|
|
Thread Tools | Search this Thread | Display Modes |
|
|
#21 | |
|
Baltimore Electrician
Trade: Electrician
Join Date: Jan 2007
Location: Baltimore, MD
Posts: 1,249
|
Re: Switch Plate Screws
They actually have an NEC amendment requiring the plate screws to be oriented vertically?
__________________
John from Baltimore "One Day at a Time" All replies based on the 2008 NEC Quote:
|
|
|
|
|
|
|
#22 |
|
Member
Trade: Electrical
Join Date: Nov 2008
Location: NJ
Posts: 77
|
Re: Switch Plate Screws
Toggles = Vertical, everything else = horizontal. Don't ask me why because I'm not sure why.
|
|
|
|
|
|
#23 |
|
Pro
Trade: Licensed Electrical Contractor and Remodeler
Join Date: Sep 2009
Location: Chicago Suburbs
Posts: 7,016
|
Re: Switch Plate Screws
I hope this is not off the subject, but it is related and I've never been given a good explanation nor could I figure it out.
In suburban Chicago, EVERYTHING must be run in EMT. Romex is not allowed except anywhere near the city. However, local custom is to install receptactles the opposite way than the NEC requires. (For vertical receptacles, ground down, and horizontal receptacles, hot on top). It runs completely contrary to the reason for the NEC requirement. (That is if a metal cover plate becomes loose, they want gravity to have it drop on the most harmless thing) Does anyone know why our area is different?
__________________
220...221...whatever it takes! |
|
|
|
|
|
#24 | |
|
Fentoozler
Trade: Professional Pie and Pastry Taster
Join Date: May 2007
Location: New Jersey
Posts: 5,585
|
Re: Switch Plate ScrewsQuote:
Tell me where to find this NEC requirement..... I'll give you a hint.....under the Lochness Monster's pillow.
__________________
|
|
|
|
|
|
|
#25 |
|
Pro
Trade: Licensed Electrical Contractor and Remodeler
Join Date: Sep 2009
Location: Chicago Suburbs
Posts: 7,016
|
Re: Switch Plate Screws
LOL Celtic
My point exactly. It has ALWAYS baffled me. If you dont believe me, fly to O'Hare Airport and spend a few minutes in our area. This is "just how they are placed here" If you think I am exaggerating, check with Angus. He is from this area too. It defies NEC logic but always done here.
__________________
220...221...whatever it takes! |
|
|
|
|
|
#26 | |
|
And I do electrical, too!
Trade: DEFENDER OF FREEDOM! ADVOCATE OF LIBERTY!
Join Date: Jan 2009
Location: Iowa
Posts: 5,409
|
Re: Switch Plate ScrewsQuote:
Ground up/down is not, not has it ever been, an NEC dictum.
__________________
Site : the area or exact plot of ground on which anything is, has been, or is to be located. Sight : The power or faculty of seeing; perception of objects by use of the eyes; vision. Cite : To mention in support, proof, or confirmation; refer to as an example. |
|
|
|
|
|
|
#27 |
|
Fentoozler
Trade: Professional Pie and Pastry Taster
Join Date: May 2007
Location: New Jersey
Posts: 5,585
|
Re: Switch Plate ScrewsWhat NEC logic? The NEC has no requirement for up/down ~ therefore logic is not a factor in the equation.....Chicago decided they would make the decision to the question of up/down.
__________________
|
|
|
|
| The Following User Says Thank You to Celtic For This Useful Post: | rselectric1 (09-24-2009) |
|
|
#28 |
|
Pro
Trade: Licensed Electrical Contractor and Remodeler
Join Date: Sep 2009
Location: Chicago Suburbs
Posts: 7,016
|
Re: Switch Plate Screws![]() I think you guys actually believe I am making this up. Let's phone a friend-Angus The easter bunny has me on his blocked senders list.
__________________
220...221...whatever it takes! |
|
|
|
|
|
#29 | |
|
Smart phone? Scan me!
Trade: Painting/Framing/Drywall
Join Date: Nov 2008
Location: tWiliGht zOne
Posts: 2,118
|
Re: Switch Plate ScrewsQuote:
|
|
|
|
|
|
|
#30 | |
|
Fentoozler
Trade: Professional Pie and Pastry Taster
Join Date: May 2007
Location: New Jersey
Posts: 5,585
|
Re: Switch Plate ScrewsQuote:
I do NOT believe you when you say the NEC gives a crap about up/down. The easy way to prove it is to simply post the article number
__________________
|
|
|
|
|
| The Following User Says Thank You to Celtic For This Useful Post: | rselectric1 (09-24-2009) |
|
|
#31 |
|
Pro
Trade: Licensed Electrical Contractor and Remodeler
Join Date: Sep 2009
Location: Chicago Suburbs
Posts: 7,016
|
Re: Switch Plate Screws
You guys are good. I just checked 406.4 and you are right. It doesn't list a requirement.
It's funny how some things just get stuck in your head over the years. (The theory is correct, but it really isn't required) Thanks for the reality check guys. Now I can sleep well at night (as long as I use plastic cover plates )
__________________
220...221...whatever it takes! Last edited by rselectric1; 09-24-2009 at 08:36 PM. |
|
|
|
|
|
#32 | |
|
And I do electrical, too!
Trade: DEFENDER OF FREEDOM! ADVOCATE OF LIBERTY!
Join Date: Jan 2009
Location: Iowa
Posts: 5,409
|
Re: Switch Plate ScrewsQuote:
__________________
Site : the area or exact plot of ground on which anything is, has been, or is to be located. Sight : The power or faculty of seeing; perception of objects by use of the eyes; vision. Cite : To mention in support, proof, or confirmation; refer to as an example. |
|
|
|
|
| The Following User Says Thank You to 480sparky For This Useful Post: | rselectric1 (09-24-2009) |
|
|
#33 |
|
Smart phone? Scan me!
Trade: Painting/Framing/Drywall
Join Date: Nov 2008
Location: tWiliGht zOne
Posts: 2,118
|
Re: Switch Plate Screws
when it comes to local code though.. the AHJ is > All. Correct?
|
|
|
|
|
|
#34 | |
|
Electrical Contractor
Trade: Electrical
Join Date: Sep 2003
Location: NY State
Posts: 2,179
|
Re: Switch Plate ScrewsQuote:
There is NO WAY there is a requirement for something completely aesthetic. I would need to see concrete proof.
__________________
|
|
|
|
|
|
|
#35 |
|
Electrical Contractor
Trade: Electrical
Join Date: Sep 2003
Location: NY State
Posts: 2,179
|
Re: Switch Plate Screws
I think a lot of guys from places like Chicago and NYC believe their local amendments are national or NEC codes simply from doing the same thing for so long they just don't know any different, and assume every place is the same.
__________________
|
|
|
|
|
|
#36 | |
|
Fentoozler
Trade: Professional Pie and Pastry Taster
Join Date: May 2007
Location: New Jersey
Posts: 5,585
|
Re: Switch Plate ScrewsQuote:
Without a doubt. The AHJ/EI's even have their own code book/s: ![]() ![]()
__________________
|
|
|
|
|
|
|
#37 |
|
Smart phone? Scan me!
Trade: Painting/Framing/Drywall
Join Date: Nov 2008
Location: tWiliGht zOne
Posts: 2,118
|
Re: Switch Plate Screws |
|
|
|
|
|
#38 |
|
ampman
Trade: providing pathways for electrons and protons
Join Date: Apr 2009
Location: central florida
Posts: 778
|
Re: Switch Plate Screws
no i was just kidding but this is what we tell the greehorns around here its by the NEC only no local codes at all
__________________
an army of sheep lead by a lion will defeat an army of lions lead by a sheep |
|
|
|
|
|
#39 |
|
Pro
Trade: Former Electrician
Join Date: Apr 2005
Location: Finksburg, MD
Posts: 304
|
Re: Switch Plate Screws
All I can say is if the screws are not vertical I know that either the place was painted or there has been someone other than a real electrician in the box.
Rob |
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Deck Screws vs Joist Nails | subybohn | Decks & Fencing | 100 | 11-25-2009 03:52 PM |
| Multiple fixtures on switch loop | KenHaynes | Electrical | 2 | 12-05-2007 03:15 PM |
| light switch plate blank | darren | Electrical | 12 | 06-14-2007 08:06 PM |
| smart light switch circuit | toastermaker | Electrical | 7 | 12-07-2005 11:45 PM |
| Go to Page... |
