Contractor Talk - Construction and Remodeling Site
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Contractor Talk - Professional Construction and Remodeling Forum > Trade Talk > Specialty Trades > Windows, Siding and Doors

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 08-27-2008, 07:20 PM   #1
Pro
Trade: Roofing Contractor
 
Join Date: Dec 2006
Location: NW Suburbs of Chicago
Posts: 6,705
What Is The List Of Every Line Item Possible For Siding Jobs From Insurance Cos.?

Here, I did a similar thread topic in the Roofing Sub-Forum and wanted to see what each and every line item to be listed out for siding jobs being calculated for the home owners initial benefit and obviously for the contractors ultimate benefit of providing the top level project.

Ed

See my roofing list and then come up with a siding and anything connected to the siding tyoe of list please.

I want a Siding and auxilliarry list to be created.



This Roofing List is just an example:

I am not asking the rates, because they vary, but what specific individual line items can you think of when doing a complete residential roof replacement.

I will seek someone afterwards for the Xactimate or Power Claim regional unit prices.

Ed
  1. Is a salesmans commission part of the job? It IS an actual Job Cost, isn't it? A commissioned salesman only earns when jobs are sold.
  2. How does OSHA compliance safety subpart-M issues get calculated into the job scope. Heck, anything with an eave edge over 6 feet above the ground requires a minimum of bottom of the roof toe boards and cleats, right?
  3. Dumpster Fee per job, not being re-used on another project.
  4. Tear-off, One Layer or multiple layers
  5. Staples take longer to remove, so does a previously stapled roof get paid higher.
  6. Pulling out all old roofing nails versus banging them in.
  7. Exhaust vent products.
  8. B-Vent re-seating and water-profing the flange.
  9. Chimney flashings on masonry structures.
  10. Simulated chimney surrounds, like Majestic Chimney tops.
  11. Like kind and quality shingle off and priced for same going on.
  12. 15# or 30# felt paper.
  13. Ice and water shield, 3 feet minimum and at least 24" past the exterior heated walls. Code required or only if they have it already.
  14. Plywood decking removal and replacement.
  15. Securing interior attic insulation from blowing out of position when roof deck sheathing is removed.
  16. Rafter replacement.
  17. Sistering in rafters.
  18. Gutter Eave Edge Gutter Apron flashings.
  19. Rake Edge ODE, T-Style Drip edge.
  20. Starter course shingles on eaves.
  21. Bleeder strip starters on rake edges.
  22. Plumbing Vent pipe flashings, remove and replace.
  23. Fascia board remove and replace, 1" x 4", 1" x 6", 1" x 8", etc...
  24. Aluminum gutters remove and replace and downspout leader pipes.
  25. Gutter screening or gutter leaf guard protection.
  26. Ridge Ventilation.
  27. Powered Exhaust Vents.
  28. Carpenter ant discovery and removal and remediation.
  29. Wet insulation removal and replacement.
  30. Temporary overnight tarping. Per square foot or unit pricing per job?
  31. Skinny Rabbit Runs on 12/12 next to dormers. Total square footage is Zilch, but difficulty factor is way up there and very time consuming.
  32. Step flashing, (baby tin), removal and re-setting or replacement.
  33. Steep pitch charge at what point does this come into play.
  34. 2 story or 3rd story charges.
  35. Degree of difficulty for close access to the home for disposal of debris.
  36. Daily take down and resetup fees to keep equipment tidy rather than leaning haphazardly on someones home.
  37. Skylight re-setting or replacement.
  38. Bay window roofs. Once again, it is small square footage, but a pain in the butt to have someone do as quickly as the same square footage on the roof.
  39. Gable returns. Very small and very much a PITA. There are all sorts of names for this architectural anomally, but I think you know what I mean.
  40. Hip and or gable roof waste factors. (Aren't roofs with valleys, the same as an inverted hip roof and requires additional waste factor calculations?
  41. Various methods of obtaining the line item for Overhead and Profit and what do they add on from various carriers?
Okay, that is a start off the top of my head. What other line items can be added to this list, that should be looked for and separately listed out for every roof done through the insurance company estimate softwares.

Ed

Ed the Roofer is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
What Is The List Of Every Line Item Possible For Roof Replacemts From Insurance Cos.? Ed the Roofer Roofing 15 08-31-2008 03:19 AM
Insurance job change order question?? kdub1777 General Discussion 8 06-14-2008 10:41 PM
Bidding insurance jobs Humble Abode Business 19 08-10-2006 06:19 AM
Shingles Nailed Above Nail Line.. Help!! Unregistered Roofing 20 04-25-2004 10:38 AM




Top of Page | View New Posts


All times are GMT -5. The time now is 06:27 AM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC