How are you guys doing. I am a general contractor constructing a two story library for a public entity, it is approximatly 11,000 sq ft. the library is on the second floor and the parking garage is on the ground floor, (first floor). I am being told to build the 2nd floor (the deck) first then the ground floor. any thoughts?.
|
|
|
|
|
|
#2 | |
|
Pro
Trade: Framing
Join Date: Jan 2009
Location: Utica,NY
Posts: 2,052
|
Re: What Goes FirstQuote:
Welcome to the site. Now why not just start with the roof first??
|
|
|
|
|
|
|
#3 |
|
Registered User
Trade: General Contractor
Join Date: Nov 2009
Posts: 3
|
Re: What Goes First
But thats what I am looking for. reasons why to start second floor.
|
|
|
|
|
|
#4 |
|
The Duke
Trade: Cabinet Maker
Join Date: Mar 2006
Location: Portland, Maine
Posts: 10,086
|
Re: What Goes First
Maybe you are not stating exactly what you mean since what I interpret is that either you or they need a straight jacket and a whole lot of Valium. Can you explain with a little more detail than levitating the second floor in violation of Newton's Law?
Please start a new thread about this in the Construction Forum
__________________
If you correct your mind, the rest of your life will fall into place ~Lao Tzu Custom Cabinetry - Portland, Cape Elizabeth, Scarborough, Kennebunkport, Yarmouth, Falmouth, Cumberland, Ogunquit, Maine Salmon Falls Cabinetry |
|
|
|
|
|
#5 | |
|
Pro
Trade: Framing
Join Date: Jan 2009
Location: Utica,NY
Posts: 2,052
|
Re: What Goes FirstQuote:
|
|
|
|
|
|
|
#6 |
|
Registered User
Trade: General Contractor
Join Date: Nov 2009
Posts: 3
|
Re: What Goes First
It's a concrete deck (second floor), forms shoring, rebar, they want to pour the second floor first. So we will put our shoring in place, form, set rebar, electrical, etc etc and pour. Then when that is complete and we can remove shoring we will pour ground floor.
|
|
|
|
|
|
#7 | |
|
Pro
Trade: General Contractor
Join Date: Oct 2008
Location: South Carolina
Posts: 1,386
|
Re: What Goes FirstQuote:
![]() Huh? |
|
|
|
|
|
|
#8 |
|
framer
Trade: framing
Join Date: Feb 2007
Location: S.E. mass
Posts: 154
|
Re: What Goes First
If your just talking about placing the slab they do that all the time around here.
Never made much sense to me until I asked and they said it was to protect the finished garage slabs. Some jobs have gone as far as pouring footings well below the slab for shoring posts and such. I've seen some slabs get pretty banged up just from normal construction,this way the owner gets the nice new floor he paid for. |
|
|
|
![]() |