New Construction, Price Per Device Box
OK Guys, I am getting ready to bid on a 3000' sq.ft. ranch over a basement. House is in the country and owner plans on using a wood burner with damper's for main source of heat. As of now my only overhead is my liability insurance, bonding, truck pmt, and some ads in local paper. I need to come up with a good price per device box. And is the 200 amp underground service an additional price itemized or is that included in the per device box price. Also should my bid price include ceiling fans, and all lighting? I am so new to this...Thanks in advance
|
|
|
|
|
|
#2 |
|
Pro
Trade: General Contractor
Join Date: Jan 2006
Location: Chicago
Posts: 1,370
|
Re: New Construction, Price Per Device Box
Wood burner with damper as a main source of heat?
I did not know that this was still done. House must come with an outhouse also. But, I am not an electrician and will let them answer the gist of your post. |
|
|
|
|
|
#3 | |
|
DGR,IABD
Trade: Electrical; Commercial and Residential Service
Join Date: Mar 2005
Location: Central PA
Posts: 9,680
|
Re: New Construction, Price Per Device BoxQuote:
Different geographical areas have their own odd ways of heating in cooling. You'll find coal furnaces in PA and West VA. You'll find oil fired furnaces mostly only in the northeast. You'll find evaporative coolers mostly onto in the southwest. Just depends on where you live. |
|
|
|
|
|
|
#4 |
|
Pro
Trade: General Contractor
Join Date: Jan 2006
Location: Chicago
Posts: 1,370
|
Re: New Construction, Price Per Device Box
Wow, I learned something today.
I figured that the majority of the new homes (not summer get aways) were being heated by propane fuel. Thats what I get for assuming.... |
|
|
|
|
|
#5 | |
|
Pro
Trade: Master Electrican, Electrical Contractor
Join Date: Sep 2005
Posts: 348
|
Re: New Construction, Price Per Device BoxQuote:
Good Luck.http://www.masterplumbers.com/utilities/costcalc/ |
|
|
|
|
|
|
#6 |
|
Philadelphia electrician
Trade: Electrical contractor
Join Date: Mar 2006
Location: King of Prussia, PA [Philadelphia]
Posts: 346
|
Re: New Construction, Price Per Device Box
I just used this calculator to figure a rate, and it fell dead on what I charge, which is the product of a somewhat less sophisticated, and more emotionally directed, process!
This thingie actually makes you think about how your business works. GREAT! Thanks for sharing! |
|
|
|
|
|
#7 | |
|
Class A Contractor "BLD"
Trade: Remodeling and home improvements
Join Date: Feb 2006
Location: Virginia Beach, Va.
Posts: 1,286
|
Re: New Construction, Price Per Device BoxQuote:
__________________
Looks like some pros were here. |
|
|
|
|
|
|
#8 |
|
Member
Trade: Electrician - Self empl.
Join Date: May 2006
Location: Winnipeg, Canada
Posts: 86
|
Re: New Construction, Price Per Device Box
First analyse your OVERHEAD. You are missing about 70% of it.
You must be new at contracting! It shows up just before bankruptsy. As time goes by you loose sense of how much your expenses are and how much you owe on materials. I don`t like it but I have no choice to spend 5 minutes after filling in at the pump, or when in a hurry buying materials etc. ENTERING transactions - the expenses and the purchases etc. as soon as they occur will keep you up to date as long as you keep adding them every week or so. Don`t forget to factor in the insurance, licences, or other things that you must pay once a year. You should do OK if you add 50% on top of your estimate. add all items (points, openings, whatever you call them) it will take one hour each or more if extra outdoor lights, fans, pot lights, other controls etc. ( a 4 gang sw box is 4 openings = 4 hrs and so on.) So many points x $70.00 = labor + all materials & equipment, fixtures etc. + permit + arc fault c. breakers and all gfci`s. Remember that you have to be a quick worker to use only one hour per point. You will realize this only when you do the finishing. Roughing in only takes 23 minutes for each item (using roomex) - but you are far from being at half way. Remember to add numerous trips to the site because somebody else is not yet finished for you to continue, others will slow you down and you may not have other job to go to. Also add about 6 hrs off site for initial job preperations etc. I know that somebody will certainly disagree with me - I would wonder how old is the vehicle they drive, quality of life they have etc. Be smart - I made all those mistakes initially. P.S. The service price is calculated by itself. It is not included above. You may still be travelling to this home one year from now if this is a private homeowner construction. Good luck - MDC Last edited by mdcorreia; 10-13-2006 at 03:28 AM. Reason: Forgot to mention about the 200 amp Service |
|
|
|
![]() |