Quote:
Originally Posted by Leo G
Looks like the "Forever" job I did. What was with the green cabinets with the white crown? Who decided on that color scheme?  At leas they could have painted the crown the same color.
Everything looks great. How long were you there and what did you actually do? Build, install, GC, tile install ??
|
The "designer" decided on the "questionable" color scheme. I actually like the color, maybe it looks better in person, but I think you are right about the fact that the crown should be the cabinet color though.
There are 2 different houses in those sets of pictures. 1st house about 8000 sqft probably took 12-14 weeks including building all of the built-ins. 2nd house about 8-10 weeks.
I did all of the trim and built and installed the built-ins, no tile. I just took pictures of the tile for future ideas.
BTW Leo, I've seen many pictures from you on here and woodweb, you do awesome work too! I have to say, I'm extremly jealous of your finishing skills!
Thanks for the compliments guys!