 |
08-26-2009, 06:29 AM
|
#1
|
|
Remodeler
Trade:
Remodel
Join Date: Mar 2005
Location: Vermont
Posts: 100
|
Firestops
Hallo -
On one of my jobs I am doing a basment conversion just for storage. It is below grade, typical cement block foundation. I am framing a secondary wall just inside the paramter, basically just "framing" to hang the drywall to pretty the space up a bit.
My question is, while I wait for the framing inspection, will he make me put in firestops?
Since the wall only has sheerock on one side I am not creating any chimney effects, which the firestop is meant to counter act.
What do you guys think? Will he make me put the stops in anyway although they serve absolutely no pupose?
Thanks .........
__________________
... factor it in and move on ...
|
|
|
Warning: The topics covered on this site include activities in which there exists the potential for serious injury
or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!
Join the #1 Contractor Forum Today - It's Totally Free!
ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!
Join ContractorTalk.com - Click Here

|
08-26-2009, 07:23 AM
|
#2
|
|
demo master
Trade:
Remodeling General Contractor
Join Date: Aug 2006
Location: Denver Colorado
Posts: 1,459
|
yes he will make you draftstop behind the top plate to concrete wall, if there aere any soffitts at the soffitt level is where you would draftstop.
|
|
|
08-26-2009, 02:01 PM
|
#3
|
|
Framer
Trade:
framing/remodeling
Join Date: Feb 2005
Location: NE Ohio
Posts: 1,001
|
Best way to do the top plate firestop is to snap your line for your playe, leaving maybe 1/2 to 1 inch clear. Cut a rip of plywood 4 inches wide and nail it up first, sliding it til it touches the block wall. Then nail up your 2x4 plate to the line. Won't matter that the plwood is short of the line, its only there to close up the gap behind the top plate.
|
|
|
|
The Following User Says Thank You to Warren For This Useful Post:
|
|
08-26-2009, 03:01 PM
|
#4
|
|
Pro
Trade:
Remodeling general
Join Date: Feb 2009
Location: Annapolis Md
Posts: 1,514
|
Quote:
Originally Posted by Warren
Best way to do the top plate firestop is to snap your line for your playe, leaving maybe 1/2 to 1 inch clear. Cut a rip of plywood 4 inches wide and nail it up first, sliding it til it touches the block wall. Then nail up your 2x4 plate to the line. Won't matter that the plwood is short of the line, its only there to close up the gap behind the top plate.
|
5/8" drywall works also and a little cheaper than plywood. done the same way
|
|
|
08-26-2009, 04:56 PM
|
#5
|
|
demo master
Trade:
Remodeling General Contractor
Join Date: Aug 2006
Location: Denver Colorado
Posts: 1,459
|
just got done today with a basement bath draftstop and I like to use un faced insualtion and foam it in.
|
|
|
08-26-2009, 04:58 PM
|
#6
|
|
Pro
Trade:
Framing
Join Date: Jan 2009
Location: Utica,NY
Posts: 522
|
Quote:
Originally Posted by kevjob
just got done today with a basement bath draftstop and I like to use un faced insualtion and foam it in.
|

They don't let us do that around here
|
|
|
08-26-2009, 09:43 PM
|
#7
|
|
Pro
Trade:
framer
Join Date: Jul 2009
Location: columbus, OH
Posts: 177
|
Here either, because fire blocking is part of the framing inspection. But Kev's inspectors are ahead of the curve because insulation is supposed to be inflammable.
__________________
What would you say...ya do here?
|
|
|
08-26-2009, 09:54 PM
|
#8
|
|
Pro
Trade:
Remodeling
Join Date: Oct 2007
Location: Northwest Connecticut
Posts: 1,136
|
They do make a firestop insulation that some Inspectors will allow,since it is used commercially for rated walls/ceilings.
__________________
There is no warranty, expressed or implied, as to the accuracy, reliability or completeness of furnished data.Information gathered here may be for the sole purpose of entertainment.
|
|
|
08-27-2009, 06:43 AM
|
#9
|
|
Remodeler
Trade:
Remodel
Join Date: Mar 2005
Location: Vermont
Posts: 100
|
thanks for all the replies guys .... in reading my initial post I realized I forgot to mention one important item: my secondary wall in set some 10" away from the foundation because we installed a perimeter drainage system. So there is all this open space behind my interior wall. I enclose a sketch.
Sorry for that
Thanks again ....
__________________
... factor it in and move on ...
Last edited by Vermonster; 08-27-2009 at 06:47 AM.
|
|
|
08-27-2009, 08:33 PM
|
#10
|
|
Pro
Trade:
framer
Join Date: Jul 2009
Location: columbus, OH
Posts: 177
|
Outstanding sketch. So you've got like what... 10" of open space between the foundation and the new frame? I hope that was done for amusement's sake.
__________________
What would you say...ya do here?
|
|
|
08-28-2009, 06:20 AM
|
#11
|
|
Remodeler
Trade:
Remodel
Join Date: Mar 2005
Location: Vermont
Posts: 100
|
Mcc ......... I believe my previous post explains it ...........
Anyway I had the inspection yesterday. He treated the entire space between the new wall and foundation as one space that needs firestops. He's ok with using 1/2 sheetrock which I had on site already.
Thanks ......
__________________
... factor it in and move on ...
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate This Thread |
Linear Mode
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|