Contractor Talk - Construction and Remodeling Site
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Contractor Talk - Professional Construction and Remodeling Forum > Trade Talk > Electrical

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 11-01-2009, 12:31 PM   #1
Registered User
Trade: architectural designer
 
Join Date: Nov 2009
Posts: 2
ungrounded 3 phase 3 wire service

i am planning a remodel of a restaurant with the following service; in the 400 amp fused disconnect there are (3) fuses, (2) 4/0 thhn conductors, (1) #1 thhn conductor. i get 240 volts between the enclosure box and "A" LEG, and leg "C". i get 120 volt between the enclosure box and leg "B" (CENTER). we have (3) 3-phase roof ac units at 60 amp each. all other loads are single phase 120/240 volt. what do i have? 3 wire open delta? corner grounded 3 wire delta? the small center wire concerns me a lot. the electrical plan checker here in houston is saying that i must have (4) wires for a 3 phase service. the previous tenant (subway) was in this building for about (15) years without any electrical issues with more equipment than we want to use. we were not planning to touch any 3 phase stuff. i do not know if the service pole has (2) or (3) transformers. this service pole is serving other service drops for other buildings, so there are many transformers on the pole. there is nothing 208 volt i could find. does that rule out wye? how would i tell that i had a 3 wire ungrounded delta 3 phase for sure? are where special calculations like 87% if (2) transformers are used open delta ?

JERRYR713 is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 11-01-2009, 05:03 PM   #2
huntington beach, ca.
Trade: electrical
 
Join Date: Oct 2007
Posts: 313
Are you sure you are not in mexico?
hbelectric is offline   Reply With Quote
Old 11-01-2009, 06:08 PM   #3
Registered User
Trade: architectural designer
 
Join Date: Nov 2009
Posts: 2
3 wire 3 phase

not in mexico (the land of no grounding). this works, i just do not know why. the worst wiring i have seem in my life was in the philippines at a high end hotel. i thought i was going to die just looking at it and their low voltage is 240. thanks, i was thinking this an experienced electrician would give me a hint. the nec sort of covers it, but the 240 volt part is what quizzels me. maybe it is a "center-tap grounded open delta", because the 3 phase loads are minimal.
JERRYR713 is offline   Reply With Quote
Old 11-03-2009, 01:13 AM   #4
huntington beach, ca.
Trade: electrical
 
Join Date: Oct 2007
Posts: 313
I never was good at Transformer's connections, so i'm not going to guess.
hbelectric is offline   Reply With Quote
Old 11-03-2009, 07:36 AM   #5
Pro
 
mrmike's Avatar
Trade: Electrical & Carpentry
 
Join Date: Dec 2008
Location: Adirondacks of NY
Posts: 371
Check the transformers on the pole- they may be single phase & they configured them to put out three phase probably hooked up in Delta-Wye according to you voltages..............
mrmike is offline   Reply With Quote
Old 11-03-2009, 10:44 AM   #6
Pro
Trade: Commercial Superintendent
 
Join Date: Mar 2009
Posts: 253
I've built many restaurants, all with three phases power. Why do you care if it is a delta or a wye? The only issue I see is that the electrical contractor may have to bring out a fourth conductor, other than that, shouldn't all you care about is enough amps?
Anti-wingnut is offline   Reply With Quote
Old 11-03-2009, 07:08 PM   #7
Pro
 
kbsparky's Avatar
Trade: Electrical
 
Join Date: Oct 2007
Location: Delmarva, USA
Posts: 141
Sounds like a delta corner grounded service. The smaller conductor is sized according to the loads imposed on the entire 3 phases. Your description suggests that one of the phases is grounded, producing the corner-grounded voltages you are getting.

The "B" phase may be the center tap of one of the windings, which usually is grounded in delta connected configurations.

Your description of "center-tap grounded open delta" might be better stated "center-tap grounded corner delta"

What are your voltage readings from:

A to B? (I'm guessing 120?)
A to C? (you stated 240)
B to C? (208 perhaps?)

A to ground? (You stated 240)
B to ground? (You stated 120)
C to ground? (You stated 240)
kbsparky is offline   Reply With Quote
Old 11-08-2009, 08:14 PM   #8
Registered User
Trade: electrician
 
Join Date: Jan 2009
Posts: 1
Quote:
Originally Posted by kbsparky View Post
Sounds like a delta corner grounded service. The smaller conductor is sized according to the loads imposed on the entire 3 phases. Your description suggests that one of the phases is grounded, producing the corner-grounded voltages you are getting.

The "B" phase may be the center tap of one of the windings, which usually is grounded in delta connected configurations.

Your description of "center-tap grounded open delta" might be better stated "center-tap grounded corner delta"

What are your voltage readings from:

A to B? (I'm guessing 120?)
A to C? (you stated 240)
B to C? (208 perhaps?)

A to ground? (You stated 240)
B to ground? (You stated 120)
C to ground? (You stated 240)

On a corner grounded system, the grounded phase would read 0 volts to ground. So assuming all the op voltage reading are correct, I dont think it is a corner grounded system. just my .02
rms770 is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Calfinder Lead Generation Service mark the coach Marketing & Sales 9 03-04-2009 08:20 PM
Wire Disintegrated LNG24 Electrical 24 11-07-2008 06:14 PM
Outdoor 18 ga wire vs. 18 ga Lamp Cord? Greg Di Electrical 8 10-21-2008 10:42 PM
Service Magic's new service Grumpy Marketing & Sales 12 08-02-2008 03:31 PM
How to Pay Piece Meal and Sleep at Night dirt diggler Business 30 02-12-2007 01:33 PM




Top of Page | View New Posts


All times are GMT -5. The time now is 06:16 PM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC