Quote:
Originally Posted by CJKarl
Except, I set my perimeter on end in 4" of hand mixed concrete. The big CT state plow trucks just bounce off of them. 
|
We do the same only in about 12" of crete
I had to remove a 20-liner foot portion of it once. Took me about 6 hours in a tracked cat.
As far as using the poly in the joints, I see no problem with it except for the cost. There is a product that resembles bluestone dust and accommodates joints larger than the typical paver allowances. We use it for dry laid bluestone.