Contractor Talk - Construction and Remodeling Site
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Contractor Talk - Professional Construction and Remodeling Forum > Trade Talk > Masonry

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 10-27-2009, 06:41 PM   #1
Registered User
Trade: pipe fence building
 
Join Date: May 2009
Posts: 3
brick chimney sealant

Any suggestions on a siloxane-based sealant that will last for 5-10 years that doesn't have a gloss coat? There is some water penetration occuring through either the brick or grout. thanks for any help...du

David U is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 10-27-2009, 06:45 PM   #2
Chief outhouse engineer
 
dakzaag's Avatar
Trade: mason
 
Join Date: Jan 2009
Location: NW Indiana
Posts: 365
You might want a mason to take a look, sometimes these things are tough to identify.

Following link is short and sweet, three or four different options, all nationwide and reputable.

http://www.contractortalk.com/f48/se...f-brick-36056/


Five to ten years may be a stretch, sell three to five and be pleasantly suprised.
__________________
D K & Sons
The maintenance schedule for brick
1. Stand back and say "man that looks nice!"
2. Repeat as often as needed.
dakzaag is offline   Reply With Quote
Old 10-28-2009, 02:30 AM   #3
Member
Trade: Brickwork
 
Join Date: Oct 2009
Location: Somerset, England
Posts: 41
Nowadays we always put a lead tray in just above the rafter line on a new or rebuild as shown in the video here.
http://www.justlead.co.uk/dpc-chimney-tray.html
Damp penetration in stacks has always been a problem here, especially now that people tend to use their central heating more than the open fires which dried out the stacks.
Siloxane is good, but a tray is a more permanent solution and part of our codes now.
stuart45 is offline   Reply With Quote
Old 10-28-2009, 07:30 AM   #4
Registered User
Trade: pipe fence building
 
Join Date: May 2009
Posts: 3
Thanks for the help..du
David U is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
something for the masonry department dakzaag Masonry 2 05-08-2009 09:23 PM
Dangerous Chimney Dilemna The Boss Masonry 27 04-25-2009 08:35 PM
Adding a Brick Ledge to a Michigan Home bajafx4 Masonry 3 01-23-2009 07:19 PM
ICF brick ledge coupe33 General Discussion 7 11-29-2008 01:45 AM
Brick Veneer Chimney w/ Factory Insert rhomfeld Carpentry 6 09-15-2006 08:23 PM




Top of Page | View New Posts


All times are GMT -5. The time now is 08:51 AM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC