|
X2, i write it up as an extra. It is extra work IMO and i treat it as so, customer cannot expect you to lose time/money for unforeseen problems. I broke a lug off in a meter socket this spring when upgrading the wire from the meter socket to the dis-connect "meter socket was new and live, dis-connect was new", i charged the HO for a new meter socket but only removed the lug that i needed and installed it in the live socket. Yes it was unforeseen, NO i just couldnt buy the lug that day, NO i didnt over tighten the lug as it was installed by someone else, Yes i repaired the problem correctly. Now this repair took a good hour to do as i had to unhook my trailer, find a new meter socket in town, dismantle the socket and then repair, no way was i going to flip the bill. Sorry for the long response.
__________________
06 Chevy D-Max ECSB, 8' Fisher plow, 6' Salty Dogg in bed sander,
06 Chevy D-Max RCLB, 8' Fisher plow, 98 Sumitomo mini excavator, 96 7k 16' Phoenix car trailer, 06 12K 18' Cam-Superline equipment trailer
04 7k 6'X10' Kristi dump trailer, 07 7k 7X14 Continental V-nose enclosed trailer
|