Last night I had to take my proposal to a customer for a plaster repair, Her living room ceiling is coming down, theres a section that is 25'x 28' that has to come down and there is also 26' of Crown Cornice Moulding that has to be recast, I took my bid to her and we went over it. she tells me that my price $9,275.00 was on the high side, she tells me she had two other contractors bid the job. she says their price was way less. Now I figure this job to take around three weeks and this house was built in 1917 it's in a part of Detroit called Indian Village very large Historical Mansions, Now this is what I love about these so called plaster contractors, which are really drywall guys doing plaster they tell her that the Crown can be patched there was so much water coming through this ceiling and crown it has all delaminated and the paint is holding some of it together. I was going to remove 26' of crown and then cast new 6' pieces. she even said from what I was saying made more sence to her, then she asks me if I will be there doing the work. I told her yes, where the other two guys wanted to send their crews in. So I sat down and rewrote the bid to $6,500 so I hope this is more to her liking. But in this market everyone is bidding on anything and everything. I'm just glad I stick to what I know. That's the problem with some of these Jack of all Trades or is that Jackoffs of all Trades.

www.frankawitz.net

Frankawitz is offline  
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Old 07-18-2009, 07:23 AM   #2
Pro
 
Bob Kovacs's Avatar
 
Trade: Consultant
Join Date: May 2005
Location: Holly Springs, GA
Posts: 1,221

Re: Plaster Estimate And Other Contractors


So you dropped your price by almost 1/3 without a reduction is scope? Now she's going to think you were trying to rape her with the first price. I know the economy sucks, but that's a bad idea. If you could do the job for $6,500, you should have bid $6,500 in the first place- maybe bid it at $7,000 and be able to knock $500 off, but now you look like you were being a pig. Sorry to be so blunt, but that only reinforces the image of being con artists that contractors have.
Bob Kovacs is offline  
The Following 7 Users Say Thank You to Bob Kovacs For This Useful Post:
bwalley (07-21-2009), carpenter uk (12-27-2009), CScalf (08-04-2009), DJ9222 (07-18-2009), Eric K (09-15-2009), HusqyPro (08-04-2009), jarvis design (12-18-2009)
Old 07-18-2009, 07:27 AM   #3
Professional Instigator
 
rbsremodeling's Avatar
 
Trade: Design Build Remodeling Contractor DC MD
Join Date: Nov 2007
Location: Washington, DC/ Maryland
Posts: 6,872

Re: Plaster Estimate And Other Contractors


He had no choice he is Detroit
__________________

rbsremodeling is offline  
Old 07-18-2009, 07:51 AM   #4
strat hd
 
strathd's Avatar
 
Trade: framing contractor , remodeler , GC occasionally
Join Date: Jan 2009
Location: NW Ohio
Posts: 1,696

Re: Plaster Estimate And Other Contractors


Quote:
Originally Posted by rbsremodeling View Post
He had no choice he is Detroit
I agree. Things are tough in this part of the country. I am doing some work for a HO restoring an old victorian. Each phase of the job they get a s***load of bids. Rather than one contractor to handle it all.

I recently gave them a bid for a three car garage. Their eyes just about bulged out of their head when they saw my price. They said it was the highest bid yet. I know for a fact I was 2k lower than the bid before me.

He is a realtor/flipper she is a professor that thinks she is better than everyone. If I came down 4k on the garage (which I won't do). They would look at it like they were getting something for nothing rather than somebody was trying to rip them off.

The crew will be finishing up the roof on Monday and we all can't wait to get away from there. I have done a few phases of the job after being beat down. Cause they want our quality (int. trim ect.). Other stuff they give to hacks and lowballers. They suck out loud..............
strathd is offline  
Old 07-20-2009, 07:42 AM   #5
Pro
 
Frankawitz's Avatar
 
Trade: Plastering, Drywall, Painting, Woodworking, Stucco
Join Date: Jun 2006
Location: South Eastern Michigan outside of Detroit.
Posts: 1,592

Re: Plaster Estimate And Other Contractors


Bob,
I rewrote the scope of work, I talked with her yesterday, she told me the bids for the other two companys, now get this, what I originaly bid as the work that needs to be done these CLOWNS are going to do all this work in 3 days, I had figured it for three weeks, cause you have to let the plaster Crown cure and the Cornice also has to cure. one of the CLOWNS said he can patch the Crown and Cornice. I am going down there this morning to demo the ceiling that is hanging down off the lath. I'll post some pictures later on today if I get a chance. now here's what these guys bid Remove and replace a section of ceiling 24'x 25' and 20' of Crown Cornice Moulding patched $3,705.00 the other one 24'x 28' and 24' of the Crown his price $3,600.00 Now my material cost would be around $1875.00 also they said three days, it will take two full days to set up and demo and remove all the tear out. So I think what shes doing is trying to get me to do the job for less. cause when she said they could do the job in 3 days WTF!! Theres no way just cause of the dry time on the plaster mouldings, the only way they could pull this off is if they had the mouldings sitting on a shelf.
So I took and subtracted things like covering the whole living room floor 40'x 30' with OSB, covering all the walls with plastic drops, installing 5/8 sheetrock instead of putting up wood lath and metal lath. So I have changed a few things. But after today we shall see how this goes,

www.frankawitz.net

Last edited by Frankawitz; 07-20-2009 at 07:46 AM.
Frankawitz is offline  
Old 07-20-2009, 09:09 AM   #6
Estimator
 
DavidNTX's Avatar
 
Trade: Estimating
Join Date: May 2007
Location: Houston, TX
Posts: 180

Re: Plaster Estimate And Other Contractors


I agree with Bob, even in Detroit and especially in a 1917 home. If the historic society gets involved (which is very possible if not likely) they could easily cost you the 3k you dropped. Maybe changing the scope to drywall will help but you will still have to cast the crown molding. The floor still has to be covered. Plaster vs drywall would be some savings but I'm not sure it would be that much or if the ho is aware that it will look different.

Did those prices include painting the plaster?

Plaster isn't cured enough to paint in 3 days and 3 weeks would still be questionable.
DavidNTX is offline  
Old 07-21-2009, 07:35 AM   #7
Pro
 
Frankawitz's Avatar
 
Trade: Plastering, Drywall, Painting, Woodworking, Stucco
Join Date: Jun 2006
Location: South Eastern Michigan outside of Detroit.
Posts: 1,592

Re: Plaster Estimate And Other Contractors


Ok well heres how it's going to work out, I started it yesterday I took out all the water damaged plaster. With the HomeOwner she said they save up money for repairs that need to be done, so I charged her for just taking out the ceiling, then we talked and after I told her that I can take out the wood lath and furing strips, then install new furing and then 5/8s board then two coats plaster, so this I'm going to charge her $1,800 this way the ceiling is done. Then they are going on vacation for a week, then when they come back I will work on crown and run that in place, then I will cast the cornice then once it drys I will install the cornice to the crown, after the repairs get one coat of primer. then if she wants me to paint I will. I have some pictures check them out.


www.frankawitz.net
Attached Images
   

Last edited by Frankawitz; 07-21-2009 at 07:38 AM.
Frankawitz is offline  
Old 07-21-2009, 08:02 PM   #8
paper hanger,painter
 
chris n's Avatar
 
Trade: wallpaper hanger,painter
Join Date: Oct 2003
Location: Hagerstown MD
Posts: 904
Send a message via Yahoo to chris n

Re: Plaster Estimate And Other Contractors


[QUOTE=DavidNTX;726255]I agree with Bob, even in Detroit and especially in a 1917 home. If the historic society gets involved (which is very possible if not likely) they could easily cost you the 3k you dropped. Maybe changing the scope to drywall will help but you will still have to cast the crown molding.

Around here if the historical society was involved you would never get away with putting up drywall.
chris n is offline  
Old 07-21-2009, 09:04 PM   #9
Pro
 
Frankawitz's Avatar
 
Trade: Plastering, Drywall, Painting, Woodworking, Stucco
Join Date: Jun 2006
Location: South Eastern Michigan outside of Detroit.
Posts: 1,592

Re: Plaster Estimate And Other Contractors


Well the Homeowner has no problem with sheetrock then plaster over it. The Homeowner has already had other rooms repaired by other guys this way. But anyways I have the job so I will post pictures as the job moves on.

www.frankawitz.net
Frankawitz is offline  
Old 07-21-2009, 09:08 PM   #10
Professional Instigator
 
rbsremodeling's Avatar
 
Trade: Design Build Remodeling Contractor DC MD
Join Date: Nov 2007
Location: Washington, DC/ Maryland
Posts: 6,872

Re: Plaster Estimate And Other Contractors


You guys realize he is in Detroit right?

They sold the Historical board about 5 or 6 years ago?
__________________

rbsremodeling is offline  
Old 07-24-2009, 09:47 PM   #11
Pro
 
Frankawitz's Avatar
 
Trade: Plastering, Drywall, Painting, Woodworking, Stucco
Join Date: Jun 2006
Location: South Eastern Michigan outside of Detroit.
Posts: 1,592

Re: Plaster Estimate And Other Contractors


Well I took out 2/3s of the ceiling down, wood lath and furing strips, lost a lot of the top edge of the crown moulding, I also cut out the water damage crown and cornice moulding. As for the Historical Soceity there are houses on this street that are sitting empty with the grass 3' deep. Yeah Detroit aint worried about History, when Kwame was Mayor he had ordered over 176 Historical buildings and houses be leveled. the Book Hotel sits at the end of the block, nothing being done, just boarded up, to try and keep the scrapers out of the buildings


www.frankawitz.net
Attached Images
   

Last edited by Frankawitz; 07-24-2009 at 09:49 PM.
Frankawitz is offline  
Old 08-01-2009, 06:46 AM   #12
Pro
 
Frankawitz's Avatar
 
Trade: Plastering, Drywall, Painting, Woodworking, Stucco
Join Date: Jun 2006
Location: South Eastern Michigan outside of Detroit.
Posts: 1,592

Re: Plaster Estimate And Other Contractors


Well Monday I get to go back in and start putting this ceiling back together, I went last Saturday and did the last of the clean up.
In these pictures you can see how the furing was pulling out of the ceiling joist, so I removed all the plaster and rock lath off the wood lath, then took the wood lath off the furing then took the furing down. Now I will refur the ceiling so I can hang my 5/8s.
Attached Images
   
Frankawitz is offline  
Old 08-01-2009, 07:03 AM   #13
Pro
 
Frankawitz's Avatar
 
Trade: Plastering, Drywall, Painting, Woodworking, Stucco
Join Date: Jun 2006
Location: South Eastern Michigan outside of Detroit.
Posts: 1,592

Re: Plaster Estimate And Other Contractors


Heres a better picture of the Crown Cornice Moulding, these guys said they could fix this without removing any of it Now I know there are a couple other guys on here that work with this type of Plaster everyday, Do any of you guys think this could have been patched or should it be removed and all new put back?
Attached Images
   

Last edited by Frankawitz; 08-01-2009 at 07:07 AM.
Frankawitz is offline  
Old 08-01-2009, 07:23 AM   #14
Pro
 
Frankawitz's Avatar
 
Trade: Plastering, Drywall, Painting, Woodworking, Stucco
Join Date: Jun 2006
Location: South Eastern Michigan outside of Detroit.
Posts: 1,592

Re: Plaster Estimate And Other Contractors


Here's what the ceiling looked like close up, water damage was going on for years, Plumbers replaced values and wax ring with flange, this helped some but the tub shower was the problem. if they would have opened up the ceiling back(1950' or 60's) when they took the plaster off the wood lath and put up rock lath. they wouldn't have had all this damage. This kinda reminds me of when you hear some tell people "Oh just cover it up with drywall"
But I would say that the bathroom above this Living room doesn't get fixed correctly they will do this at some time again.
Attached Thumbnails
Plaster Estimate and other contractors-1791-burns-indian-village-detroit-mi-006.jpg   Plaster Estimate and other contractors-1791-burns-indian-village-detroit-mi-007.jpg  
Frankawitz is offline  
Old 08-01-2009, 08:51 AM   #15
Pro
 
mikeswoods's Avatar
 
Trade: interior remodeling
Join Date: Oct 2008
Location: Kane Co. Illinois
Posts: 1,568

Re: Plaster Estimate And Other Contractors


Please keep the pictures coming.

Why didn't the gut and replace the plumbing above the ceiling while the plaster was down? Did I miss something?
mikeswoods is offline  
Old 08-04-2009, 10:14 PM   #16
Member
 
rogerhattman's Avatar
 
Trade: plaster/stucco
Join Date: Jul 2008
Location: near Spring City, Penna
Posts: 53

Re: Plaster Estimate And Other Contractors


Frank,
I really like the abundance of pics.

Were the others seriously considering patching the area you mentioned? From the looks of it, I wouldn't even consider anything but removing that area clean.
I know you used gypsum lath to save the customer money, but it is a shame since it is inferior; wood lath remains the best with metal lath a strong second, IMO.


Roger
rogerhattman is offline  
Old 08-05-2009, 06:02 AM   #17
Pro
 
Frankawitz's Avatar
 
Trade: Plastering, Drywall, Painting, Woodworking, Stucco
Join Date: Jun 2006
Location: South Eastern Michigan outside of Detroit.
Posts: 1,592

Re: Plaster Estimate And Other Contractors


Roger,
The way this job is going it was all about the costs, I bid the job at first to replace all the wood lath with metal ribbed lath, but I was 3 times higher then the other two contractors, so I ended up going with 5/8s board then I'll basecoat and skim coat, but my costs are still going to be up there cause of all the damage to the Crowns top steps. when I pulled the ceiling down the last time this ceiling was repaired they pulled all the plaster off the lath and then installed rock lath over the wood then two coated it, As for the water leak they thought that it was fixed well I told them that we still had water dripping, she told me they had taken showers before I got there, well I took out the sub floor that hold the mortar back from the ceiling, then I took out the old mortar and there it was a section of pipe rusted and dripping, so now I have to wait and see how much of the plumbing is going to be removed, this same pipe is leaking in the next rooms ceiling, the pipes are all galvinized rusted pipes, been there since 1917 I have some more pictures of how much I got done.
Attached Thumbnails
Plaster Estimate and other contractors-1791-burns-indian-village-detroit-mi-112.jpg   Plaster Estimate and other contractors-1791-burns-indian-village-detroit-mi-118.jpg   Plaster Estimate and other contractors-1791-burns-indian-village-detroit-mi-121.jpg  
Frankawitz is offline  
Old 08-08-2009, 11:08 AM   #18
Commercial Roofing
 
tekwrytr's Avatar
 
Trade: Commercial Roof Repair and Re-Roofing
Join Date: Sep 2007
Location: Twin Cities, MN
Posts: 99

Re: Plaster Estimate And Other Contractors


Quote:
Originally Posted by Bob Kovacs View Post
So you dropped your price by almost 1/3 without a reduction is scope? Now she's going to think you were trying to rape her with the first price. I know the economy sucks, but that's a bad idea. If you could do the job for $6,500, you should have bid $6,500 in the first place- maybe bid it at $7,000 and be able to knock $500 off, but now you look like you were being a pig. Sorry to be so blunt, but that only reinforces the image of being con artists that contractors have.
That is one of the most intelligent postings I have ever seen. It is also the reason the $3.50 a sheet drywall hanging exists, because it reinforces the idea that most contractors are ripoffs, and price cheap work at premium prices.

The bottom line is just as Bob Kovacs said above: If you could do the job for $6,500, you should have bid $6,500 in the first place. If you didn't, the bottom line is that you are pricing according to what you think you can get, rather than what the job takes to do. Bad, bad business in the long term. Any time you cut your price, you look like a cheat, whether you are reacting to lowballers or just sharpening your pencil.
Thanks
__________________
Commercial EPDM Rubber Roof Repair - Maintenance - Re-Roofing Exclusively. Serving the Twin Cities, MN Metro area since 2001.
http://www.tekwrytrs.com/roofing/
tekwrytr is offline  
Old 08-08-2009, 11:13 AM   #19
Pro
 
mikeswoods's Avatar
 
Trade: interior remodeling
Join Date: Oct 2008
Location: Kane Co. Illinois
Posts: 1,568

Re: Plaster Estimate And Other Contractors


Thanks for the updates. It's fun to watch this kind of work.
So very far from my own skills.
MIKE
mikeswoods is offline  
Old 08-08-2009, 12:35 PM   #20
Pro
 
Chris G's Avatar
 
Trade: Porch and Deck Builder
Join Date: May 2006
Location: Toronto
Posts: 1,773

Re: Plaster Estimate And Other Contractors


Quote:
Originally Posted by tekwrytr View Post
That is one of the most intelligent postings I have ever seen. It is also the reason the $3.50 a sheet drywall hanging exists, because it reinforces the idea that most contractors are ripoffs, and price cheap work at premium prices.

The bottom line is just as Bob Kovacs said above: If you could do the job for $6,500, you should have bid $6,500 in the first place. If you didn't, the bottom line is that you are pricing according to what you think you can get, rather than what the job takes to do. Bad, bad business in the long term. Any time you cut your price, you look like a cheat, whether you are reacting to lowballers or just sharpening your pencil.
Thanks
Dude, he changed the scope of his work. You need to listen to the conversation before voicing an opinion.
__________________
"Neek...Neek...yoo-a-moronna Neek. Getta-da-fookin-a-jacka-ham!"

http://www.vicporch.ca
Deck Fence Porch Builder Toronto
Chris G is offline  
The Following 2 Users Say Thank You to Chris G For This Useful Post:
HusqyPro (08-08-2009), J F (08-19-2009)


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Join Now... It's Fast and FREE!

Privacy Badge
I am a professional contractor
I am a DIY Homeowner
ContractorTalk.com is for
PROFESSIONAL CONTRACTORS ONLY!

At ContractorTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?