does anyone bid jobs by time and material ? such as for steps or any one day job . what are your bidding process for small jobs???? thanks
|
|
|
|
|
|
#2 |
|
Pro
![]() Trade: Monkey Scratching Cat Herder
Join Date: Feb 2006
Location: Austin
Posts: 4,763
|
Re: ????
The first jobs that I bid, I wrote down every single item that would be consumed for the job (both materials and things that wear out), and costed them at 130% of actual.
Then I wrote down every tool I would need to complete the job, and costed them as though I were either renting them (power tools) or buying them (hand tools), with exceptions for normal trade tools. The third step was to guess at how long each step of the process would take, and how many persons would be required, if more than one (I was working with epoxy coatings, so usualy more than 1). I would cost that at what I would have to pay someone to perform the work. Finally, I would add all those numbers up and add what I wanted to make on the job (usually 30%). Keep in mind that I when I costed the labor, I did not deduct for the work I personally would perform, it was figured in just like I was paying someone else to do it. This worked on jobs from about $500-5,000 (1980's dollars), and I never lost money on any job. You will not get every job you bid, and if you do, you are way too cheap. |
|
|
|
|
|
#3 |
|
Pro
Trade: Residential Contractor
Join Date: Feb 2004
Location: Jensen Beach, FL
Posts: 10,475
|
Re: ????
You first have to know the value of a day (overhead + profit).
Short jobs, a couple of hours = 1/2 day. Longer jobs, 4 hrs.+ = a whole day because you cannot go on to do something else.
__________________
You can't solve you're problems with the same level of thinking that created the problems. Albert Einstein |
|
|
|
|
|
#4 |
|
Pro
Trade: Swimming Pool Contractor
Join Date: Oct 2006
Posts: 2,165
|
Re: ????
on smaller jobs tack on your truck payment if you have one... couple hundred bucks is not a deal breaker.