Contractor Talk - Construction and Remodeling Site
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Contractor Talk - Professional Construction and Remodeling Forum > Trade Talk > HVAC

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 03-03-2007, 08:13 PM   #1
Member
Trade: roofing
 
Join Date: Dec 2006
Posts: 77
duct taping your joints

I recently built a house, the Hvac was all installed and I was wandering if you should duct tape all your metal duct joints and little holes where air can seep out. My installer says no, but doesn't make sense to lose warm/cold air in crawlspace/attic.

Travis is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 03-03-2007, 08:24 PM   #2
JPF
Pro
Trade: Handyman Services
 
Join Date: Dec 2006
Location: S. Florida
Posts: 117
Every ducting i've seen, there is the metallic duct tape at all the joints and seams.....i can't think of a reason you can't do it yourself, if you think it requires it.
JPF is offline   Reply With Quote
Old 03-03-2007, 09:11 PM   #3
DGR,IABD
 
mdshunk's Avatar
Trade: Electrical; Commercial and Residential Service
 
Join Date: Mar 2005
Location: Central PA
Posts: 9,665
Was the IRC the code document that covered this job? If so, here you go:

M1601.3 Installation.
Duct installation shall comply with Sections
M1601.3.1 through M1601.3.6.
M1601.3.1 Joints and seams.

Joints of duct systems shall be made substantially airtight by means of tapes, mastics, gasketing or other approved closure systems. Closure systems used with rigid fibrous glass ducts shall comply with UL 181A and shall be marked ia181A-Pla for pressure-sensitive tape, ia181A-Mli for mastic or ir181A-Hli for heat-sensitive tape. Closure systems used with flexible air ducts and flexible air connectors shall comply with UL 181B and shall be marked ia181B-FXlv for pressure-sensitive tape or ia181B-Mls for mastic. Duct connections to flanges of air distribution system equipment or sheet metal fittings shall be mechanically fastened. Crimp joints for round ducts shall have a contact lap of at least 1.5 inches (38 mm) and shall be mechanically fastened by means of at least three sheet metal screws or rivets equally spaced around the joint.
mdshunk is offline   Reply With Quote
Old 03-10-2007, 01:01 AM   #4
Member
 
snapperhead's Avatar
Trade: commercial hvac repair and installations
 
Join Date: Jul 2006
Posts: 65
might want to get a gallon can of the commercial duct sealant they use and just brush it around the joints and holes (with the fan off till it cures)cures supper hard!stay away from just the plain duct tape,use aluminum or the same with a fiber in it...will last forever
snapperhead is offline   Reply With Quote
Old 03-10-2007, 09:23 PM   #5
Astar Heating & A/C CEO
Trade: HVAC Contractor
 
Join Date: Jan 2007
Location: Colorado
Posts: 34
Send a message via Yahoo to FemaleAstarCO
I always tape my joints. I only use metal tape. If it is not available I use "pooky" aka duct sealer. I do not use pooky all the time due to the fact that it takes the neatness out of the install but it works just as well. I do not think it will make a world of difference but I would go ahead and do it anyway it shouldnt harm it unless he is making up for something else that is not right. I have seen contractors leave spaces open on purpose if they have over sized the unit, do not know how to set it up or the blower size is too small to push the heat out fast enough before it goes off on limit. Good luck.
FemaleAstarCO is offline   Reply With Quote
Old 03-11-2007, 10:07 PM   #6
Member
 
Hurley's Avatar
Trade: HVAC/swimming pools
 
Join Date: Mar 2006
Posts: 60
Same here. On new installs alwys tape the joints. Only if it's an old house upgrading to a new service where you might want a bit of seepage. But you mentioned a crawl space and an attic. Not the kinds of places you want to crawl back into if you think you're done the job.
Hurley is offline   Reply With Quote
Old 03-20-2007, 12:59 PM   #7
Registered User
 
acefurnacefxr's Avatar
Trade: HVAC
 
Join Date: Mar 2007
Posts: 19
In our area it is code, tape first then 3 screws..........in that order.
__________________
Our 44 th is the best one yet..........
acefurnacefxr is offline   Reply With Quote
Old 03-20-2007, 01:18 PM   #8
Pro
 
Same Old's Avatar
Trade: Residential General
 
Join Date: Mar 2007
Posts: 398
I understand you CANNOT use "duct" tape per IRC. You must use the metallic tape.
Same Old is offline   Reply With Quote
Old 03-20-2007, 06:26 PM   #9
Registered User
 
acefurnacefxr's Avatar
Trade: HVAC
 
Join Date: Mar 2007
Posts: 19
Duct tape is accepted here.....
__________________
Our 44 th is the best one yet..........
acefurnacefxr is offline   Reply With Quote
Old 03-21-2007, 08:33 AM   #10
Contractor
Trade: Remodeling & Home Additions
 
Join Date: Sep 2006
Location: Delaware
Posts: 1,354
Quote:
Originally Posted by acefurnacefxr View Post
In our area it is code, tape first then 3 screws..........in that order.
what do you mean with 3 screws? Can anyone else confirm this?
72chevy4x4 is offline   Reply With Quote
Old 03-21-2007, 08:40 AM   #11
Pro
Trade: Project Manager/Licensed Remodeler
 
Join Date: Jul 2006
Location: St. Paul, MN
Posts: 757
Quote:
Originally Posted by mdshunk View Post
Was the IRC the code document that covered this job? If so, here you go:

Crimp joints for round ducts shall have a contact lap of at least 1.5 inches (38 mm) and shall be mechanically fastened by means of at least three sheet metal screws or rivets equally spaced around the joint.
Quote:
Originally Posted by 72chevy4x4 View Post
what do you mean with 3 screws? Can anyone else confirm this?

See above quoted code...
Dustball is offline   Reply With Quote
Old 03-21-2007, 09:11 AM   #12
Contractor
Trade: Remodeling & Home Additions
 
Join Date: Sep 2006
Location: Delaware
Posts: 1,354
thanks dustball-I had in my head a previous poster was referring to fibrous ductboard, in which case 3 screws didn't make a lot of sense.

when he says ducttape, is he not referring to the metal ducttape but the 'duck tape'?

When applying metallic ducttape to fibrous ductboard, do you clean the surface first (at all or w/ a particular cleaner)?
72chevy4x4 is offline   Reply With Quote
Old 03-21-2007, 10:46 AM   #13
Registered User
 
acefurnacefxr's Avatar
Trade: HVAC
 
Join Date: Mar 2007
Posts: 19
Cleaning is not normally needed, but if the product is cold, its acceptable to heat it up with a heat gun slightly first, before applying the tape. Then a squiggie (spelling*?) is used to flaten out the tape and remve air bubbles.
__________________
Our 44 th is the best one yet..........
acefurnacefxr is offline   Reply With Quote
Old 03-21-2007, 05:31 PM   #14
Cpt. Chaos
 
PrecisionFloors's Avatar
Trade: Hard Surface Flooring
 
Join Date: Jan 2006
Location: Hampton, VA
Posts: 993
When I say the title to this thread I just had to respond....



Don't that taste like ****?
sorry couldn't help myself.
__________________
Precision Flooring
Hampton, VA (757) 256-0848
Tile, Hardwood, Laminate, and Resilients
Installation, Sales & Repair - "We do it right the FIRST time"
PrecisionFloors is offline   Reply With Quote
Old 05-06-2007, 07:34 PM   #15
Registered User
Trade: plumbing heating &ac
 
Join Date: May 2007
Posts: 9
Im with snapper head use foil tape or duct sealer is the duct insulated if not I would wrap it first
able14 is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Azek butt joints holding up? LeonardDB Finish Carpentry 25 11-15-2009 02:27 AM
Tiling over Concrete Expansion Joints Clueless Ceramic & Stone Tile 16 11-25-2007 11:48 PM
Hardwood Floor Pattern and End Joints 4yanx Flooring 25 07-29-2007 06:14 AM
Bidding strapping and taping old duct work temporarily Brendakeen HVAC 3 05-10-2007 04:52 AM
Expansion joints for underground fed meter cans mdshunk NEC Discussion 12 02-02-2007 03:13 PM




Top of Page | View New Posts


All times are GMT -5. The time now is 06:16 AM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC