01-29-2008, 09:47 PM
|
#1
|
|
Bunny by Malco - NY
Trade:
ICF Construction
Join Date: Apr 2007
Location: North of 49
Posts: 2,221
|
Ufur
Just starting a foundation on a new home, electrician normally comes in and installs the ufur prior to inspection so I can pour.
People haven't chose an electrician yet.
House is ICF to the roof.
Do I pour the foundation and let the inspector know the ufur will be installed when we pour the walls? This happened on another job and was acceptable not having the bare copper in the foundation wall/slab.
Can I just install a ufur myself, I know I can, I didn't know if there was a science to it, 200 amp service. I believe I see #6 solid, 20' buried in the concrete and ground clamps attaching it to my rebar, leave enough free to reach the main panel, basically buy 30' and have enough hanging out for the 'future' electrical contractor.
__________________
Chris
|
|
|
Warning: The topics covered on this site include activities in which there exists the potential for serious injury
or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!
Join the #1 Contractor Forum Today - It's Totally Free!
ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!
Join ContractorTalk.com - Click Here

|
01-29-2008, 10:27 PM
|
#2
|
|
Licensed Contractor
Trade:
Electrician
Join Date: Dec 2006
Location: Rahway, New Jersey
Posts: 3,668
|
There is definitely a specific clamp you must use when attaching the #4 copper to the rebar. Someone here will know thew name of the clamp for sure. As an electrician, I have never been on the job to install this clamp.
|
|
|
01-29-2008, 10:31 PM
|
#3
|
|
Licensed Contractor
Trade:
Electrician
Join Date: Dec 2006
Location: Rahway, New Jersey
Posts: 3,668
|
Oh, and not that it matters much, but the correct spelling is Ufer, with an e.
|
|
|
01-29-2008, 10:48 PM
|
#4
|
|
listen twice talk once!
Trade:
electrician
Join Date: Oct 2005
Location: Orange county California
Posts: 591
|
I think all you need is 20 feet of rebar embedded in the concrete with the end sticking up where the panel will be located. Then the clamp is servicable.
|
|
|
01-29-2008, 11:15 PM
|
#5
|
|
Bunny by Malco - NY
Trade:
ICF Construction
Join Date: Apr 2007
Location: North of 49
Posts: 2,221
|
Quote:
Originally Posted by Bkessler
I think all you need is 20 feet of rebar embedded in the concrete with the end sticking up where the panel will be located. Then the clamp is servicable.
|
Yah, that's what we did years back, for the past 3 years I have seen copper line being used, figured it was code change.
__________________
Chris
|
|
|
01-29-2008, 11:27 PM
|
#6
|
|
listen twice talk once!
Trade:
electrician
Join Date: Oct 2005
Location: Orange county California
Posts: 591
|
I have done the copper lining when it is specked out like in schools but I just wired a house in Santa Ana and it was just connect to the 20' of rebar and bond the water line. Although California throws a lot of surprises at ya!
|
|
|
01-29-2008, 11:30 PM
|
#7
|
|
Fentoozler
Trade:
Professional Pie and Pastry Taster
Join Date: May 2007
Location: New Jersey
Posts: 5,589
|
Quote:
|
Originally Posted by 2005 NEC
250.52(A)(3)Concrete-Encased Electrode.
An electrode encased by at least 50 mm (2 in.) of concrete, located within and near the bottom of a concrete foundation or footing that is in direct contact with the earth, consisting of at least 6.0 m (20 ft) of one or more bare or zinc galvanized or other electrically conductive coated steel reinforcing bars or rods of not less than 13 mm (1⁄2 in.) in diameter, or (20 ft) of bare copper conductor consisting of at least 6.0 m not smaller than 4 AWG. Reinforcing bars shall be permitted to be bonded together by the usual steel tie wires or other effective means.
|
Now, go give me something a little better than "orange"....no fruits, no vegetables.
__________________

The UD is quite possibly man kinds finest accomplishment.
Last edited by Celtic; 01-29-2008 at 11:33 PM.
Reason: We need pictures!
|
|
|
01-29-2008, 11:44 PM
|
#8
|
|
Bunny by Malco - NY
Trade:
ICF Construction
Join Date: Apr 2007
Location: North of 49
Posts: 2,221
|
Thank you MR. Celtic, I'll give you a new color option.
Not trying to split hairs here, can you define 'Direct Contact with Earth', the reason I ask, we are building on solid rock, no undisturbed earth within 100' of the new house (and even that is shallow (<2' deep) because of the rock we are on) other than the fill being brought in for landscape purposes at the end of the job.
__________________
Chris
|
|
|
01-29-2008, 11:54 PM
|
#9
|
|
Fentoozler
Trade:
Professional Pie and Pastry Taster
Join Date: May 2007
Location: New Jersey
Posts: 5,589
|
The pour would need to be in direct contact with the earth(dirt)...which you seem to have none of
How is the plumbing being brought in on this site?
__________________

The UD is quite possibly man kinds finest accomplishment.
|
|
|
01-30-2008, 12:03 AM
|
#10
|
|
Bunny by Malco - NY
Trade:
ICF Construction
Join Date: Apr 2007
Location: North of 49
Posts: 2,221
|
Footings/foundation directly on rock, between 36" and 12" of 3/4 clear inside the house, plumbing gets put in that out the front (36" area) and taken to a holding tank/ejector tank, then pumped another 300+' to the septic tank and out to the field. 'Earth' fill will be brought in around the exterior of the house for landscape and to create drainage...No Basements in my neighborhood...unless your the bank.
So plumbings not an issue. What about the Ufer? Is this going to be an issue?
__________________
Chris
|
|
|
01-30-2008, 12:06 AM
|
#11
|
|
Fentoozler
Trade:
Professional Pie and Pastry Taster
Join Date: May 2007
Location: New Jersey
Posts: 5,589
|
Quote:
Originally Posted by Chris Johnson
So plumbings not an issue. What about the Ufer? Is this going to be an issue?
|
I asked about the plumbing because of the way the code is written....IF you have a footing w/earth ~ go with the ufer(#3 in the image).....if NOT, copper plumbing(#1 in the image) would be a choice ~ IF in contact w/earth for 10' .
Quote:
(1) Metal Underground Water Pipe.
A metal underground water pipe in direct contact with the earth for 3.0 m (10 ft) or more (including any metal well casing effectively bonded to the pipe) and electrically continuous (or made electrically continuous by bonding around insulating joints or insulating pipe) to the points of connection of the grounding electrode conductor and the bonding conductors. Interior metal water piping located more than 1.52 m (5 ft) from the point of entrance to the building shall not be used as a part of the grounding electrode system or as a conductor to interconnect electrodes that are part of the grounding electrode system.
|
__________________

The UD is quite possibly man kinds finest accomplishment.
Last edited by Celtic; 01-30-2008 at 12:08 AM.
|
|
|
01-30-2008, 12:09 AM
|
#12
|
|
Bunny by Malco - NY
Trade:
ICF Construction
Join Date: Apr 2007
Location: North of 49
Posts: 2,221
|
There is a well somewhere on the property, all the water feeds I've seen so far are the dreaded PVC.
Sounds like I pull the inspector in early, this sounds like a questionable thing only he can answer.
__________________
Chris
|
|
|
01-30-2008, 12:10 AM
|
#13
|
|
listen twice talk once!
Trade:
electrician
Join Date: Oct 2005
Location: Orange county California
Posts: 591
|
I think building on rock constitutes being in contact with earth. what do you know about two service drops for one property?
|
|
|
01-30-2008, 12:13 AM
|
#14
|
|
Bunny by Malco - NY
Trade:
ICF Construction
Join Date: Apr 2007
Location: North of 49
Posts: 2,221
|
Quote:
Originally Posted by Bkessler
what do you know about two service drops for one property?
|
I ran into this one last year, ask for an upgraded service from PG&E...no charge, do a new service and bend over  they won't even kiss you
__________________
Chris
|
|
|
01-30-2008, 12:16 AM
|
#15
|
|
Fentoozler
Trade:
Professional Pie and Pastry Taster
Join Date: May 2007
Location: New Jersey
Posts: 5,589
|
Quote:
Originally Posted by Chris Johnson
There is a well somewhere on the property, all the water feeds I've seen so far are the dreaded PVC.
Sounds like I pull the inspector in early, this sounds like a questionable thing only he can answer.
|
I agree.
From the description given, it really needs a set of eyes on it and whats around that can be used here.
Sorry.
__________________

The UD is quite possibly man kinds finest accomplishment.
|
|
|
01-30-2008, 12:18 AM
|
#16
|
|
Fentoozler
Trade:
Professional Pie and Pastry Taster
Join Date: May 2007
Location: New Jersey
Posts: 5,589
|
Quote:
Originally Posted by Bkessler
I think building on rock constitutes being in contact with earth.
|
Is rock conductive?
I know we have driven rods 20+ feet and added some pixie dust in rough terrain.
Quote:
Originally Posted by Bkessler
what do you know about two service drops for one property?
|
I dunno?
What do you want to know?
I do know you should probably start a new thread for extra eyes
__________________

The UD is quite possibly man kinds finest accomplishment.
|
|
|
01-30-2008, 12:19 AM
|
#17
|
|
listen twice talk once!
Trade:
electrician
Join Date: Oct 2005
Location: Orange county California
Posts: 591
|
I did start it an hour ago there's just been no reply's.
|
|
|
01-30-2008, 09:54 AM
|
#18
|
|
REG EC,CERT EI PLANS EXAM
Trade:
electrical
Join Date: Nov 2007
Location: western pennsylvania
Posts: 165
|
Hi Everybody
I understand what the code says but,
Anyone ever heard that copper on rock under the footer will crack it in a lightning hit ,your suppost to cover it with gem, so it absorbs water and has a place to expand so it dosent crack the footer
also the grounding detail celtic shows isnt everything suppost to be terminated on a buss bar?
|
|
|
01-30-2008, 10:37 AM
|
#19
|
|
Thom
Trade:
General Contractor/Homebuilder
Join Date: Nov 2006
Location: Albuquerque NM
Posts: 2,190
|
Boy, you guys do your ufers differently than we do.
Our foundations are not deep, there is no frost heave here, so we go 16" below grade minimum.
The footing has two parallel pieces of rebar, continuous (lapped and tied joints all). One piece of rebar is bent up, projecting up through the footing and stemwall where it terminates above grade. The electrician attaches his bonding wire to the rebar with a standard ground clamp, in the wall. the connection must be accessible so we screw a mud ring to the stud adjacent to the connection and put a double blank cover on it.
|
|
|
01-30-2008, 08:19 PM
|
#20
|
|
Pro
Trade:
Electrical
Join Date: Dec 2007
Posts: 100
|
The concrete guys around here will either bend the rebar up inside where the wall will be underneath the future panel, or if they're pouring a slab they will leave a long piece of bar out past the forms so we can connect to the rebar outside the building just like if it was a ground rod
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate This Thread |
Linear Mode
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|