Contractor Talk - Construction and Remodeling Site
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Contractor Talk - Professional Construction and Remodeling Forum > Trade Talk > Carpentry > Decks & Fencing

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 09-29-2009, 09:12 AM   #1
Member
Trade: Spec GC
 
Join Date: May 2007
Location: Lake Placid, NY
Posts: 98
Cautions for doing decks close to grade

In a house design I am working on, an entry porch and a screened porch are at opposite sides of a small house, both completely under roof.

In evaluating the options for the floor structures of these spaces, I am wondering what cautions might need to be observed if we do the floors as wood decks supported with concrete piers down to below frostline.

The joists and beams for these decks will sit only a couple inches off grade. What is done to ensure long life of the structure?

UpNorth is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 09-29-2009, 10:01 AM   #2
Pro
 
genecarp's Avatar
Trade: LI,NY designer, new homes, renovation work, concre
 
Join Date: Mar 2008
Location: Long Island, NY
Posts: 4,158
What specifically are your concerns? Obviously no wood to earth contact, footings below frostline/check...G
__________________
genecarp is online now   Reply With Quote
Old 09-29-2009, 11:07 AM   #3
The Duke
 
framerman's Avatar
Trade: Framing, Custom Carpentry, Architectural Design
 
Join Date: Mar 2006
Location: Maine
Posts: 3,782
Blog Entries: 3
That I believe will be a code question only your local CEO will be able to tell you. I'm thinking under 12" you need to take different precautions than usual.
__________________
If one advances confidently in the direction of one's dreams,
and endeavors to live the life which one has imagined,
one will meet with a success unexpected in common hours
~Henry David Thoreau
framerman is offline   Reply With Quote
Old 09-29-2009, 11:23 AM   #4
Pro
 
JonM's Avatar
Trade: Building and Remodeling
 
Join Date: Nov 2007
Location: CONNECTICUT
Posts: 1,084
IRC R319...joists closer then 18" and beams closer then 12" have to be PT
JonM is online now   Reply With Quote
Old 09-29-2009, 11:23 AM   #5
DavidC
 
DavidC's Avatar
Trade: Remodeler
 
Join Date: Feb 2008
Location: NNY
Posts: 1,316
Drainage. You don't want water to sit under there. If you don't have natural drainage consider excavating, landscape cloth and gravel to expedite run off and control weed growth.

Good Luck
Dave
__________________
OK, rant if you must. For the love of Pete, use paragraphs and spell check.
DavidC is online now   Reply With Quote
Old 09-29-2009, 11:58 AM   #6
Pro
 
Greg Di's Avatar
Trade: Remodeling & Decks
 
Join Date: Mar 2005
Location: Bergen County, NJ
Posts: 1,747
Quote:
Originally Posted by DavidC View Post
Drainage. You don't want water to sit under there. If you don't have natural drainage consider excavating, landscape cloth and gravel to expedite run off and control weed growth.

Good Luck
Dave
That's really all you have to do. You'll have minimal water UNDER the deck if there's a roof over it, but even so, control the water and drainage and it's half the battle.
Greg Di is offline   Reply With Quote
Old 09-29-2009, 05:14 PM   #7
Pro
Trade: Deck Builder
 
Join Date: Oct 2007
Location: Austin, Tx.
Posts: 901
What they said about drainage & cross ventilation. Sloped ground & air flow over that ground = no promblems. Gound contact TP too, not the cheapo stuff @ home cheapo.
__________________
Deckman
www.alscustomdecks.com
deckman22 is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Seal Decks Each Year? Mitch M Painting & Finish Work 3 10-06-2009 06:52 PM
installing 6 x 6 posts 8ft above grade jimmyofc General Discussion 13 05-04-2009 06:14 AM
slab on grade mjaafreh2008 Construction 10 02-16-2009 08:35 PM
Grade beam Math skyhook General Discussion 56 01-27-2009 03:48 PM
How close is Close Enough denick Excavation & Site Work 2 03-30-2006 10:38 AM




Top of Page | View New Posts


All times are GMT -5. The time now is 07:56 PM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC