|
|
Thread Tools | Search this Thread | Display Modes |
|
|
#1 |
|
Member
Trade: General Carpentry
Join Date: Jan 2007
Location: Northeast
Posts: 49
|
Transition From The 3/4 PVC To NM
What is the best way to transition from this 3/4 PVC Conduit entering my basement to the Romex that goes to the panel. This is a single 20AMP branch circuit that is going to goto a detached garage.
Assume the foundation walls can get damp at times (this is a old stone foundation) I would like to have the splice from THWN to Romex done above ground level. (this is just 'incase' water ever leaked into the conduit underground. |
|
|
|
|
|
#2 |
|
Member
Trade: General Carpentry
Join Date: Jan 2007
Location: Northeast
Posts: 49
|
Re: Transition From The 3/4 PVC To NM
I was thinking I would do a 3/4" PVC LB and have the conduit go up into a 4x4 steel box and do the splice.
What other options do I have, that may be cleaner looking. |
|
|
|
|
|
#3 |
|
Member
Trade: NJ Lic Electrical Contractor
Join Date: Jun 2007
Location: NJ~PA
Posts: 67
|
Re: Transition From The 3/4 PVC To NM
Your idea is fine, the only other way would be to eliminate the splice all together and use a 3/4 male adaptor to 3/4 threaded coupling to seal tite fitting (the non metallic type) run seal tite to the panel. Just make sure your THWN's are long enough to go to the panel.
__________________
" For all those whom beleive in Telekinesis, Raise my Right Arm" |
|
|
|
|
|
#4 |
|
Electrical Contractor
Trade: Electrical Contractor
Join Date: Mar 2004
Location: Newnan GA
Posts: 744
|
Re: Transition From The 3/4 PVC To NM
This question has been answered in at least two forums.
All of the answers have been about the same. Are you looking for another answer?
__________________
We are the people (our parents warned us about) (Jimmy Buffett) |
|
|
|
|
|
#5 |
|
Pro
Trade: Squirrel Handler
Join Date: May 2006
Location: Chicago
Posts: 3,432
|
Re: Transition From The 3/4 PVC To NM
You need to do something with your lawn, it's a mess, kiddin', great illustration. I'd put a box where it come in and run emt (we have to out here) to the panel, no splices, loop the wires in the box.
What I would do if the pvc isn't already in and through the wall (potential water (maybe radon) leak around conduit), is put a 90 outside before the wall and bring it above ground then an LB into the house to a box and then romex to the panel. Last edited by mickeyco; 06-19-2007 at 02:35 PM. |
|
|
|
|
|
#6 | |
|
Member
Trade: General Carpentry
Join Date: Jan 2007
Location: Northeast
Posts: 49
|
Re: Transition From The 3/4 PVC To NMQuote:
Why are you required in your area to EMT all the way to the panel? Most basements I see are all Romex running along or through the joists. Thanks. Last edited by remster; 06-19-2007 at 02:39 PM. |
|
|
|
|
|
|
#7 |
|
Pro
Trade: Squirrel Handler
Join Date: May 2006
Location: Chicago
Posts: 3,432
|
Re: Transition From The 3/4 PVC To NM
It's the law, everything in metallic conduit (emt), we aren't allowed to use romex, or PVC for that matter, but romex is readily available, with all the accessories at the local Wal Mart and Home centers, don't know why.
|
|
|
|
|
|
#8 | |
|
Pro
Trade: Squirrel Handler
Join Date: May 2006
Location: Chicago
Posts: 3,432
|
Re: Transition From The 3/4 PVC To NMQuote:
remster, Electricity is dangerous and if you're a DIY'er there's a forum for that at: http://www.diychatroom.com/ |
|
|
|
|
|
|
#9 | |
|
Member
Trade: General Carpentry
Join Date: Jan 2007
Location: Northeast
Posts: 49
|
Re: Transition From The 3/4 PVC To NMQuote:
|
|
|
|
|
|
|
#10 |
|
Pro
Trade: Squirrel Handler
Join Date: May 2006
Location: Chicago
Posts: 3,432
|
Re: Transition From The 3/4 PVC To NM
Cool, good luck with the project.
|
|
|
|
|
|
#11 |
|
Member
Trade: NJ Lic Electrical Contractor
Join Date: Jun 2007
Location: NJ~PA
Posts: 67
|
Re: Transition From The 3/4 PVC To NM
They did the same thing in a city in Penna micky, I think they fought it and won but they use to call it the "fire zone" it was from the river 4 blocks over and so many other blocks the other way, but when PA made into law the uniform construction code that went out the window and they couldnt enforce it anymore...
__________________
" For all those whom beleive in Telekinesis, Raise my Right Arm" |
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| HELP - Transition at angle between floor and carpet | rajrajput | Flooring | 1 | 07-19-2007 08:40 PM |
| Glass Block Transition | Paul_NJ | Ceramic & Stone Tile | 0 | 03-15-2007 08:14 AM |
| Pitched to flat transition | reveivl | Roofing | 17 | 05-31-2006 04:02 PM |
| hardwood to berber transition? | badassdak20 | Flooring | 5 | 01-30-2006 02:09 AM |
| best transition? | mike959 | Flooring | 11 | 01-04-2006 10:41 PM |
| Go to Page... |
