Thin layer of concrete

Hello

New to the forum and glad to have found it. I have a question about concrete. I have a customer that wants to frame in an existing covered patio to create a closet. The existing slab however is about 1.5" lower than the house's slab. What is the best method for creating the same level between the two? I haven't done much work with concrete and I'm concerned and need some help. Certain type of concrete? What type of reinforcement, if any? Bonding agent? Thanks for any advice.

John

jtcamp is online now   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 09-14-2009, 05:55 PM   #2
General Contractor
 
Willie T's Avatar
Trade: General Contractor
 
Join Date: Jan 2009
Location: St. Petersburg, FL
Posts: 474
Even your local HD carries the thin concrete and bonding agent. The stuff they have is good for as thin as 3/4"... Better places carry some that will go on as thin a s 1/2". The HD stuff is about $15 a bag. A one car garage at 1.5" will cost you at least $2,000.
__________________
"True eloquence consists in saying all that is necessary, and only that which is."
François Duc de La Rochefoucauld
Bill Everett - St. Petersburg, FL
Willie T is offline   Reply With Quote
Old 09-14-2009, 05:58 PM   #3
Illusion of Perfection
 
CookeCarpentry's Avatar
Trade: Residential Remodeler/Custom Carpenter
 
Join Date: Feb 2009
Location: Wayne, PA
Posts: 678
What about a P/T sleeper system with plywood?
__________________
Mark
Wayne, PA
"It is what it is."
CookeCarpentry is offline   Reply With Quote
Old 09-14-2009, 06:41 PM   #4
Chief Toilet Mover
 
Mike Finley's Avatar
Trade: Bathroom Remodeling
 
Join Date: Apr 2004
Location: Littleton, Colorado
Posts: 11,758
What's the final flooring going to be?

Mapei makes products designed for doing this that can go from feather edge to 4".

Here are their floor leveler products, best way to figure out what you need is to start with what the finished flooring will be.

http://www.mapei.us/
Mike Finley is offline   Reply With Quote
Old 09-14-2009, 07:49 PM   #5
Contractor
Trade: Remodeling & Home Additions
 
Join Date: Sep 2006
Location: Delaware
Posts: 1,354
the size of the floor may move you in one direction or the other. the floor leveler for a large area could get expensive. your location is also important and try to describe conditions such as moisture in the area.
72chevy4x4 is offline   Reply With Quote
Old 09-15-2009, 12:00 AM   #6
Registered User
Trade: Remodeling
 
Join Date: Sep 2009
Posts: 3
Thanks for the responses so far.

The area is 70 sq ft and the finished floor will be carpet. The patio exists at the highest elevation on the property, so moisture is running away from it. Am I wrong in thinking that the two floors need to be at the same height?

I apologize, but I am new to some of this. For the last few years I have always worked along side of a professional and this most recent job is now in my hands. Thanks for all the help.

John
jtcamp is online now   Reply With Quote
Old 09-15-2009, 06:32 AM   #7
Pro
Trade: Remodeler
 
Join Date: Sep 2005
Posts: 930
You will have to deal with ground moisture migrating up through the slab and also your wall plates need to be 8" above grade.
TimNJ is offline   Reply With Quote
Old 09-15-2009, 09:20 AM   #8
Chief Toilet Mover
 
Mike Finley's Avatar
Trade: Bathroom Remodeling
 
Join Date: Apr 2004
Location: Littleton, Colorado
Posts: 11,758
Quote:
Originally Posted by jtcamp View Post
Thanks for the responses so far.

The area is 70 sq ft and the finished floor will be carpet. The patio exists at the highest elevation on the property, so moisture is running away from it. Am I wrong in thinking that the two floors need to be at the same height?

I apologize, but I am new to some of this. For the last few years I have always worked along side of a professional and this most recent job is now in my hands. Thanks for all the help.

John
Gone to Mapei's website yet or still f'ing around?

Apply one of the Planiseal versions (you will at least have to contribute enough to the solution to figure out which one you need) - Planiseal will eliminate the moisture migration issues in the concrete.

Frame it with double bottom plates made from PT.

Look at Ultratop which will level up to 2", and level the floor to the height of the existing floor.

After that is it going to be glue down or stretched carpet?

Last edited by Mike Finley; 09-15-2009 at 09:23 AM.
Mike Finley is offline   Reply With Quote
Old 09-15-2009, 12:00 PM   #9
Registered User
Trade: Remodeling
 
Join Date: Sep 2009
Posts: 3
Thank you both.

Mike-
Going to the website now...got the hint.

I was thinking of gluing down the carpet but open to suggestions.

John
jtcamp is online now   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Concrete Company delivered junk concrete. How best to pursue? marcomjl Concrete & Paving 39 09-19-2009 09:08 AM
4x4 posts in concrete vs. saddles Strongarm Decks & Fencing 20 08-31-2009 09:41 PM
Thin Brick over Painted Concrete Tommy C Masonry 5 08-27-2009 07:33 AM
Thin Brick Underlayment Cache Masonry 5 10-07-2008 08:58 AM
cement wash or concrete rub a thin layer over brick pavers brownstone89 Masonry 14 08-25-2008 06:14 PM




Top of Page | View New Posts


All times are GMT -5. The time now is 08:12 PM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC