What goes first

How are you guys doing. I am a general contractor constructing a two story library for a public entity, it is approximatly 11,000 sq ft. the library is on the second floor and the parking garage is on the ground floor, (first floor). I am being told to build the 2nd floor (the deck) first then the ground floor. any thoughts?.

hotrod1148 is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 11-19-2009, 01:14 PM   #2
Pro
Trade: Framing
 
Join Date: Jan 2009
Location: Utica,NY
Posts: 872
Quote:
Originally Posted by hotrod1148 View Post
How are you guys doing. I am a general contractor constructing a two story library for a public entity, it is approximatly 11,000 sq ft. the library is on the second floor and the parking garage is on the ground floor, (first floor). I am being told to build the 2nd floor (the deck) first then the ground floor. any thoughts?.

Welcome to the site.
Now why not just start with the roof first??
Framer53 is offline   Reply With Quote
Old 11-19-2009, 01:18 PM   #3
Registered User
Trade: General Contractor
 
Join Date: Nov 2009
Posts: 3
But thats what I am looking for. reasons why to start second floor.
hotrod1148 is offline   Reply With Quote
Old 11-19-2009, 01:31 PM   #4
The Duke
 
framerman's Avatar
Trade: Custom Carpentry and Design
 
Join Date: Mar 2006
Location: Portland, Maine
Posts: 4,734
Blog Entries: 7
Maybe you are not stating exactly what you mean since what I interpret is that either you or they need a straight jacket and a whole lot of Valium. Can you explain with a little more detail than levitating the second floor in violation of Newton's Law?

Please start a new thread about this in the Construction Forum
framerman is offline   Reply With Quote
Old 11-19-2009, 01:36 PM   #5
Pro
Trade: Framing
 
Join Date: Jan 2009
Location: Utica,NY
Posts: 872
Quote:
Originally Posted by framerman View Post
Maybe you are not stating exactly what you mean since what I interpret is that either you or they need a straight jacket and a whole lot of Valium. Can you explain with a little more detail than levitating the second floor in violation of Newton's Law?

Please start a new thread about this in the Construction Forum
A man with a way with words!
Framer53 is offline   Reply With Quote
Old 11-19-2009, 01:38 PM   #6
Registered User
Trade: General Contractor
 
Join Date: Nov 2009
Posts: 3
It's a concrete deck (second floor), forms shoring, rebar, they want to pour the second floor first. So we will put our shoring in place, form, set rebar, electrical, etc etc and pour. Then when that is complete and we can remove shoring we will pour ground floor.
hotrod1148 is offline   Reply With Quote
Old 11-19-2009, 07:45 PM   #7
Pro
 
SC sawdaddy's Avatar
Trade: General contractor
 
Join Date: Oct 2008
Location: South Carolina
Posts: 766
Quote:
Originally Posted by hotrod1148 View Post
It's a concrete deck (second floor), forms shoring, rebar, they want to pour the second floor first. So we will put our shoring in place, form, set rebar, electrical, etc etc and pour. Then when that is complete and we can remove shoring we will pour ground floor.

Huh?
SC sawdaddy is offline   Reply With Quote
Old 11-19-2009, 10:32 PM   #8
framer
 
steves's Avatar
Trade: framing
 
Join Date: Feb 2007
Location: S.E. mass
Posts: 138
If your just talking about placing the slab they do that all the time around here.
Never made much sense to me until I asked and they said it was to protect the finished garage slabs. Some jobs have gone as far as pouring footings well below the slab for shoring posts and such.
I've seen some slabs get pretty banged up just from normal construction,this way the owner gets the nice new floor he paid for.
steves is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Top of Page | View New Posts


All times are GMT -5. The time now is 12:48 AM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC