Thread Tools | Search this Thread | Display Modes |
|
|
#1 |
|
Registered User
Trade: GENERAL CONTRACTOR
Join Date: Jul 2009
Posts: 4
|
Site Preparation For Future Concrete Slab On Clay Soil
I am bidding on site work for a future (next year) garage.
Floating concrete slab. location is northern minnesota, deep freeze land. The location is on the side of a hill, the back side of the garage will be five feet into the orginal elevation of the hill. I am planning to bid the following work. 40 x 56 garage slab area excavate area is to be 60 x 66 excavate into slope of hill zero cut infront and three feet in back. the excess hill behind garage will be excavated to divert water around garage. install french drain behind garage to channel water into drain tile that will also be installed on the side excavated walls of the excavated area to flow out the front of the garage area. natural soil is all clay. cut into clay soil resulting in a level bottom, with back cut three feet into hill, after removing 2 feet above that (3 feet) for drainage away from building. excess clay soil behind garage above three feet deep cut will be removed for drainage. will use pit run gravel compacted to make a three foot thick base for slab. this is deep freeze land. Any suggestions or comments on my plan, will take a lot of time involved here to build a base on this unique site. |
|
|
|
|
|
#2 |
|
Pro
Trade: custom home building
Join Date: Dec 2007
Location: Central Iowa
Posts: 1,795
|
Re: Site Preparation For Future Concrete Slab On Clay Soil
No mention of footings?
|
|
|
|
|
|
#3 |
|
Pro
Trade: LI,NY designer, new homes, renovation work, concre
Join Date: Mar 2008
Location: Long Island, NY
Posts: 5,426
|
Re: Site Preparation For Future Concrete Slab On Clay Soil
HE dont need no stinkin footings
![]()
__________________
|
|
|
|
|
|
#4 |
|
Pro
Trade: GC/Remodeling
Join Date: Sep 2007
Location: Central America (Kansas)
Posts: 1,926
|
Re: Site Preparation For Future Concrete Slab On Clay Soil
__________________
-Steve "The most beautiful thing we can experience is the mysterious. It is the source of all true art and science." ~ Albert Einstein |
|
|
|
|
|
#5 |
|
Pro
Trade: contractor
Join Date: Oct 2008
Location: Alaska
Posts: 1,062
|
Re: Site Preparation For Future Concrete Slab On Clay Soil
Sounds reasonable RFTTTE
|
|
|
|
|
|
#6 |
|
Pro
Trade: custom home building
Join Date: Dec 2007
Location: Central Iowa
Posts: 1,795
|
Re: Site Preparation For Future Concrete Slab On Clay Soil
Joking aside, he probably could excavate down to the frost line and fill with crushed stone and pour a slab on top of this. The question is, is it more economical to excavate out the whole building or just the perimeter? Obviously the latter is more economical and that is why it is done that way.
|
|
|
|
|
|
#7 |
|
Pro
Trade: Masonry
Join Date: Nov 2007
Location: Nantucket MA
Posts: 348
|
Re: Site Preparation For Future Concrete Slab On Clay Soil
Are you doing site work or whole job? Sounds like an excavation question. Assuming these are plans approved by building department.....I am not familiar with N MN but I am guessing frost line is about 8 feet or so. But it would be crazy to go down 8'+ just for a slab, you would just do a basement at that point. It may be that floating slabs are acceptable there, esp. with detached garages. I have to assume so since you are looking at the plans. I would say that site conditions and local building codes are going to be more helpful in dictating which way you go, but that clay......ouch. Good luck
|
|
|
|
|
|
#8 |
|
Contractor
Trade: Excavation, Foundation, Concrete
Join Date: Feb 2006
Location: Maryland
Posts: 3,278
|
Re: Site Preparation For Future Concrete Slab On Clay Soil
Yep, he posted in the excavation area, but did not stop back in to answer any of the questions the guys had so......
|
|
|
|
|
|
#9 |
|
Pro
Trade: Excavation, land clearing, sewer/water
Join Date: Dec 2007
Posts: 272
|
Re: Site Preparation For Future Concrete Slab On Clay Soil
Excavation.... I thought this sounded awful familiar.
|
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Installing a Door Slab | CookeCarpentry | Finish Carpentry | 62 | 07-11-2010 08:23 AM |
| Concrete Slab...Need to Tile Over It | Tommy C | Masonry | 4 | 04-07-2008 08:18 PM |
| Fiber reinforced slab cost in central NJ | gschotland | Masonry | 0 | 11-18-2006 02:27 PM |
| New to the site, Concrete Contractor in CT... | ConcreteNed | Excavation & Site Work | 7 | 02-14-2006 07:13 AM |
| Go to Page... |