200a + 100a Cut-offs On 200a Service


Is it ok to parallel a 100a cut-off switch to a 200a cut-off on a 200amp meter base, like in included diagram?

Thanks!
Attached Thumbnails
200a + 100a cut-offs on 200a service-shop-hookup1.gif  

ndavid79 is offline  
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Old 11-26-2008, 07:26 AM   #2
Electrical Contractor
 
Speedy Petey's Avatar
 
Trade: Electrical
Join Date: Sep 2003
Location: NY State
Posts: 2,179

Re: 200a + 100a Cut-offs On 200a Service


ABSOLUTELY NOT. You would need a trough under the meter to make those splices. You CANNOT make splices in the meter pan and you cannot double lug a meter pan with single lugs.


BTW, in you drawing above (very nice I must say) the green wire should be white. I know the background is white, but I thought I'd mention it.
__________________

Speedy Petey is offline  
Old 11-26-2008, 07:29 AM   #3
Electrical Contractor
 
Speedy Petey's Avatar
 
Trade: Electrical
Join Date: Sep 2003
Location: NY State
Posts: 2,179

Re: 200a + 100a Cut-offs On 200a Service


Oh, to answer the questions in blue.
The neutral would get bonded in both disconnects, and a 3-wire feeder run to the buildings. This is unless you are under the 2008 NEC, in which case a 4-wire feeder must be run.

Actually since this is a trailer there should be a 4-wire feeder to it also. I don't think it was ever legal to run a 3-wire feeder to a trailer.
__________________

Speedy Petey is offline  
Old 11-26-2008, 04:55 PM   #4
DGR,IABD
 
mdshunk's Avatar
 
Trade: Electrical; Commercial and Residential Service
Join Date: Mar 2005
Location: Central PA
Posts: 9,680

Re: 200a + 100a Cut-offs On 200a Service


I need to disagree with Peter, at least for a little bit here, which I don't think has ever happened. You can put Polaris bugs in the meter can to do what you want if there's room in the meter can. I'd use bigger Polaris bugs than you show so that the run wire that you're tapping can accomodate a 4/0 or a 250 MCM. Just don't double lug the meter can's lugs. There may be power company rules against Polaris bugs in the meter can, in which case you'll need a trough like Peter describes.

Last edited by mdshunk; 11-26-2008 at 04:59 PM.
mdshunk is offline  
Old 11-26-2008, 06:14 PM   #5
Thom
 
thom's Avatar
 
Trade: General Contractor/Homebuilder
Join Date: Nov 2006
Location: Albuquerque NM
Posts: 3,197

Re: 200a + 100a Cut-offs On 200a Service


It looks like your set-up would allow a 300A draw through a 200A meter base. You don't give us the service wire capacity but it's probably overloaded also.
thom is offline  
Old 11-26-2008, 07:10 PM   #6
DGR,IABD
 
mdshunk's Avatar
 
Trade: Electrical; Commercial and Residential Service
Join Date: Mar 2005
Location: Central PA
Posts: 9,680

Re: 200a + 100a Cut-offs On 200a Service


Quote:
Originally Posted by thom View Post
It looks like your set-up would allow a 300A draw through a 200A meter base.
Not if he did a calc. That setup is 100% legal if the calc shows less than 200 amps. You could connect a million amps worth of "mains" off a 200 amp meter can as long as your calculated load was less than 200 amps.
mdshunk is offline  
Old 11-26-2008, 09:03 PM   #7
Thom
 
thom's Avatar
 
Trade: General Contractor/Homebuilder
Join Date: Nov 2006
Location: Albuquerque NM
Posts: 3,197

Re: 200a + 100a Cut-offs On 200a Service


Quote:
Originally Posted by mdshunk View Post
Not if he did a calc. That setup is 100% legal if the calc shows less than 200 amps. You could connect a million amps worth of "mains" off a 200 amp meter can as long as your calculated load was less than 200 amps.

Interesting. Here, we supply the wire in an overhead mast (the poco supplies the wire in an underground feed). The wire size we must supply is determined by the overcurrent device(s) installed.

Your scenario, sizing based on calculated load, assumes that additional loads will not be imposed even though you have provided for that possibility. That seems like a dangerous assumption to me. Our PoCo would not allow it.

Maybe that's the difference. Not only are we required to meet the NEC rules but also the PoCo rules. They provide us with a book detailing their installation requirements. If we don't meet their requirements, they won't connect us up.
thom is offline  
Old 11-26-2008, 09:50 PM   #8
Service & Repairs
 
Magnettica's Avatar
 
Trade: Electrician
Join Date: Dec 2006
Location: Rahway, New Jersey
Posts: 3,998

Re: 200a + 100a Cut-offs On 200a Service


If I have (25) 15 amp circuit breakers, and (15) 20 amp breakers, doesn't that mean I need a 675 amp panel?

Ha ha - just kidding.
Magnettica is offline  
Old 11-26-2008, 11:27 PM   #9
Pro
 
kbsparky's Avatar
 
Trade: Electrical
Join Date: Oct 2007
Location: Delmarva, USA
Posts: 155

Re: 200a + 100a Cut-offs On 200a Service


Why not use a feed-thru panel, or better yet, a combo meter/service/feed-thru box?

One such panel would look like this:



You can merely plug in your 100 Amp breaker for the garage feeder.
kbsparky is offline  
Old 11-27-2008, 12:55 AM   #10
Registered User
 
ndavid79's Avatar
 
Trade: Woodwork
Join Date: Nov 2008
Posts: 2

Re: 200a + 100a Cut-offs On 200a Service


Thanks everyone for your help/comments... So it is ok to do that if spliced properly? (would never double up wire in a single lug, thats just askin for trouble) I really thought it wasn't. Ok, would it be better to do the splice in the Trailer disconnect box (much more space in there)?
I do plan to go with next size up (250) polaris bugs.

Thanks!

Last edited by ndavid79; 11-27-2008 at 02:05 AM.
ndavid79 is offline  
Old 11-27-2008, 11:33 AM   #11
Pro
 
acrwc10's Avatar
 
Trade: Electrical contractor/General contractor/ ICC certified electrical inspector
Join Date: Dec 2006
Posts: 211

Re: 200a + 100a Cut-offs On 200a Service


Quote:
Originally Posted by ndavid79 View Post
Is it ok to parallel a 100a cut-off switch to a 200a cut-off on a 200amp meter base, like in included diagram?

Thanks!
What you are asking about is not a "parallel" but a "Tap". I doubt the utility co. will allow a tap in there meter can but as Marc and Pete pointed out a trough under it and you are fine. You will need to do a load calculation using article 220 of the NEC, you can't just "wing it". And brush up on article 250 on how you are going to ground/bond the structures.
acrwc10 is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Service Magic Yeah I know Frankawitz Online Leads Services 34 12-04-2011 10:31 AM
Google search for a contractor, bathroom Mark Daniels Online Leads Services 7 12-25-2009 12:35 PM
Can anyone make any sense out of this? Teetorbilt Technology 24 04-16-2007 12:21 PM
? on Running 200A Service to the Garage CR295 Electrical 7 08-17-2006 09:41 PM
Price check on new service 100a 200a diyerforever Electrical 44 06-26-2006 07:03 AM

Join Now... It's Fast and FREE!

Privacy Badge
I am a professional contractor
I am a DIY Homeowner
ContractorTalk.com is for
PROFESSIONAL CONTRACTORS ONLY!

At ContractorTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?