does anyone bid jobs by time and material ? such as for steps or any one day job . what are your bidding process for small jobs???? thanks

masonking02 is offline  
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Old 05-13-2007, 06:32 PM   #2
Pro
 
Tscarborough's Avatar
 
Trade: Monkey Scratching Cat Herder
Join Date: Feb 2006
Location: Austin
Posts: 4,763

Re: ????


The first jobs that I bid, I wrote down every single item that would be consumed for the job (both materials and things that wear out), and costed them at 130% of actual.

Then I wrote down every tool I would need to complete the job, and costed them as though I were either renting them (power tools) or buying them (hand tools), with exceptions for normal trade tools.

The third step was to guess at how long each step of the process would take, and how many persons would be required, if more than one (I was working with epoxy coatings, so usualy more than 1). I would cost that at what I would have to pay someone to perform the work.

Finally, I would add all those numbers up and add what I wanted to make on the job (usually 30%). Keep in mind that I when I costed the labor, I did not deduct for the work I personally would perform, it was figured in just like I was paying someone else to do it.

This worked on jobs from about $500-5,000 (1980's dollars), and I never lost money on any job.

You will not get every job you bid, and if you do, you are way too cheap.
Tscarborough is online now  
Old 05-13-2007, 06:46 PM   #3
Pro
 
Teetorbilt's Avatar
 
Trade: Residential Contractor
Join Date: Feb 2004
Location: Jensen Beach, FL
Posts: 10,475

Re: ????


You first have to know the value of a day (overhead + profit).

Short jobs, a couple of hours = 1/2 day. Longer jobs, 4 hrs.+ = a whole day because you cannot go on to do something else.
__________________
You can't solve you're problems with the same level of thinking that created the problems.

Albert Einstein
Teetorbilt is offline  
Old 05-13-2007, 06:56 PM   #4
Pro
 
POOLMANinCT's Avatar
 
Trade: Swimming Pool Contractor
Join Date: Oct 2006
Posts: 2,165

Re: ????


on smaller jobs tack on your truck payment if you have one... couple hundred bucks is not a deal breaker.
__________________
......Less with the jaw & More with the paw.....
POOLMANinCT is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Join Now... It's Fast and FREE!

Privacy Badge
I am a professional contractor
I am a DIY Homeowner
ContractorTalk.com is for
PROFESSIONAL CONTRACTORS ONLY!

At ContractorTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?