Drywallers' Pet Peeve?

What does a general contractor need to take care of -- pay aside -- to make you happy and make the job go as smoothly as possible? OR what is your biggest pet peeve in doing a drywall job?

rolson6432 is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 03-28-2005, 12:44 AM   #2
Custom Builder
 
Glasshousebltr's Avatar
Trade: From dirt to ridge vent
 
Join Date: Feb 2004
Location: South Central Illinois
Posts: 4,405
Send a message via AIM to Glasshousebltr Send a message via Yahoo to Glasshousebltr
To follow a cross eyed framer.

Bob
__________________
Bob
Glasshousebltr is offline   Reply With Quote
Old 03-28-2005, 12:45 AM   #3
Pro
 
old27's Avatar
Trade: Work
 
Join Date: Feb 2005
Posts: 262
great question..can't wait to see the responses.
old27 is offline   Reply With Quote
Old 03-28-2005, 12:53 AM   #4
Custom Builder
 
Glasshousebltr's Avatar
Trade: From dirt to ridge vent
 
Join Date: Feb 2004
Location: South Central Illinois
Posts: 4,405
Send a message via AIM to Glasshousebltr Send a message via Yahoo to Glasshousebltr
Go ahead......say it.......don't you mean the real responses?

Bob
__________________
Bob
Glasshousebltr is offline   Reply With Quote
Old 03-28-2005, 02:47 AM   #5
Pro
Trade: Home Improvement
 
Join Date: Jan 2005
Location: Moberly, Mo.
Posts: 269
I'm with Bob, nothing worse than hanging board behind a cross-eyed framer, I mean you'd think they could at least read a tape & a level. And would it be too much trouble to turn up the pressure on your nailer a bit so the nail heads are actually drove flush. Neglecting to install nailers where needed in corners, closet lids are particularly notorious for this. There's always at least one or two that are left out.

Next would be this lie in mid-Jan, (temp hovering around -15) yeah house is ready to hang and the heat's been on for 2 or 3 days. You arrive to find the front door standing open, oh yeah it snowed last night & there's a drift in the doorway. Go inside and see they stocked it before the insulators were finished so all the board is laying flat on the floor, big sheets for the lids naturally on the bottom of the pile. Oh yeah there's your mud, neatly stacked and frozen solid in place.

Let's see what else, You arrive to find the insulation inspection hasn't been done, so you call GC. He says don't worry he's on the way there now. Inspector shows up, looks around, scribbles out a punch list that reads like a Clancy novel.

Electricians that swear your hangers covered up an outlet box. Got a solution for that one though, I take digital pics of every wall & ceiling before the hanging starts. I just love the dumb looks and shuffling thru plans that start when I show them a pic of the framed wall & there's no box where they're sayin one should be. I'm always nice about it and offer to do the cut-out for them, yeah sure I am. :rolleyes While we're on the subject of electricians, make sure the boxes are mounted properly and securely, same goes for the HVAC & the vents & returns.

GC, it won't be any problem to sheetrock in behind the furnace and hot water heater in the utility room will it? You'd think they'd have thought to hang it before they set the furnace!

GC- Make sure your guys don't damage the kitchen cabinets when they're hangin & finishing the garage. They arrived early so we just stacked them in the garage, most of the time in front of your rock standing against the wall. We live for moving & storage, nothing makes our day like having to stop work & move cabinets, extra siding, interior doors out of the way, especially since it's bid at piece rate.

No hot outlets in the place, you'll have to run 150' of cord thru the mud out to the temp service at the curb.

Those are a few of the reasons I don't bid new construction drywall anymore. Give me a picky home owner any day over a disorganized GC, miss out on all that fun and get paid better. :Thumbs:
__________________
"All you need in this life is ignorance and confidence, and then success is sure". -Mark Twain

Last edited by housedocs; 03-28-2005 at 03:11 AM.
housedocs is offline   Reply With Quote
Old 03-29-2005, 07:40 AM   #6
Pro
Trade: Home Improvement
 
Join Date: Jan 2005
Location: Moberly, Mo.
Posts: 269
Was I too real for them you think Bob?
__________________
"All you need in this life is ignorance and confidence, and then success is sure". -Mark Twain
housedocs is offline   Reply With Quote
Old 03-29-2005, 02:38 PM   #7
Justanotherdumbdrywaller
 
boardslinger's Avatar
Trade: Wallsystems
 
Join Date: Mar 2004
Location: Arizona
Posts: 99
My biggest pet peeve on doing a drywall job, is not following crossed eyed framers, or even flat out stupid ones, but the fact that every trade in that place seems to thing that, that stack of drywall was set there specifically for tehm to load their sh*t on, even though they see me and the fellas hanging it. I don't even ask anymore, I just slide my arm across teh rock and send everything crumbling and tumbling down. No I never did get that whole playing well with others thing.
__________________
Bang it, Slam it, Screw it, Aaaaaaah Sheetrock.
boardslinger is offline   Reply With Quote
Old 03-30-2005, 07:57 AM   #8
Member
Trade:
 
Join Date: Dec 2004
Posts: 60
Gotta be the framing. Goofy little oddball corners and angles that are the result of a screw up. Eight foot deep skylights swarming with mad bees. Tray ceilings where none of the points come together. Roller coaster peaks and off angles.....forget straightflex...lets try straight framing. And it always falls on the shoulders of the guy that touched it last. Poorly set tubs and showers...i bet you tile guys love those. Showing up that first morning to find all the things that arent quite ready for you yet and everyones junk is in your way. The boards all in one monster pile because yesterday it had to be deliverd but the exteriors where being blown in and last minute plumbing and framing was being done. Stairtreads too wide to slide the board past. No water...no power...i can't hear my radio over the generator. When you gonna be done...are you almost done...i'm trying to schedule the flooring 2 months ahead...when you gonna be done, are you done yet?? Haha..but you know, i still love it!!

Last edited by Sheetrock26; 03-30-2005 at 08:00 AM.
Sheetrock26 is offline   Reply With Quote
Old 03-30-2005, 07:56 PM   #9
Registered User
Trade: drywall
 
Join Date: Mar 2005
Posts: 11
this week it is cutting out expanding foam. A clean jobsite is always a +

Last edited by imahanger; 03-30-2005 at 08:10 PM.
imahanger is offline   Reply With Quote
Old 04-07-2005, 06:23 AM   #10
New Guy
Trade: Tile installer and remodeler
 
Join Date: Apr 2005
Posts: 21
Well for us Tile Guys our biggest pet peve from the drywallers is a few. One they leave a mess in the tubs joint compond all over the place. Dude they made the mess cant they clean it. The other is when they do corner beads they use metal in a shower. ( last time I checked metal and water dont mix) Or they float a jamb that out that is supposed to be plumb. Looks more like a dirt road that needs the tile to stick out a 1/4 to 1/2 inch to fix it.
opiethetileman is offline   Reply With Quote
Old 04-07-2005, 04:31 PM   #11
Registered User
Trade: drywall
 
Join Date: Mar 2005
Posts: 11
shower stalls are a pain to hang. most of the shower stalls in my area stick out 1/4" to 1/2" from the framing. in order to get a straight wall you have to hold the rock back from the flange and fill the space with mud. i only know of one builder that shims the wall out to match.
imahanger is offline   Reply With Quote
Old 04-07-2005, 11:03 PM   #12
Pro
 
Teetorbilt's Avatar
Trade: Residential Contractor
 
Join Date: Feb 2004
Location: Jensen Beach, FL
Posts: 10,376
My biggest gripes are windows. Do any sheetrock guys own squares? Window openings always taper from the inside wall and get smaller as they approach the window. Whazzzup?
I also agree on the mess and lack of cleanup. I'm always scraping their droppings off of the floor.
__________________
You can't solve you're problems with the same level of thinking that created the problems.

Albert Einstein
Teetorbilt is offline   Reply With Quote
Old 04-07-2005, 11:11 PM   #13
DGR,IABD
 
mdshunk's Avatar
Trade: Electrical; Commercial and Residential Service
 
Join Date: Mar 2005
Location: Central PA
Posts: 9,665
Quote:
Originally Posted by Teetorbilt
I'm always scraping their droppings off of the floor.
Does the typical contract lingo "work area left in a broom clean condition" necessarily involve scraping? Not arguing... just wondering if perhaps the lingo should be changed so that the plop offenders are required to scrape their own plops. I saw a floor tile job on Wednesday where the tile man had grout slopped on partway up the walls and some spots on the ceiling. He must have been using a neuclear powered grout float.
mdshunk is offline   Reply With Quote
Old 04-07-2005, 11:53 PM   #14
Ex Nail Pounder
Trade: General Contracting
 
Join Date: Apr 2005
Location: Hawaii
Posts: 63
I notice the hangers we have now are some of the most professional, productive, clean hangers I've worked with in years.

They're in the union though. Cost us about 55-60 bucks an hour.

Still, they're twice as good as the last bunch...........
Rusty Nails is offline   Reply With Quote
Old 04-08-2005, 02:18 AM   #15
WDA
Member
Trade: GC & Remodeling
 
Join Date: Apr 2005
Posts: 30
Shoot the carpenters, LOL The only decent ones are the ones that have had to hang rock by the sheet to survive-ie they know whats going over and on the framing.

WDA
WDA is offline   Reply With Quote
Old 04-08-2005, 06:24 AM   #16
Pro
Trade: Home Improvement
 
Join Date: Jan 2005
Location: Moberly, Mo.
Posts: 269
We include the scrape and sweep in our drywall bids, but that's someting that makes my price just a tad higher than my competitors, but I have seen some real sloppy jobs my self. We always lay out some large scrap to set up the mud mixing station, Then throw an old drop cloth over it. If we're shooting texture, I have some old blue tarps I spread out over the bulk of the floors when I'm shooting. Anybody that says they can finish board w/o getting any on the floor is feeding you a self promoting line. Some guys, the more experienced, will tend to be neater, but you're gonna get some blobs on the floor. I usually bid jobs all the way thru the finish, so to me it makes sense to cover instead of scrape.

When I'm finishing over wood subfloors especially OSB, I like roll out some 15# felt and staple it down with a hammer tacker, plywood or slabs & the scraper will knock all the lumps right off. The osb is just too pourous and makes scraping a real PIA, if I'm specifing materials for a subfloor it's gonna be plywood for sure. :Thumbs:

This thing has turned a full circle now.
__________________
"All you need in this life is ignorance and confidence, and then success is sure". -Mark Twain
housedocs is offline   Reply With Quote
Old 04-08-2005, 04:22 PM   #17
Licensed Electrician
Trade: Electrical Contractor
 
Join Date: Jul 2004
Posts: 56
if i must point out some of my peves aginst the drywallers in my field is are half of them blind or dont take the time to look. got to the point of having to spraypaint the floors and keep notes galore so when the electrical boxes are covered up i got a general idea of where they are . even taking pictures of the site before was pretty expensive but now with digital is not a problem

secondly learn to use the roto tool those thing eat wires for lunch

then if you are luck enough to have them cut out all the boxes ,in comes the finishers ,i understand you have to mud over the boxes but guess who gets to clean them out. usually after the flooring is in on the trim out makes a big mess and the gc has a cow.

just seems to me i know its based on a peicework and speed thing just like the rest of us but cant you guys think for a minute and clean up your own loose end so the rest of us can get back in and finish our job
boogie is offline   Reply With Quote
Old 04-08-2005, 05:06 PM   #18
Deck Designer/Builder
 
DecksEtc's Avatar
Trade: Deck Design & Construction
 
Join Date: Oct 2004
Location: Whitby, Ontario
Posts: 2,138
I'm just curious and forgive me if I'm making a grave error here, but do none of the new home construction sites that many of you work on have general labourers to go around and clean up in between trades? Or have GC's just cut out the practice to be cheap?

The reason I ask is that I worked a couple of summers during high school as a general labourer for a GC directly. One of our primary jobs was to go around to each house (30-40 house projects at a time) after each and every trade and clean it before the next trade started. We would clean up all waste inside and out after the framers, clean up all waste shingles, clean up after the plumbers/electricians, clean up all drywaller's drops & pick up their waste material, sand all the seams on sub-floors - the list goes on and on. We would clean every house at least 9-10 times before the carpet was laid.

Just curious...
__________________
It's a dog eat dog world and I'm wearing Milk Bone underwear - Norm Peterson

www.decksetc.ca
DecksEtc is offline   Reply With Quote
Old 04-08-2005, 05:46 PM   #19
Ex Nail Pounder
Trade: General Contracting
 
Join Date: Apr 2005
Location: Hawaii
Posts: 63
Quote:
Originally Posted by DecksEtc
I'm just curious and forgive me if I'm making a grave error here, but do none of the new home construction sites that many of you work on have general labourers to go around and clean up in between trades? Or have GC's just cut out the practice to be cheap?

The reason I ask is that I worked a couple of summers during high school as a general labourer for a GC directly. One of our primary jobs was to go around to each house (30-40 house projects at a time) after each and every trade and clean it before the next trade started. We would clean up all waste inside and out after the framers, clean up all waste shingles, clean up after the plumbers/electricians, clean up all drywaller's drops & pick up their waste material, sand all the seams on sub-floors - the list goes on and on. We would clean every house at least 9-10 times before the carpet was laid.

Just curious...

That day is LONG gone.

You have to mop up after youself now.
Rusty Nails is offline   Reply With Quote
Old 04-10-2005, 05:38 PM   #20
Registered User
Trade: drywall
 
Join Date: Mar 2005
Posts: 11
i think it is a great idea to mark boxes with paint. as with any trade there are some bums out there.

roto tools and wires? if the wires are well inside the box no problem.

mud in boxes? cover your boxes 4' off the floor with tape and get back early imo
imahanger is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Excuses Drywallers Make...... 1KingOfDrywall Drywall 18 07-13-2007 07:35 PM
Is there a need for Drywallers & Plasterers in the US Mikegdwn000 Drywall 6 07-12-2007 06:32 PM
Electricians vs Drywallers! Magnettica Electrical 42 04-22-2007 01:30 AM
Wanted: Drywallers in the Dallas area!!! Cole Drywall 23 06-28-2006 11:02 AM




Top of Page | View New Posts


All times are GMT -5. The time now is 09:41 AM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC