|
|
Thread Tools | Search this Thread | Display Modes |
|
|
#1 |
|
Fentoozler
Trade: Professional Pie and Pastry Taster
Join Date: May 2007
Location: New Jersey
Posts: 5,585
|
They Did What???
I arrive at a remodel job I am doing (to start the trim out) and see the "techs" from Verizon. I go inside see Mr. HO ~ he is PO'ed! He tells me these guys have been here since 10AM (it's about 3PM now)...the "supervisor" has been to the house 3-4 times..etc etc etc.
Looking at the techs(2 men), I could see why: New hardhats New toolbelts New Tools As I start wrapping up at about 6, they are just leaving. ALL they had to do was bring an OH drop to the house and mount their NID/demark. ![]() Looks good, right?...except that lower hook they used ~ it's MINE...waiting for the POCO to reconnect. ![]() I guess they couldn't decide what edge to line the boxes up with, so they shoot for "off-center". ![]() WTF??? That ain't no ground connection.
__________________
|
|
|
|
|
|
#2 |
|
DGR,IABD
Trade: Electrical; Commercial and Residential Service
Join Date: Mar 2005
Location: Central PA
Posts: 9,680
|
Re: They Did What???
Woo-hoo. Nice phone bond. Used your raceway to support their wire on the way down to the NID too.
In the words of Donald Trump, "You're fired!". That's what I'd tell those phone guys. Are services in EMT normal in your area? Never saw ne'er a one in my parts. |
|
|
|
|
|
#3 | ||
|
Fentoozler
Trade: Professional Pie and Pastry Taster
Join Date: May 2007
Location: New Jersey
Posts: 5,585
|
Re: They Did What???Quote:
MY choice was SE ...GC says "No"... next was Schd 80..GC says "No".... next was the EMT..GC says "OK" ....all that's left is RMC LOL. I'd be happy to do that too ~ for a price Quote:
- Wait for my final/service inspection and see what the EI says - Call Verizon and tell them to get their CRAP off my work...and if it isn't removed by final, I will remove it by "whatever means" Thank God, I pre-wired the interior....I can just imagine the mess if these 2 clowns were set free inside a freshly painted home ....LMAO More fun to follow when the Cable bozos arrive
__________________
Last edited by Celtic; 08-30-2007 at 08:30 PM. |
||
|
|
|
|
|
#4 |
|
Palisade Point Const.
Trade: Remodeling/Finish/Framing/Log
Join Date: Feb 2007
Location: Bozeman MT
Posts: 1,781
|
Re: They Did What???
what happened? did they miss most of the training on how to do installs, or is there even training provided?
|
|
|
|
|
|
#5 | |
|
Fentoozler
Trade: Professional Pie and Pastry Taster
Join Date: May 2007
Location: New Jersey
Posts: 5,585
|
Re: They Did What???Quote:
I have no idea ![]() I should have known the circus was in town when I saw the 2 of them moving the extension ladder ...LMAO. When I cut the service in, one of the helpers saw me grab the ext. ladder and put his hand on it ...all I said was "DON'T" ...he probably thought he was gonna get "zapped" or something ...he watched as I gracefully moved the ladder solo all over the place. Later on, I told him "Put it away". He grabbed the ladder and moved it as if he had ballet lessons
__________________
|
|
|
|
|
|
|
#6 |
|
DGR,IABD
Trade: Electrical; Commercial and Residential Service
Join Date: Mar 2005
Location: Central PA
Posts: 9,680
|
Re: They Did What???
I'd probably just cut their drop off my insulator, and leave a little FU note on the insulator. I wrote a note and stapled it up with NM staples in an apartment building mechanical room several months ago that read, "Another Mickey Mouse job by Comcast". I swear, they'll hire anyone clean-cut enough to ring a customer's doorbell, skilled or otherwise.
|
|
|
|
|
|
#7 | |
|
Fentoozler
Trade: Professional Pie and Pastry Taster
Join Date: May 2007
Location: New Jersey
Posts: 5,585
|
Re: They Did What???Quote:
It'll have to be a clean cut
__________________
|
|
|
|
|
|
|
#8 | |
|
Pro
Trade: Construction and Remodeling
Join Date: Aug 2006
Location: Pittsburgh, PA
Posts: 2,525
|
Re: They Did What???Quote:
![]() Dave |
|
|
|
|
|
|
#9 | |
|
Baltimore Electrician
Trade: Electrician
Join Date: Jan 2007
Location: Baltimore, MD
Posts: 1,249
|
Re: They Did What???
It took 8 hours for this?!?
![]() Why 2 newbies together? I guess putting each with an experienced guy makes too much sense. Some of the sloppiest work I've ever seen was by phone and/ or cable techs from Verizon and Comcast.
__________________
John from Baltimore "One Day at a Time" All replies based on the 2008 NEC Quote:
|
|
|
|
|
|
|
#10 |
|
Fentoozler
Trade: Professional Pie and Pastry Taster
Join Date: May 2007
Location: New Jersey
Posts: 5,585
|
Re: They Did What???
I'm sorry....it wasn't 8 hours....it was MORE!
![]() Stopped by at the home yesterday to drop off material. Mr. & Mrs. HO were there looking at various things (like my outlet/switch plates that are ALL being changed to Stainless Steel). The HO's inform me that the phone in the new house is NOW the same number as their old house (as planned), BUT, in the process the rocket scientists have killed the phone at their old house (same town). Seem the newbs went orange-to-white at the pole and other assorted errors. This left the HOs with NO phone(anywhere) for 10 - 12 hours. I took this opportunity to "shine" and they were happy
__________________
|
|
|
|
|
|
#11 |
|
Service & Repairs
Trade: Electrician
Join Date: Dec 2006
Location: Rahway, New Jersey
Posts: 3,998
|
Re: They Did What???
You only work half days until 6 O'clock?
![]() That was a very wise decision to go ahead and run phone and cables to each location, but will you be getting paid for that now? I'm sure you will but I just had to ask. |
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | Rate This Thread |
|
|
| Go to Page... |
