07-11-2009, 07:27 AM
|
#1
|
|
Contractor
Trade:
Remodeling & Home Additions
Join Date: Sep 2006
Location: Delaware
Posts: 1,354
|
jacking floor joists in multi-level
I'm putting together a bid for a three story apartment complex (wood constuction) that needs the 2nd floor ceiling jacked up in the living room b/c of severe sag. The engineer has written up the fix-everything to his specs.
two options-first is an exposed beam supporting the joists which is easy enough. the second is burying the beam in the ceiling which involves cutting every joist and hanging them off the parallam w/ simpson's.
does anyone have experience with burying a beam like this? for an exposed beam, I envisioned the jacking the beam up which raises the floor joists. for a flush beam it seems like I would be using two exposed beams (one supporting either side of the cut) to support/raise to the new flush beam.
sorry for the length-would be nice to cover all bases in the bid.
|
|
|
Warning: The topics covered on this site include activities in which there exists the potential for serious injury
or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!
Join the #1 Contractor Forum Today - It's Totally Free!
ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!
Join ContractorTalk.com - Click Here

|
07-11-2009, 07:47 AM
|
#2
|
|
Pro
Trade:
GC/Remodeling
Join Date: Sep 2007
Location: Central America (Kansas)
Posts: 623
|
Temp Walls....
Burried electrical/plumbing could be a deal breaker for flush.
__________________
Quote:
Originally Posted by jeremy-lvhm
...just stop it. go sit down and have a lollipop and think about what your saying. 
|
Last edited by TimelessQuality; 07-11-2009 at 08:12 AM.
|
|
|
07-11-2009, 08:01 AM
|
#3
|
|
Pro
Trade:
LI,NY designer, new homes, renovation work, concre
Join Date: Mar 2008
Location: Long Island, NY
Posts: 4,162
|
Depending on the lenth of the joists, there may be an advantage to a flush header. Often when a sag like you describe occurs, the beams will not go back, they will retain there sag, then when you try to jack, you will lift them off there plates. If you go the cut, flush header route, the low point in the sag is the cut location, giving you a better shot at acheiving a straight plain. G
For flush beam/temp wall either side of cut
__________________
|
|
|
07-11-2009, 08:07 AM
|
#4
|
|
Sean
Trade:
General Contractor
Join Date: Sep 2008
Location: Cullman, AL
Posts: 3,419
|
You are also planning on putting a temp wall up in the first floor apartment also, right?
|
|
|
07-11-2009, 08:10 AM
|
#5
|
|
Curmudgeon
Trade:
carpentry/remodeling/"Yes M'am we do"
Join Date: Apr 2006
Location: Beech Grove, Indiana, Birthplace of the "King of Cool"
Posts: 10,153
|
I would add, it would be good
to build an A-frame temp wall
on the first floor as well.
Then you'll know you're raising
the ceiling, not lowering
the floor. 
If you use A-frames for the two
temps next to your beam,
you can just adjust them to get
your joist back flush with the new beam.
__________________
Put your location in your profile!
(Sorry....it seems there really are dumb questions)
|
|
|
07-11-2009, 09:19 AM
|
#6
|
|
Pro
Trade:
general contractor
Join Date: Oct 2008
Location: Sterling ,Alaska
Posts: 731
|
duh!
|
|
|
07-11-2009, 10:19 AM
|
#7
|
|
Home Depot aisle walker
Trade:
home remodeling
Join Date: Mar 2009
Location: Tulsa OK
Posts: 906
|
Have done a couple buried beams to get rid of weight bearing walls, I used steel I-beam with 2x12 sandwich, temp walls on either side, dont forget about possible heat/air duct, tougher to deal with than elect/plumbing issues.
|
|
|
07-11-2009, 10:38 AM
|
#8
|
|
woodchuck2
Trade:
Electrical Contractor&Home Maintenance
Join Date: Feb 2008
Location: Chestertown, NY/Lower Adirondacks
Posts: 1,020
|
I dont have very much experience with this type of thing but why did the ceiling sag to begin with, poor engineering? I would more inclined to think that this building was remodeled at one time and a load bearing wall may have been removed so who knows what kind of a mess you will find when you remove the drywall/plaster. Definitly factor in stress time, headache time and of course Miller time.
I have been dealing with a similar situation that my own father had worked on in our own home. The home is made with concrete walls and first floor is concrete. Under this floor about 10-12" down is a concrete floor from a building that stood there before this one. Over time one wall in the back of the building broke through the floor and has settled a good 3 1/2"-4", in the process the floor sagged with it. My father jacked up the main beam for the floor to level the floor out but in the process this payed havoc with the wall and upstairs cielings. It has now sat so long like this that i cannot manipulate the beam, the walls or the ceilings back to where they were so i can try to raise the wall back in place. This too is a two story building with a full attic and was built in 1902, all wood is rough cut to boot.
__________________
06 Chevy D-Max ECSB, 8' Fisher plow, 6' Salty Dogg in bed sander,
06 Chevy D-Max RCLB, 8' Fisher plow, 98 Sumitomo mini excavator, 96 7k 16' Phoenix car trailer, 06 12K 18' Cam-Superline equipment trailer
04 7k 6'X10' Kristi dump trailer, 07 7k 7X14 Continental V-nose enclosed trailer
|
|
|
07-11-2009, 01:29 PM
|
#9
|
|
Contractor
Trade:
Remodeling & Home Additions
Join Date: Sep 2006
Location: Delaware
Posts: 1,354
|
interesting point Gene-thanks.
Neo-what's are you referring to as an A frame? I will have to set posts down to the footer first an ensure jacking is pushing down the post, but I'm still thinking of how to do this (with ease). I have a concern of pushing up the joists and the ends (which have pulled down b/c of the curvature of the beam) not 'floating' back up the top plates but pushing against them.
severe dip is attributed to moisture damage at the 8' patio door, termite damage in spots and overloading of above floor system (gypcrete too thick).
1st floor gets 4x4 straight to the concrete floor and I will have to ensure there is a 4" slab then attach a simpson connector. squash blocks between floors and no electrical in ceilings
|
|
|
07-11-2009, 02:06 PM
|
#10
|
|
Curmudgeon
Trade:
carpentry/remodeling/"Yes M'am we do"
Join Date: Apr 2006
Location: Beech Grove, Indiana, Birthplace of the "King of Cool"
Posts: 10,153
|
Quote:
Originally Posted by 72chevy4x4
...........
Neo-what's are you referring to as an A frame? I will have to set posts down to the footer first an ensure jacking is pushing down the post, but I'm still thinking of how to do this (with ease). I have a concern of pushing up the joists and the ends (which have pulled down b/c of the curvature of the beam) not 'floating' back up the top plates but pushing against them. ..............
|
Instead of cutting studs to length,
cut them long and make a few
/\ , then you can just tap the bottoms
toward each other to snug, or raise
the top plates.
__________________
Put your location in your profile!
(Sorry....it seems there really are dumb questions)
|
|
|
|
The Following User Says Thank You to neolitic For This Useful Post:
|
|
07-14-2009, 08:41 AM
|
#11
|
|
Pro
Trade:
Construction Assistant Superintendant/Remodeler
Join Date: May 2009
Location: Jacksonville, Fl
Posts: 1,141
|
Quote:
Originally Posted by genecarp
For flush beam/temp wall either side of cut
|
I'm curious Gene if it would be fesable if in place of building 2 temp walls that he uses adjustable jackstands instead?(depending on rental costs etc) then instead of tearing down the "walls" after, he can just pop them out. Years ago my parents had that prob and if I remember corectly(of course I'm trying to remember through my "chemical"/alchohol hase of the 80's  ) the contractors used them in our finished basement to adress the sag problem of the floor joists for the ground floor. I've also seen simular jackstands used to support the plywood forms for slab pours on commercial sites.
On several occcasions for one company I worked for we had to crawl under off grade laundrymats in apartment complexes. We took a pair of 12 ton bottle jacks jacked the sag out and then sisterd a 2"X12" the length of pylon to pylon to each floor joist. So since it was a different senario we couldn't get much under the confined area and I'm curious about the jackstand application.
I await your knowledgeable reply kind sir.
|
|
|
07-14-2009, 01:08 PM
|
#12
|
|
Pro
Trade:
LI,NY designer, new homes, renovation work, concre
Join Date: Mar 2008
Location: Long Island, NY
Posts: 4,162
|
Quote:
Originally Posted by jtpro
I'm curious Gene if it would be fesable if in place of building 2 temp walls that he uses adjustable jackstands instead?(depending on rental costs etc) then instead of tearing down the "walls" after, he can just pop them out. Years ago my parents had that prob and if I remember corectly(of course I'm trying to remember through my "chemical"/alchohol hase of the 80's  ) the contractors used them in our finished basement to adress the sag problem of the floor joists for the ground floor. I've also seen simular jackstands used to support the plywood forms for slab pours on commercial sites.
On several occcasions for one company I worked for we had to crawl under off grade laundrymats in apartment complexes. We took a pair of 12 ton bottle jacks jacked the sag out and then sisterd a 2"X12" the length of pylon to pylon to each floor joist. So since it was a different senario we couldn't get much under the confined area and I'm curious about the jackstand application.
I await your knowledgeable reply kind sir. 
|
Adjustable jack stands are an option, the only reason i usually go with the temp wall is to avoid building a header. With the jack at each end, depending on the load, you need a header in between to support, some conditions will create a large load which would require a large header. Additionally going with the jacks create point loads. Temp wall and plates distributes the load over a larger area, This is a good thing, G
__________________
|
|
|
07-14-2009, 01:15 PM
|
#13
|
|
Pro
Trade:
LI,NY designer, new homes, renovation work, concre
Join Date: Mar 2008
Location: Long Island, NY
Posts: 4,162
|
One more note, jacks are used for lifting a load, as in correcting structural issues, when we refer to temp walls, they are typically not used to lift, they are used to hold, or temporarily support a load while structural changes are made. G
__________________
|
|
|
07-14-2009, 01:43 PM
|
#14
|
|
Pro
Trade:
Builder/Remodeler
Join Date: Jul 2007
Location: Indianapolis, Indiana
Posts: 2,070
|
How much sag are you trying to get out and over what span? How long and what size is the new beam?
Was the original framing overspanned or was a structural element removed at some point? What caused the sag?
How it's done is usually a matter of the logistics in getting the beam in there. If you're tucking under--I usually prefer to slightly over jack the sag out to get the beam in place and then let the loads back down on it. Making it flush requires a lot of forethought since your temp walls will be in the way once they're up. As Gene said--if you don't have good load transfer to the foundation for your jacks--a temp wall is definitely the best way to go.
It also depends on what's on the floor above. If there are baths with tile floors (mortar beds?)--jacking could be asking for a lot of trouble.
|
|
|
07-14-2009, 02:12 PM
|
#15
|
|
Home Depot aisle walker
Trade:
home remodeling
Join Date: Mar 2009
Location: Tulsa OK
Posts: 906
|
A steel I-beam I like to use
Weight per ft depth width flange thickness web thickness
14lbs -------11 7/8 --4" ---------1/4 ----------3/16
Will hold a lot of weight for its relative lightness, cheap too compared to a lam
Last edited by willworkforbeer; 07-14-2009 at 02:14 PM.
|
|
|
07-14-2009, 02:54 PM
|
#16
|
|
Pro
Trade:
GC/Remodeling
Join Date: Sep 2007
Location: Central America (Kansas)
Posts: 623
|
Quote:
Originally Posted by willworkforbeer
A steel I-beam I like to use
Weight per ft depth width flange thickness web thickness
14lbs -------11 7/8 --4" ---------1/4 ----------3/16
Will hold a lot of weight for its relative lightness, cheap too compared to a lam
|
Dude..........
I think we're obligated (I know I am) to refrain from making specific recommendations, that ANYONE who reads may construe as fact.
What's a 'lot' of weight ?? 'Shed roof' or Hyatt Skywalk?
Without inspecting a situation, no one can recommend anything..
From his description of the damage (water and termite), I think he has bigger problems, but I Don't Know
D@mn I'm grumpy lately  
__________________
Quote:
Originally Posted by jeremy-lvhm
...just stop it. go sit down and have a lollipop and think about what your saying. 
|
|
|
|
07-14-2009, 06:43 PM
|
#17
|
|
Home Depot aisle walker
Trade:
home remodeling
Join Date: Mar 2009
Location: Tulsa OK
Posts: 906
|
Quote:
Originally Posted by TimelessQuality
Dude..........
I think we're obligated (I know I am) to refrain from making specific recommendations, that ANYONE who reads may construe as fact.
What's a 'lot' of weight ?? 'Shed roof' or Hyatt Skywalk?
Without inspecting a situation, no one can recommend anything..
From his description of the damage (water and termite), I think he has bigger problems, but I Don't Know
D@mn I'm grumpy lately   
|
Depends on how its loaded of course, but it is a strong beam. Anyone doing something involving support is going to have to run some numbers. Its not a specific recommendation, just an idea, throwing it out there. Is that better grumpy?
|
|
|
|
The Following User Says Thank You to willworkforbeer For This Useful Post:
|
|
07-14-2009, 10:24 PM
|
#18
|
|
Member
Trade:
remodeling
Join Date: Dec 2008
Location: north east ohio
Posts: 78
|
If your beam is going under, you could cut the joist above the new beam location to allow it to lift without lifting the ends. Obviously this would be done aftrer the temp walls are in.
If your going to try to make a blind header, I doubt you will be able to get enough beam strength with only a 2x10 header(assuming 2x10 joist).
I would have an engineer calculate your loads and spec out a flitch plate or beam size.
Oh and don't forget to put your header materials between the temp walls first.
|
|
|
07-14-2009, 10:37 PM
|
#19
|
|
Curmudgeon
Trade:
carpentry/remodeling/"Yes M'am we do"
Join Date: Apr 2006
Location: Beech Grove, Indiana, Birthplace of the "King of Cool"
Posts: 10,153
|
Quote:
Originally Posted by Home Work Pro
........
Oh and don't forget to put your header materials between the temp walls first. 
|
Someone told you about that, right?
__________________
Put your location in your profile!
(Sorry....it seems there really are dumb questions)
|
|
|
07-14-2009, 10:45 PM
|
#20
|
|
Pro
Trade:
framer
Join Date: Jul 2009
Location: columbus, OH
Posts: 177
|
How many of us have learned that the hard way than been told it? Don't be ashamed to admit it. Neolitic I'm looking in your direction.
__________________
What would you say...ya do here?
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate This Thread |
Linear Mode
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|