Seems like it would create some ininital resistance making blower work harder and consuming more power - but if sealed well wouldn't this function normally?

Dog Gone is offline  
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Old 09-25-2009, 07:36 PM   #2
Pro
 
flashheatingand's Avatar
 
Trade: H.v.a.c.
Join Date: May 2008
Location: Boise, Id
Posts: 1,905

Re: Invisible Basement Ductwork


The problem is that the air will gyrate too close to the furnace. As a result, it is highly possible that the furnace will over heat during the winter, and possibly the coil will freeze during the summer. I like the air to shoot straight for at least 2 feet before going into a 90. However, field conditions don't always allow this. The closer the off-set from the furnace, the greater the risk of air-flow problems

Go Hawks!!
flashheatingand is offline  
Old 09-26-2009, 06:10 PM   #3
Pro
 
beenthere's Avatar
 
Trade: HVAC
Join Date: Mar 2009
Posts: 1,310

Re: Invisible Basement Ductwork


You would have to make the duct bigger to allow for the extra turns, and the longer length.
You also would add a large cost to the install, in those applications that the joist are panned for returns. Since now they would have to be hard piped.

The real easy solutions are.
A: Builders/architects design the homes to have the duct work run in the conditioned area of the home..
B: Make the basement 9' high.
beenthere is offline  

Tags
ductwork, hvac


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
The perimeter drain question- basement bnentrup Excavation & Site Work 7 08-14-2009 11:28 AM
Return Grill in the Basement orson HVAC 7 10-03-2008 12:01 AM
Basement bathroom Input requested guyute65045 Plumbing 7 09-14-2008 09:43 PM
HELP! Basement floor disaster Profiter Construction 5 07-11-2006 09:01 PM

Join Now... It's Fast and FREE!

Privacy Badge
I am a professional contractor
I am a DIY Homeowner
ContractorTalk.com is for
PROFESSIONAL CONTRACTORS ONLY!

At ContractorTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?