|
|
Thread Tools | Search this Thread | Display Modes |
|
|
#1 |
|
Pro
Trade: Jack of most
Join Date: Feb 2006
Location: Northern California
Posts: 126
|
How Much Should I Charge?
Looking for an hourly rate to charge for chipping away at concrete to remove it. This would be a garage floor around a drain. Also removing a leveling concrete that was poured over the garage floor. I want to charge the maximum reasonable number here. No other bids on this project.
|
|
|
|
|
|
#2 | |
|
Pro
Trade: Masonry / architectural stone carving
Join Date: Apr 2005
Location: Central Texas
Posts: 365
|
Re: How Much Should I Charge?Quote:
|
|
|
|
|
|
|
#3 |
|
Pro
Trade: Jack of most
Join Date: Feb 2006
Location: Northern California
Posts: 126
|
Re: How Much Should I Charge?
Ok. Is $50/hr too much for someone to pay for this kind of work?
|
|
|
|
|
|
#4 | |
|
Pro
Trade: Consultant
Join Date: May 2005
Location: Holly Springs, GA
Posts: 1,221
|
Re: How Much Should I Charge?Quote:
Bob |
|
|
|
|
|
|
#5 |
|
Pro
Trade: Jack of most
Join Date: Feb 2006
Location: Northern California
Posts: 126
|
Re: How Much Should I Charge?
I guess I was just looking for what a reasonable number would be. $5 is not reasonable and neither is $100. I need to bill this to an estate and I want the rate to pass the smell test. Just not sure what some people charge to do this kind of manual, yet delicate labor.
Thanks. |
|
|
|
|
|
#6 |
|
Pro
Trade: Masonry / architectural stone carving
Join Date: Apr 2005
Location: Central Texas
Posts: 365
|
Re: How Much Should I Charge?
Carl,
I suppose that you need to have a handle on what the hourly rates are in your area, what you need to clear per/hour to meet your expenses, and a feel as to what the customer is thinking. Personally, I will no longer go out on a job for less than $35.00 plus material, and my shop time goes from $25.00 to $45.00/ hour and up depending on what kind of car the prospective client is driving, and how much of a pita that job will be.Or you can figure a daily rate that is an absolute minimum for getting in the truck, divide by 8 and there you have the low end for bid purposes. Even if the job only takes say 5 hours, I would charge for a full day since there is the drive time on either end, and the time spent looking at the job in the first place. Just don't ever sell yourself short. JVC |
|
|
|
|
|
#7 |
|
Pro
Trade: Jack of most
Join Date: Feb 2006
Location: Northern California
Posts: 126
|
Re: How Much Should I Charge?
Thanks JVC. That's what I was looking for. I had thought $50/hr was where I wanted to be, but had no idea if that was highway robbery or peanuts.
|
|
|
|
|
|
#8 |
|
Pro
Trade: Tile installations
Join Date: Apr 2005
Location: Long Island N.Y.
Posts: 433
|
Re: How Much Should I Charge?
I wouldn't pay you by the HR. to remove concrete if you showed up with a hammer and chisle, give one price for the job, maybe by sq. ft., I can rip out a whole driveway in an hr. with a backhoe and truck and pour new the same day, $50 wouldn't cut it then.
|
|
|
|
|
|
#9 |
|
Pro
Trade: masonry
Join Date: Jan 2006
Location: alva,oklahoma
Posts: 1,135
|
Re: How Much Should I Charge?
anything i do by the hour is $60 per hour for 2 men and equipment.if it is just me with no laborer i charge $40.00 p/h.with a min of $100.doesnt matter if i am there 30 mins or 2 hours it is 100.00.also if i have to drive out of town for the job it is from the time i leave home to the time i leave the job.
__________________
life is short,do your masonry naked!! http://ok.local.yahoo.biz/knabemasonry/index.html |
|
|
|
|
|
#10 | |
|
Pro
Trade: Wood working in spare time.
Join Date: Jan 2005
Location: kankakee county,Illinois
Posts: 1,539
|
Re: How Much Should I Charge?Quote:
|
|
|
|
|
|
|
#11 | |
|
Charitable animal
Trade: decks
Join Date: Feb 2006
Location: Chester Co. PA
Posts: 2,509
|
Re: How Much Should I Charge?Quote:
|
|
|
|
|
|
|
#12 | |
|
Pro
Trade: Jack of most
Join Date: Feb 2006
Location: Northern California
Posts: 126
|
Re: How Much Should I Charge?Quote:
__________________
MarQ Remodeling (no website) |
|
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| How many of you charge for... | andrew07 | General Discussion | 21 | 06-19-2008 05:20 PM |
| Charge for putting up paneling... | craftyman | Remodeling | 10 | 02-09-2008 02:35 AM |
| Estimates: Free or charge? | C.C.R. | Marketing & Sales | 40 | 02-04-2007 09:52 AM |
| Charge for estimating? | KellyPainting | Painting & Finish Work | 26 | 09-30-2006 07:32 PM |
| How much to charge? | gianlucaf | Painting & Finish Work | 27 | 11-14-2005 08:54 PM |
| Go to Page... |
