Contractor Talk - Construction and Remodeling Site
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Contractor Talk - Professional Construction and Remodeling Forum > Trade Talk > Carpentry > Decks & Fencing

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 08-05-2009, 09:51 PM   #1
Pro
 
redwood's Avatar
Trade: Carpentry Contractor
 
Join Date: Dec 2007
Location: California
Posts: 541
Today's Damage

Here are some shots of a 1200 sq. ft arbor that we are tearing down. It's about 6 years old. Beams, all consisting of 4x12's, were in a 4' x 4' grid. Crossing beams were notched into each other. That was a lot of work, but I'm sure that it looked good when they were finished. Unfortunately, these notched 4x12's were spanning about 18 feet, and many of the joints had begun to rot.
Attached Images
   

__________________
Mark
Los Gatos, CA
www.creative-redwood-designs.com
redwood is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 08-05-2009, 10:27 PM   #2
Pro
 
RobertCDF's Avatar
Trade: Custom deck builder
 
Join Date: Aug 2005
Location: Colorado Springs, Colorado
Posts: 3,065
Tell people "FYI painting joists, beams, and redwood decking will rot it..." Water gets in.... cant get out.
RobertCDF is offline   Reply With Quote
Old 08-05-2009, 10:32 PM   #3
Pro
 
slowforthecones's Avatar
Trade: General Contractor & Fire Protection
 
Join Date: Aug 2008
Location: Moraga, California
Posts: 594
hrm... wonder who did that job.... 6 years and looks really messedup.
slowforthecones is offline   Reply With Quote
Old 08-05-2009, 10:36 PM   #4
chief pencil holder
 
Scribbles's Avatar
Trade: Millwork, Handrail
 
Join Date: Mar 2009
Location: sacramento CA
Posts: 250
i cant beleve it is that bad in just 6 years.
__________________
http://sacramentomillworks.com
Scribbles is offline   Reply With Quote
Old 08-05-2009, 10:51 PM   #5
Pro
 
redwood's Avatar
Trade: Carpentry Contractor
 
Join Date: Dec 2007
Location: California
Posts: 541
I wish I could find the pictures, but, we rebuilt a 3 story apartment complex, that had damage like that after only 5 years. It kept me busy for 2 years. In that case, it was all in the construction details, or lack of.

I caution people against painting these structures, but they sometimes just want that look. The scary thing is that the paint seems to hide a lot of serious damage, before it's too late.

This job also had a lot of notches, where water sits. You guys that notch your posts to allow beams to set in them, better make sure you keep the water out. I don't know if I posted one of the pics, where a notched beam had sunk about 1 1/2" into a notched post.

I have learned so much about correct building techniques, by seeing these failing structures. Especially the young structures that have failed long before they should have.

Another thing about this job that should be a lesson to all. There was ton's of caulking. Every joint. Guess what, it didn't keep the water out. Caulking is for painters, not for waterproofing.
__________________
Mark
Los Gatos, CA
www.creative-redwood-designs.com
redwood is offline   Reply With Quote
Old 08-05-2009, 11:00 PM   #6
Pro
 
slowforthecones's Avatar
Trade: General Contractor & Fire Protection
 
Join Date: Aug 2008
Location: Moraga, California
Posts: 594
redwood...i really like the redwood garage doors you have built....you posted some pics here. What are the costs for one of those. I am doing a re-build of a san francisco residence with a garage addition. My client is looking for garage doors to meet the stupid s.f. planning comission satisfaction.
slowforthecones is offline   Reply With Quote
Old 08-06-2009, 06:03 AM   #7
John Hyatt
 
John Hyatt's Avatar
Trade: out door areas, decks,spa room additions,fire pits
 
Join Date: Jan 2007
Location: Oklahoma City
Posts: 1,088
I am starting a repair on a 6x6 redwood structure I built 12 years ago. 17 ' span on the 6x6 with half lap joint over the posts,lex ann coragated roofing. There must have been a screw alowing water to drip right into the joint rotted that con ht redwood 6x6 right out in one spot.

No paint on this one, supperdeck finish. I have gone with twp latley but that constant drip in one place did it, slow leak is the worst. I have gone to the lex ann sheet roof with two part channel >> Thanks Mac !! << now and the Wallet is understanding but I also have learned attention to very small detail is Everything. J.
John Hyatt is offline   Reply With Quote
Old 08-06-2009, 06:43 AM   #8
Pro
 
tcleve4911's Avatar
Trade: Remodeling contractor
 
Join Date: Mar 2006
Posts: 841
Quote:
Originally Posted by redwood View Post
There was ton's of caulking. Every joint. Guess what, it didn't keep the water out. Caulking is for painters, not for waterproofing.
Agreed.
We've done lots of exposed outdoor structures that are still standing.
How are you going to prevent this from happening again?
What will your details consist of?

Just curious
T
__________________
Remodeler in Maine & Vermont
Finish carpenter
Been doin' this stuff for a long time.................
tcleve4911 is offline   Reply With Quote
Old 08-06-2009, 08:14 AM   #9
Pro
Trade: Deck Builder
 
Join Date: Oct 2007
Location: Austin, Tx.
Posts: 1,041
Quote:
Originally Posted by redwood View Post

I have learned so much about correct building techniques, by seeing these failing structures. Especially the young structures that have failed long before they should have.
You got that right, you tear enough stuff down you learn how not to do things.

I replaced decking once that was 5 years old, spf 2x4's.
__________________
Deckman
www.alscustomdecks.com
deckman22 is online now   Reply With Quote
Old 08-06-2009, 09:43 AM   #10
Pro
 
redwood's Avatar
Trade: Carpentry Contractor
 
Join Date: Dec 2007
Location: California
Posts: 541
There won't be any notches for water to sit in. Blocking will be blocking. UV resistant modified bituthane over the seams.

The owner wants the structure painted again, but this time it will be painted prior to assembly, so that all surfaces will be covered.
__________________
Mark
Los Gatos, CA
www.creative-redwood-designs.com
redwood is offline   Reply With Quote
Old 08-06-2009, 08:18 PM   #11
Member
Trade: Contractor and Trim Carpenter
 
Join Date: Dec 2006
Location: Greenville, SC
Posts: 56
Quote:
Originally Posted by Scribbles View Post
i cant beleve it is that bad in just 6 years.
That is exactly what I was thinking too.....
LEVELBEST is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Cleaning of smoke damage Tahoe Painter Painting & Finish Work 16 01-01-2010 05:07 PM
Storm Damage BPI Business 2 08-15-2009 07:45 AM
Termite damage on Girder in basement, ??? on fix Little Carpentry 3 03-28-2009 05:06 PM
water damage and condensation bigblue General Discussion 2 01-10-2009 01:11 PM
Severe termite damage, how far do you go? beachremodlr Remodeling 4 03-14-2008 09:59 PM


Top of Page | View New Posts


All times are GMT -5. The time now is 04:42 PM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC