Fast Drying Joint Compound

 
Thread Tools Search this Thread Display Modes
Old 10-18-2007, 11:22 AM   #1
Member
 
nick114920's Avatar
 
Trade: General Contracting
Join Date: Sep 2007
Posts: 59

Fast Drying Joint Compound


Hey everyone...i baught a bucket of sheetrock brand joint compound (blue label) and now that fall is comming it takes about 3-4 days to dry. I was wondering if i buy the fast drying bag you mix with water and put it in the bucket... if i use say a quarter bucket and close the bucket up so its air tight will the compound still dry or stay wet?? and will it be just as good the second and 3rd time i use it as when i first mixed it????

nick114920 is offline  
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Old 10-18-2007, 12:05 PM   #2
Framerbitch's Nemesis
 
True North's Avatar
 
Trade: NA
Join Date: Oct 2007
Location: North Pole
Posts: 105

Re: Fast Drying Joint Compound


Setting compound will harden regardless of how it's stored after being mixed. A chemical reaction causes it to harden. A glob of it will even harden underwater!

I believe there are several ready-mixed compounds advertised as fast drying. I've never used them.

What will really help ready-mix to dry is to keep the temperature above 60F, and get a fan or two in to keep the air moving. The fans really work well.

You could also just mix small batches of setting mud as needed. That's what I do.
True North is offline  
Old 10-18-2007, 12:23 PM   #3
Mod / ArchiBuilder
 
Cole's Avatar
 
Trade: Design/Build Outdoor Living
Join Date: Aug 2004
Location: ArkLaTexOma
Posts: 6,611

Re: Fast Drying Joint Compound


I agree, it will harden.

Just mix what you need and go from there.
Cole is online now  
Old 10-18-2007, 12:43 PM   #4
Chief Toilet Mover
 
Mike Finley's Avatar
 
Trade: Bathroom Remodeling
Join Date: Apr 2004
Location: Littleton, Colorado
Posts: 14,078

Re: Fast Drying Joint Compound


AWWWW, you guys are no fun. I wanted to tell him to go ahead and mix it up and keep it in the bucket til next time.
Mike Finley is offline  
Old 10-18-2007, 01:32 PM   #5
Curmudgeon
 
neolitic's Avatar
 
Trade: carpentry/remodeling/"Yes M'am we do"
Join Date: Apr 2006
Location: Beech Grove, Indiana, Birthplace of the "King of Cool"
Posts: 11,707

Re: Fast Drying Joint Compound


Quote:
Originally Posted by Mike Finley View Post
AWWWW, you guys are no fun. I wanted to tell him to go ahead and mix it up and keep it in the bucket til next time.
Really good for holding down tarps and drops on windy days
neolitic is offline  
Old 10-18-2007, 02:11 PM   #6
Back from the dead...
 
ProWallGuy's Avatar
 
Trade: Paperhanger/Painter
Join Date: Oct 2003
Location: St. Louis, MO
Posts: 6,544

Re: Fast Drying Joint Compound


Quote:
Originally Posted by Mike Finley View Post
AWWWW, you guys are no fun. I wanted to tell him to go ahead and mix it up and keep it in the bucket til next time.
Then he could start a side business of selling boat anchors.
ProWallGuy is offline  
Old 10-18-2007, 03:27 PM   #7
Three Rivers Services LLC
 
aWorkaHolic's Avatar
 
Trade: General Contractor
Join Date: Sep 2007
Location: Federal Way, Washington
Posts: 168

Re: Fast Drying Joint Compound


Quote:
Originally Posted by ProWallGuy View Post
Then he could start a side business of selling boat anchors.
Beat me to the punch! I also was gonna say that Hot mud makes great disposable anchors.
aWorkaHolic is offline  
Old 10-19-2007, 01:27 AM   #8
Member
 
nick114920's Avatar
 
Trade: General Contracting
Join Date: Sep 2007
Posts: 59

Re: Fast Drying Joint Compound


I love how on these threads one guy makes a joke and everyone just fallows... I believe these threads are to help guys like me (who never went to trade school or college) keep maken it happen while the "experts" (guys who went to school and have the proper licenses who have nothing to do all day but tell jokes on here) are scrimpin an scrappin!!!!
nick114920 is offline  
Old 10-19-2007, 02:02 AM   #9
David Davis
 
shed-n-deck's Avatar
 
Trade: ? No thanks, I like mine better!
Join Date: Sep 2007
Location: Denver, Colorado
Posts: 245

Re: Fast Drying Joint Compound


Use a heater. If you buy the fast setting compounds, sanding will be tougher. If your no good at mudding, then you'll be spending countless hours sanding.

I used to crank the furnace up to 90 when I had mud setting. If you don't have a furnace, you can rent large propane heaters to keep the heat high and the humidity low.
__________________
Shed
shed-n-deck is offline  
Old 10-19-2007, 02:22 AM   #10
Chief Toilet Mover
 
Mike Finley's Avatar
 
Trade: Bathroom Remodeling
Join Date: Apr 2004
Location: Littleton, Colorado
Posts: 14,078

Re: Fast Drying Joint Compound


Here's a tip since you didn't get to go to contractor college like everybody else did, there are a lot of ways to get information then be spoon fed it.

  • Read a book about drywall.
  • Read the back of a package of setting compound.
  • Ask a real person, in person.
  • Go to a manufacturers website and read the instructions and directions about setting compounds.
  • Do a search on the Internet for "Can I store setting compound overnight?"
Use the search function on this site "setting compounds"

OR - lighten up and ask your question here and have some fun.
Mike Finley is offline  
Old 10-19-2007, 07:31 AM   #11
Framerbitch's Nemesis
 
True North's Avatar
 
Trade: NA
Join Date: Oct 2007
Location: North Pole
Posts: 105

Re: Fast Drying Joint Compound


Quote:
Originally Posted by Mike Finley View Post
Here's a tip since you didn't get to go to contractor college like everybody else did, there are a lot of ways to get information then be spoon fed it.

  • Read a book about drywall.
  • Read the back of a package of setting compound.
  • Ask a real person, in person.
  • Go to a manufacturers website and read the instructions and directions about setting compounds.
  • Do a search on the Internet for "Can I store setting compound overnight?"
Use the search function on this site "setting compounds"

OR - lighten up and ask your question here and have some fun.
Ohhh, PWND!!


LOL
True North is offline  
Old 10-19-2007, 08:33 AM   #12
turning houses into homes
 
daArch's Avatar
 
Trade: Wallcovering Installation
Join Date: Jun 2007
Location: Norfolk, MA
Posts: 1,261

Re: Fast Drying Joint Compound


Personally I LIKE the humor inter-woven with the helpful hints.

Contractor College ??? Is that a satellite campus of the School of Hard Knocks ?

OK now it's time to interweave a helpful hint:

Although we've all been tempted and some (myself included) have actually done it, DO NOT MIX HOT MUD WITH PRE-MIXED JC.

Rumor has it that it creates a very alkaline surface that can reject even latex

Now I am a bit confused by the original post. Nick says he bought Blue Label (light-weight all purpose ready-mix) but it's taking 3-4 days to dry. Does that just not sound right to anyone else?

Nick, are you applying this exceptionally thick? How cold is the room(s) in which you are applying? Is there high moisture? Are you adding water? Are you peeing in the bucket (seriously, ammonia retards drying).

I've applied regular (green label) All-purpose ready-mix JC way too thick (so it cracks), and never seen a dry time of 3-4 days.
daArch is offline  
Old 10-19-2007, 09:31 AM   #13
Member
 
nick114920's Avatar
 
Trade: General Contracting
Join Date: Sep 2007
Posts: 59

Re: Fast Drying Joint Compound


room is about 50 degrees.... and there is moisture in air... it takes 3-4 days to completely harden... its the lightweight sheetrock brand
nick114920 is offline  
Old 10-19-2007, 09:48 AM   #14
Curmudgeon
 
neolitic's Avatar
 
Trade: carpentry/remodeling/"Yes M'am we do"
Join Date: Apr 2006
Location: Beech Grove, Indiana, Birthplace of the "King of Cool"
Posts: 11,707

Re: Fast Drying Joint Compound


Quote:
Originally Posted by nick114920 View Post
room is about 50 degrees.... and there is moisture in air... it takes 3-4 days to completely harden... its the lightweight sheetrock brand
Some heat would help no doubt, but also moving air. You don't need to create a tornado, just movement. Even a $15, 20" box fan st on low speed. You've probably noticed that the ceiling angle is always the last to dry. That's because there is a natural "dead spot" @ 12-18" around the intersection of wall and ceiling--it's why you don't put a smoke detector in that area.
Good luck, it was a long time before I got the guts to try durabond 45, but that's what it takes, that's what you do!
neolitic is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
5 level of drywall finish jmthouston Drywall 15 10-09-2008 08:30 PM
Fast set taper71 Drywall 4 08-19-2007 11:44 PM
Solution for VCT cracking @ control joint puzzledlog Flooring 2 05-16-2007 08:48 PM
Dry mix joint compound AbeBarker Drywall 13 05-06-2007 06:00 PM
Blue v. green joint compound G.P. Drywall 27 12-05-2005 08:01 PM

Join Now... It's Fast and FREE!

Privacy Badge
I am a professional contractor
I am a DIY Homeowner
ContractorTalk.com is for
PROFESSIONAL CONTRACTORS ONLY!

At ContractorTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?