Footing on Wet Clay
We started on my personal home this last week and hit water at 2ft in 40% of a 600 ft waterline dig. We moved a lot of dirt for the pad and had soft spots at one end. Now the dozer guy says wait 2 weeks for everything to dry out. March is the rain season and I need to get the foundation done. Is there any way to dig the footings and drain them let the clay dry for a couple of days (3) then poor. Will the footing crack as the clay finishes drying due to proper irrigation later. Is there a method for installing foundations in the rainy part of the year. Ground is bedrock, red clay and some grey clay all mixed. The dozer guy also thinks there is shell deeper but 12 feet revealed nothing. I think that is it. Help need to keep moving this project along.
|
|
|
Warning: The topics covered on this site include activities in which there exists the potential for serious injury
or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!
Join the #1 Contractor Forum Today - It's Totally Free!
ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!
Join ContractorTalk.com - Click Here

|
02-27-2005, 10:52 PM
|
#2
|
|
Pro
Trade:
Residential Contractor
Join Date: Feb 2004
Location: Jensen Beach, FL
Posts: 10,464
|
My personal opinion is that you are building on a tenuous lot. I would not place a typical footer type foundation here. The water, current problem, will be back.
My first thought would be pilings driven or jetted to bedrock.
|
|
|
02-28-2005, 09:23 AM
|
#3
|
|
Pro
Trade:
underground
Join Date: Oct 2004
Posts: 3,080
|
Quote:
|
Originally Posted by The General
We started on my personal home this last week and hit water at 2ft in 40% of a 600 ft waterline dig. We moved a lot of dirt for the pad and had soft spots at one end. Now the dozer guy says wait 2 weeks for everything to dry out. March is the rain season and I need to get the foundation done. Is there any way to dig the footings and drain them let the clay dry for a couple of days (3) then poor. Will the footing crack as the clay finishes drying due to proper irrigation later. Is there a method for installing foundations in the rainy part of the year. Ground is bedrock, red clay and some grey clay all mixed. The dozer guy also thinks there is shell deeper but 12 feet revealed nothing. I think that is it. Help need to keep moving this project along. 
|
You REALLY should get a geotechnical consultant involved before you proceed further. Water at 2 feet deep can be indicative of a number of things and may or may not have much of an impact on your foundation design. As far as dewatering the pad area goes, you could install a sump pit at some location within the footprint, at least 4 feet deeper than your FF elevation, and run a sumbersible pump 24 x 7 to see if that impacts the water level / dries the soil. Homebuilders around here work year 'round and you can believe that if an excavator told them to wait for a pad to dry out they'd have another excavator very quickly.
As far as driving piles or drilling casings 70 some feet to bedrock...I don't see that being a cost effective alternative for your home. Three days of good weather, a good excavator and an experienced geo-tech should have you back on track.
|
|
|
02-28-2005, 09:30 AM
|
#4
|
|
General Contractor
Trade:
General Contractor
Join Date: Oct 2003
Location: Montana - where I belong.
Posts: 1,035
|
I'm with Teetor - when you start talking about clay there are all sorts of problems that need to be accounted for. With bedrock below clay the only direction it can expand is up. Drying out the soil for the pour is a temporary solution at best. I've seen clay expand 18" in 36 hours - imagine what would happen to your footing if that happens. The best way to counteract expansion is with caissons and void form. As pipeguy said - get a geotech to make recommendations on foundation design.
|
|
|
02-28-2005, 09:40 AM
|
#5
|
|
Pro
Trade:
underground
Join Date: Oct 2004
Posts: 3,080
|
Google search for 'Geotechnical, Arkansas, engineer' should give you a place to start
|
|
|
02-28-2005, 09:46 PM
|
#6
|
|
Registered User
Trade:
Join Date: Jan 2005
Posts: 12
|
Thanks for all the feedback. I am going to take some pictures tomorrow. Right now it looks like piers on the east end of footprint with 2x2 footer on top of piers. Going to lay out the house and dig a little and see what we get. I think it is just too much rain. 5in in Jan. avg is 2.4 and Feb was just as bad. Pipe the actual footprint is dry but on one end (where the driveway would be)the dozer ran over the ground so much it started pumping water to the surface. Will post pics but it did rain sunday.
|
|
|
02-28-2005, 10:06 PM
|
#7
|
|
Pro
Trade:
Residential Contractor
Join Date: Feb 2004
Location: Jensen Beach, FL
Posts: 10,464
|
the dozer ran over the ground so much it started pumping water to the surface.
I'm really NOT liking the sound of this.
|
|
|
03-01-2005, 12:42 AM
|
#8
|
|
General Contractor
Trade:
General Contractor
Join Date: Oct 2003
Location: Montana - where I belong.
Posts: 1,035
|
I've seen ground where it's hard to walk on but when any heavy equipment rolls by it "pumps" making it look like a wave of water.. that's definately going to cause problems.
|
|
|
03-06-2005, 09:18 PM
|
#9
|
|
Registered User
Trade:
Join Date: Jan 2005
Posts: 12
|
Well what's done is done. We poured the footing sat. Dirt was a 7 out of 10 according to the backhoe operator as for firm ness. We ended up moving the house to fit between the bad dirt and natural spring. Also took the whole elevation down to good dirt (4ft). 15k foundation just went to 30k but it is built the way I wanted.  New foundation is now 5 block high with crusher dust fill (no basement). Also ground is now sloped around footing and cost myself a pumper truck with 100ft boom. The natural spring I refer to is going to be under my driveway to the side of my house. I had the backhoe operator cut into it and at 2 ft just in that area you hit solid bedrock. Looks like the water sinks into the dirt then runs along the bedrock down hill. I will still try to post pictures, for some reason the ioio port on a lap top is not the same as a home computer so I will have to post them from work. Thanks again all and I will keep everyone posted.
|
|
|
03-06-2005, 09:59 PM
|
#10
|
|
Pro
Trade:
Residential Contractor
Join Date: Feb 2004
Location: Jensen Beach, FL
Posts: 10,464
|
I'm staggered!
You never mentioned a natural spring!
I wish you luck on your new home.
|
|
|
03-07-2005, 08:40 AM
|
#11
|
|
Pro
Trade:
underground
Join Date: Oct 2004
Posts: 3,080
|
Quote:
|
Originally Posted by The General
Dirt was a 7 out of 10 according to the backhoe operator as for firm ness. 15k foundation just went to 30k but it is built the way I wanted. New foundation is now 5 block high with crusher dust fill (no basement).
|
What part of that doubled the cost of your basement? The backhoe operator? The concrete pump? You said originally the block would be 3 - 4 courses tall, that's only 1 or 2 additional courses. If your foundation is 60 x 50 filled 5 block high that's less than 400 cy of fill.
7 out of 10 for firmness huh? If we were talkin' about woman I'd say you were in tall cotton. But since we're talkin' about foundations, I'm guessing you're in deep sh*t. Good luck.
|
|
|
03-07-2005, 09:18 AM
|
#12
|
|
General Contractor
Trade:
General Contractor
Join Date: Oct 2003
Location: Montana - where I belong.
Posts: 1,035
|
Whew.. clay with a natural spring nearby. I hate being negative - but I'll give it 2 years.
|
|
|
03-03-2010, 09:02 PM
|
#13
|
|
Member
Trade:
masonry
Join Date: Feb 2010
Location: russel co ,ky
Posts: 58
|
I wander how this guys house turned out
|
|
|
03-03-2010, 10:09 PM
|
#14
|
|
Pro
Trade:
masonry
Join Date: Feb 2006
Location: Austin
Posts: 3,725
|
The foundation repair guys made a killing.
__________________
It ain't Rocket Science unless you are building rockets.
|
|
|
03-03-2010, 11:38 PM
|
#15
|
|
Mason
Trade:
Bricklayer
Join Date: Dec 2009
Location: chicago
Posts: 19
|
make sure u put 2 separate pumps in yr basement...yr gonna need it
|
|
|
03-04-2010, 05:04 AM
|
#16
|
|
Pro
Trade:
Masonry
Join Date: Nov 2006
Location: Ivoryton CT
Posts: 968
|
Indoor pool
|
|
|
03-04-2010, 05:42 AM
|
#17
|
|
General Contractor
Trade:
New Home Construction-Additions-Remodeling
Join Date: May 2007
Location: NJ
Posts: 1,249
|
When building on clay soil,you have to make sure to give the load from the foundation and your house a wider area to spread over, so you will have to have a good drainage under your footings. Use a nice layer of 3/4 inch clean stone (8-10") under the footing.and the whole basement area in and out... use perforated pipe on the outside and inside of the footing tied in to the sump pump.Most likely your engineer will suggest that and to use a footing 2 maybe 3 times wider than your foundation wall with re-bar. Engineer will calculate everything based on what you have there,i.e. the weight of the house, strength of the soil,etc. Good idea to bring in fill for backfill to make sure you have a good drainage around your foundation. Don't use existing clay to backfill your foundation. Good luck
__________________
I never lost a cent on the jobs I didn't get!
Last edited by greg24k; 03-04-2010 at 07:14 AM.
|
|
|
03-04-2010, 08:45 AM
|
#18
|
|
Pro
Trade:
masonry
Join Date: Feb 2006
Location: Austin
Posts: 3,725
|
This was 5 years ago, FYI.
__________________
It ain't Rocket Science unless you are building rockets.
|
|
|
03-04-2010, 09:35 AM
|
#19
|
|
Pro
Trade:
masonry
Join Date: Jan 2006
Location: alva,oklahoma
Posts: 1,034
|
i hear he has a nice trout pond in his crawl space.
|
|
|
03-04-2010, 11:35 AM
|
#20
|
|
Member
Trade:
Masonry and Stone Work
Join Date: Feb 2010
Location: Maryland
Posts: 46
|
LOL, people dont look at the year this was written. I wonder also how did everything go...
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate This Thread |
Linear Mode
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|