One Of Our First Jobs

 
Thread Tools Search this Thread Display Modes
Old 03-28-2005, 01:35 AM   #1
Painting Contractor
 
Humble Abode's Avatar
 
Trade: Painting Contractor
Join Date: Mar 2005
Location: Milwaukee, WI
Posts: 1,176
Send a message via AIM to Humble Abode

One Of Our First Jobs


...as a company. We did this at the beginning of the summer last year.
Attached Thumbnails
one of our first jobs-stucco1.jpg   one of our first jobs-stucco3.jpg   one of our first jobs-stuccoafter03.jpg  

Humble Abode is offline  
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Old 03-28-2005, 09:06 AM   #2
Pro
 
George Z's Avatar
 
Trade: Painting Contractor
Join Date: Dec 2004
Location: Toronto
Posts: 1,836

Re: One Of Our First Jobs


Quote:
Originally Posted by Humble Abode
...as a company. We did this at the beginning of the summer last year.
How much spackle is enough? Just kidding!
Very nice work!
Some before and after pictures tell the story.
I bet you are going to get a lot of mileage out of these pictures.
George Z is offline  
Old 03-28-2005, 09:24 AM   #3
Pro
 
Teetorbilt's Avatar
 
Trade: Residential Contractor
Join Date: Feb 2004
Location: Jensen Beach, FL
Posts: 10,475

Re: One Of Our First Jobs


Nice job! Doesn't look like you had a whole lot to start with, mucho rot.
Teetorbilt is offline  
Old 03-28-2005, 12:15 PM   #4
Don
 
donb1959's Avatar
 
Trade: Paint Contractor
Join Date: Dec 2004
Location: Winston Salem NC
Posts: 677

Re: One Of Our First Jobs


Very nice. How did you patch those huge gapeing holes?
__________________
I fish therefore I am
http://www.shimmerz.biz
donb1959 is offline  
Old 03-28-2005, 06:37 PM   #5
Painting Contractor
 
Humble Abode's Avatar
 
Trade: Painting Contractor
Join Date: Mar 2005
Location: Milwaukee, WI
Posts: 1,176
Send a message via AIM to Humble Abode

Re: One Of Our First Jobs


Quote:
Originally Posted by donb1959
Very nice. How did you patch those huge gapeing holes?

Thanks!

We basically pulled out all the vertical boards, got rid of all the old plaster that wanted to come down, (the lathe wasn't in too bad of shape surprisingly.) keyed whatever plaster was left. Replaced the vertical boards with new ones, then just replastered the holes, I forget the exact product, some sort of exterior concrete, it took two coats.

We didn't worry too much about matching the old pattern, we did try to get as close as possible. The homeowner knew that we weren't plaster guys, she didn't care. We ended up saveing her about $1500 by not subing one of the local plaster contractors we got qoutes from. She was/is a friend of ours.

Yea I hope we do get a lot of mileage out these pictures, I have quite a few more before shots that show the damage up close. The end of this job warented a celabratory drink (or 2) at the local pub.
Humble Abode is offline  
Old 03-29-2005, 10:38 AM   #6
Don
 
donb1959's Avatar
 
Trade: Paint Contractor
Join Date: Dec 2004
Location: Winston Salem NC
Posts: 677

Re: One Of Our First Jobs


Another question. How did you traverse that roof. That's a serious pitch...what is it about 25' to the gable?
__________________
I fish therefore I am
http://www.shimmerz.biz
donb1959 is offline  
Old 03-29-2005, 11:07 AM   #7
Painting Contractor
 
Humble Abode's Avatar
 
Trade: Painting Contractor
Join Date: Mar 2005
Location: Milwaukee, WI
Posts: 1,176
Send a message via AIM to Humble Abode

Re: One Of Our First Jobs


Quote:
Originally Posted by donb1959
Another question. How did you traverse that roof. That's a serious pitch...what is it about 25' to the gable?
I think it was about 21' to 25'. we put up scafolding on the side of the building. Then nailed a level plank to the scafolding and laid it on the roof (see picture below). We then seperated one of our 24' ladders and laid the half section onto two roofers jacks. It was pretty easy to stand on the laid out ladder and plank and reach everything with a brush and trowl. In the picture you can see the jacks and plank. The scafolding was 3 teir (sp?).

I know there was probabley a better way to do this but we didn't want to blow our profit by buying a whole lot more infrastructure. I think we did pretty good with the resourses we had avaliable to us. The scafolding we borowed from my uncle, who is also my partners father.
Attached Thumbnails
one of our first jobs-stucco13.jpg  

Last edited by Humble Abode; 03-29-2005 at 11:11 AM.
Humble Abode is offline  
Old 03-29-2005, 11:53 AM   #8
Don
 
donb1959's Avatar
 
Trade: Paint Contractor
Join Date: Dec 2004
Location: Winston Salem NC
Posts: 677

Re: One Of Our First Jobs


You did very good. Thanks for the pics.
__________________
I fish therefore I am
http://www.shimmerz.biz
donb1959 is offline  
Old 03-29-2005, 01:59 PM   #9
Painting Contractor
 
Humble Abode's Avatar
 
Trade: Painting Contractor
Join Date: Mar 2005
Location: Milwaukee, WI
Posts: 1,176
Send a message via AIM to Humble Abode

Re: One Of Our First Jobs


Thank you all for the validation. :Thumbs:
Humble Abode is offline  
Old 03-30-2005, 12:56 PM   #10
Don
 
donb1959's Avatar
 
Trade: Paint Contractor
Join Date: Dec 2004
Location: Winston Salem NC
Posts: 677

Re: One Of Our First Jobs


Quote:
Originally Posted by Humble Abode
I think it was about 21' to 25'. we put up scafolding on the side of the building. Then nailed a level plank to the scafolding and laid it on the roof (see picture below). We then seperated one of our 24' ladders and laid the half section onto two roofers jacks. It was pretty easy to stand on the laid out ladder and plank and reach everything with a brush and trowl. In the picture you can see the jacks and plank. The scafolding was 3 teir (sp?).

I know there was probabley a better way to do this but we didn't want to blow our profit by buying a whole lot more infrastructure. I think we did pretty good with the resourses we had avaliable to us. The scafolding we borowed from my uncle, who is also my partners father.
Ok...still confused. What is holding the plank to the roof? I can't tell from the pic. And I still don't understand the half ladder, jack scenario.
__________________
I fish therefore I am
http://www.shimmerz.biz
donb1959 is offline  
Old 03-30-2005, 01:16 PM   #11
Painting Contractor
 
Humble Abode's Avatar
 
Trade: Painting Contractor
Join Date: Mar 2005
Location: Milwaukee, WI
Posts: 1,176
Send a message via AIM to Humble Abode

Re: One Of Our First Jobs


Quote:
Originally Posted by donb1959
Ok...still confused. What is holding the plank to the roof? I can't tell from the pic. And I still don't understand the half ladder, jack scenario.

Nothing is actually holding the plank to the roof except for pressure, but it is nailed to a firmly secured plank on the scafolding, to keep it from sliding down and out when you're standing on it.

Those blue thingies that are staggered about 3' apart are roofers jacks (I forget the proper name). They lay under the shingle and get nailed down. A 24' aluminium ladder seperates to get two 12' ladders. We took one half of a 24' extension ladder and sat two of the rungs into the roof jacks where you would usually lay a level plank for roofing. Then the ladder would lay flat on the roof and you could walk up and down it.

I wish I had taken a picture of it with the ladder up there. I hope this is a little clearer. Picture the bottom of the ladder right where the plank hits the roof and laying flat on the roof and continueing up to the top parralel with the stucco surface we were working on.
Attached Thumbnails
one of our first jobs-stucco2.jpg  
__________________
Just because some of us can read and write and do a little math, that doesn't mean we deserve to conquer the Universe. Kurt Vonnegut, (1922 - 2007) from the Novel 'Hocus Pocus'
The NAPP
Milwaukee Painting Contractor

Last edited by Humble Abode; 03-30-2005 at 01:19 PM.
Humble Abode is offline  
Old 03-30-2005, 01:21 PM   #12
Painting Contractor
 
Humble Abode's Avatar
 
Trade: Painting Contractor
Join Date: Mar 2005
Location: Milwaukee, WI
Posts: 1,176
Send a message via AIM to Humble Abode

Re: One Of Our First Jobs


LOL I'm using up all my alotted server space with this one thread. I need to get a website
__________________
Just because some of us can read and write and do a little math, that doesn't mean we deserve to conquer the Universe. Kurt Vonnegut, (1922 - 2007) from the Novel 'Hocus Pocus'
The NAPP
Milwaukee Painting Contractor
Humble Abode is offline  
Old 04-04-2005, 09:18 PM   #13
Don
 
donb1959's Avatar
 
Trade: Paint Contractor
Join Date: Dec 2004
Location: Winston Salem NC
Posts: 677

Re: One Of Our First Jobs


Ok Humble....gotcha, thanks for the clarification. :Thumbs:
__________________
I fish therefore I am
http://www.shimmerz.biz
donb1959 is offline  
Old 04-04-2005, 10:10 PM   #14
Dripless
 
Dale's Avatar
 
Trade: Painting and exterior wood care
Join Date: Aug 2004
Location: N. Wis.
Posts: 169

Re: One Of Our First Jobs


That third "panel" still looks like quite a stretch.
Dale is offline  
Old 04-04-2005, 10:34 PM   #15
Back from the dead...
 
ProWallGuy's Avatar
 
Trade: Paperhanger/Painter
Join Date: Oct 2003
Location: St. Louis, MO
Posts: 6,544

Re: One Of Our First Jobs


All I can say is Thank God we don't do exteriors. :Thumbs:
ProWallGuy is offline  
Old 04-06-2005, 01:45 AM   #16
Painting Contractor
 
Humble Abode's Avatar
 
Trade: Painting Contractor
Join Date: Mar 2005
Location: Milwaukee, WI
Posts: 1,176
Send a message via AIM to Humble Abode

Re: One Of Our First Jobs


Quote:
Originally Posted by ProWallGuy
All I can say is Thank God we don't do exteriors.
I love exteriors. I have been looking foward to getting back on our ladders all winter
__________________
Just because some of us can read and write and do a little math, that doesn't mean we deserve to conquer the Universe. Kurt Vonnegut, (1922 - 2007) from the Novel 'Hocus Pocus'
The NAPP
Milwaukee Painting Contractor

Last edited by Humble Abode; 04-06-2005 at 01:47 AM.
Humble Abode is offline  
Old 04-06-2005, 02:03 AM   #17
Pro
 
Teetorbilt's Avatar
 
Trade: Residential Contractor
Join Date: Feb 2004
Location: Jensen Beach, FL
Posts: 10,475

Re: One Of Our First Jobs


Exteriors may rule up north. I prefer to work once the A/C is operational.
__________________
You can't solve you're problems with the same level of thinking that created the problems.

Albert Einstein
Teetorbilt is offline  
Old 04-06-2005, 07:50 PM   #18
Painting Contractor
 
Humble Abode's Avatar
 
Trade: Painting Contractor
Join Date: Mar 2005
Location: Milwaukee, WI
Posts: 1,176
Send a message via AIM to Humble Abode

Re: One Of Our First Jobs


Quote:
Originally Posted by Teetorbilt
Exteriors may rule up north. I prefer to work once the A/C is operational.

I can understand that. It gets warm up here during the summer but nothing like the temperatures you guys in the south have to deal with. I would want to work inside too.
__________________
Just because some of us can read and write and do a little math, that doesn't mean we deserve to conquer the Universe. Kurt Vonnegut, (1922 - 2007) from the Novel 'Hocus Pocus'
The NAPP
Milwaukee Painting Contractor
Humble Abode is offline  
Old 04-06-2005, 11:08 PM   #19
Pro
 
Teetorbilt's Avatar
 
Trade: Residential Contractor
Join Date: Feb 2004
Location: Jensen Beach, FL
Posts: 10,475

Re: One Of Our First Jobs


When I started, as a one man band, I grabbed everything. Here that means rot. Soffits, facia and shingle mould mostly. It only took a few months in the summer to figure out that I needed to do something else. Nothing like being hot, sweaty and covered with 30 yrs. of dead insect parts (and a few live ones) to make you reconsider your business plan. LOL
__________________
You can't solve you're problems with the same level of thinking that created the problems.

Albert Einstein
Teetorbilt is offline  
Old 07-14-2006, 09:30 PM   #20
Registered User
 
Yury's Avatar
 
Trade: General
Join Date: Jul 2006
Location: Miami, FL
Posts: 2

Re: One Of Our First Jobs


Impressive.
Yury is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Way's to pick up flooring jobs.. GridRunnerFloor Flooring 15 10-23-2010 06:45 PM
Where to bid jobs ButlerDesigns Business 20 07-19-2010 11:51 AM
How do you price jobs? johnny_b01 Business 11 08-05-2007 10:58 PM
Small Jobs linkster01 Business 13 06-30-2006 09:52 AM
Getting Service Jobs gravtyklz Electrical 6 03-06-2006 06:11 PM

Join Now... It's Fast and FREE!

Privacy Badge
I am a professional contractor
I am a DIY Homeowner
ContractorTalk.com is for
PROFESSIONAL CONTRACTORS ONLY!

At ContractorTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?