Old 09-30-2009, 02:28 PM   #1
Registered User
Trade: Electrician
 
Join Date: Aug 2008
Location: NJ
Posts: 5
Rough inspection

Hello, I am doing a basment remodel, my question is does the inspectors want to see the recessed lights in place, (it will be a drop ceiling)

I know all the other items that have to be done just not sure about the lights, I was just going to drop a temp light where the first light would go.

Thanks.

artisanelect is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 09-30-2009, 02:42 PM   #2
Electron Flow Manipulator
 
480sparky's Avatar
Trade: Electrons for cash
 
Join Date: Jan 2009
Location: Iowa
Posts: 1,434
I've never had an inspector require recessed cans in place for a rough if it's going to be a drop ceiling.
__________________
Age is just a number but mine is unlisted.
480sparky is online now   Reply With Quote
Old 09-30-2009, 02:52 PM   #3
Registered User
Trade: Electrician
 
Join Date: Aug 2008
Location: NJ
Posts: 5
Thanks, thats what I was thinking, I just wanted to double check.
artisanelect is offline   Reply With Quote
Old 09-30-2009, 04:40 PM   #4
Fentoozler
 
Celtic's Avatar
Trade: Professional Pie and Pastry Taster
 
Join Date: May 2007
Location: New Jersey
Posts: 5,589
Quote:
Originally Posted by 480sparky View Post
I've never had an inspector require recessed cans in place for a rough if it's going to be a drop ceiling.
Around here they are usually installed somewhere between the "rough" and "final" inspection....but BEFORE the ceiling inspection
__________________


The UD is quite possibly man kinds finest accomplishment.
Celtic is offline   Reply With Quote
Old 09-30-2009, 05:00 PM   #5
God Bless America
 
Magnettica's Avatar
Trade: Electrician
 
Join Date: Dec 2006
Location: Rahway, New Jersey
Posts: 3,400
Tell the inspector of your plan (how many lights, etc), then offer to leave a tile or two open so he'll be able to see the work.
__________________
Classic Electric LLC
Repairs, Renovations, Rehabilitation
Magnettica is offline   Reply With Quote
The Following User Says Thank You to Magnettica For This Useful Post:
ampman (09-30-2009)
Old 10-06-2009, 12:41 PM   #6
Member
Trade: Electrical Contractor
 
Join Date: Sep 2009
Location: Atlanta, Georgia
Posts: 44
You can do it two ways. First, the commercial building way where you get a wall cover, ceiling cover, and final. We use this method for basements with drop ceilings. The second method is to install all the recessed lights (putting in the tiles you need for the lights yourself) and call of the rough. Either way, a good inspector will want a ladder set up and a ceiling tile removed on the final as well.
Ohmy is offline   Reply With Quote
Old 10-11-2009, 03:32 AM   #7
huntington beach, ca.
Trade: electrical
 
Join Date: Oct 2007
Posts: 313
If the ceiling grid is in, then put the tile in and install the can. Obviously if there is no grid you , you could just hang the can. Can lights are rough, so better install it.
hbelectric is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Heat Exchanger Inspection Methods Symposium MechAcc HVAC 3 08-15-2009 01:10 PM
Ahh it's a good day today! But a rough week J-Peffer Roofing 4 09-01-2008 01:06 AM
rough in inspection chris n General Discussion 10 09-27-2007 05:10 PM
Residential Rough in Estimate Central Florida Surface Tension Plumbing 7 06-16-2007 11:23 PM




Top of Page | View New Posts


All times are GMT -5. The time now is 02:51 PM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC