Old 09-29-2009, 03:30 PM   #41
Pro
 
genecarp's Avatar
 
Trade: LI,NY designer, new homes, renovation work, concre
Join Date: Mar 2008
Location: Long Island, NY
Posts: 5,426

Re: Average Time For Kitchen Remodels?


Quote:
Originally Posted by Mike Finley View Post
Hindsight is 20/20.

You thought this guy was great, he's a turd.

Now you know you are an absolute terrible judge of character.

Next time hire a reputable company. Pony up the extra money it costs to have a professional do the work, along which comes a warranty in writing and no excuses.

References, BBB membership, portfolio of work, copies of insurance... etc... any of that sound good now?

You get what you pay for, tattoo it on your arm and look at it every day.

Always remember T&M is a suckers game. It's the favorite method of all hacks. Now you know why.

Bottom line, you know it, we all know it, you got seduced by trying to get a deal and got bent over by a professional hack. You play with fire and sometimes you get burned.

Damn Mike, i am going to suggest that Nathan adds a THANKS AGAIN button. This whole thread should be titled-( The business of the Clueless)

__________________
genecarp is offline  
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Old 09-29-2009, 03:36 PM   #42
Its all ball bearings
 
angus242's Avatar
 
Trade: Tile
Join Date: Oct 2007
Location: Will County, Illinois
Posts: 16,789

Re: Average Time For Kitchen Remodels?


Jesus already.....

THIS IS WHY WRITTEN CONTRACTS AND PERMITS ARE NECESSARY.


This was the wrong guy to do the job, regardless of licensing. How do I know this? Because YOU told me so:
"The best is when I told him about a crooked tile and he told me that the tile spacers go in and that all you can do, the tile goes where it goes! Or when he ran ten gage wire for a 50 amp circuit."
You said you don't think the job needed permits. Well my friend, if he's running 10GA for 50 AMP circuit, that requires a permit. And permits are there to make sure the correct gauge wire is run for each circuit....and to make sure there are enough circuits in the first place. See the correlation?

Bottom line is the guy isn't qualified to do a lot of what he did, but your aunt allowed him to do the work. So I see the choices as this:
* It was agreed to have an unqualified out of work contractor perform a kitchen remodel. PAY HIM!
* Don't pay him what was verbally agreed on and burn that bridge. How you can justify reasonable payment after the fact is beyond me. It was already agreed that he would do the work hourly at $35. If there was an issue with his work ethics, that should have been brought up before, not afterward.

Lesson learned?????????????????????????????
__________________
Angus
L+M+O+P=Chttp://www.millan.net/minimations/smileys/einstein3.gif
"Promise only what you can deliver. Then deliver more than you promise"
angus242 is offline  
Old 09-29-2009, 04:07 PM   #43
I like Green things
 
WarnerConstInc.'s Avatar
 
Trade: Custom Carpentry Services
Join Date: Jan 2008
Location: In a van, down by the river. Auburn, IN
Posts: 11,688

Re: Average Time For Kitchen Remodels?


40 hours to install cabinets?

Damn, did you hire a tortise?
__________________
Quote:
Originally Posted by Leo G View Post
Thanks for that tidbit of information Darcy.
Warner Remodeling ll Auburn Indiana Remodeling ll Dekalb County Remodeling ll Custom Woodworking Auburn Indiana
Warner Remodeling Facebook
WarnerConstInc. is offline  
Old 09-29-2009, 04:08 PM   #44
Pro
 
genecarp's Avatar
 
Trade: LI,NY designer, new homes, renovation work, concre
Join Date: Mar 2008
Location: Long Island, NY
Posts: 5,426

Re: Average Time For Kitchen Remodels?


Quote:
Originally Posted by WarnerConstInc. View Post
40 hours to install cabinets?

Damn, did you hire a tortise?

Maybe the walls where not plumb-----maybe the corners where not squareG
__________________
genecarp is offline  
Old 09-29-2009, 04:10 PM   #45
Illusion of Perfection
 
CookeCarpentry's Avatar
 
Trade: Carpenter
Join Date: Feb 2009
Location: Douglassville, PA
Posts: 2,619

Re: Average Time For Kitchen Remodels?


Quote:
Originally Posted by WarnerConstInc. View Post
40 hours to install cabinets?

Damn, did you hire a tortise?
Maybe he made them himself, after felling the trees and milling and drying all the lumber.
CookeCarpentry is offline  
Old 09-29-2009, 04:25 PM   #46
Its all ball bearings
 
angus242's Avatar
 
Trade: Tile
Join Date: Oct 2007
Location: Will County, Illinois
Posts: 16,789

Re: Average Time For Kitchen Remodels?


Maybe the guy is a hack
__________________
Angus
L+M+O+P=Chttp://www.millan.net/minimations/smileys/einstein3.gif
"Promise only what you can deliver. Then deliver more than you promise"
angus242 is offline  
Old 09-29-2009, 04:57 PM   #47
bathroom guru
 
jarvis design's Avatar
 
Trade: Bathroom Design Build Contractor
Join Date: May 2008
Location: London, Ontario, Canada
Posts: 1,146

Re: Average Time For Kitchen Remodels?


The last person I would hire for a remodel would be some union hack who is collecting unemployment. Want to do him a big favor, call uncle sam and report his earnings, cause he probably won't!

My first question when hiring new guys - do you or did you belong to a union??
__________________
Bathrooms Built for Life.
www.JarvisDesignBuild.com
519-495-4062
jarvis design is offline  
Old 09-29-2009, 05:35 PM   #48
Back from the dead...
 
ProWallGuy's Avatar
 
Trade: Paperhanger/Painter
Join Date: Oct 2003
Location: St. Louis, MO
Posts: 6,544

Re: Average Time For Kitchen Remodels?


ProWallGuy is offline  
Old 09-29-2009, 07:00 PM   #49
Sean
 
SLSTech's Avatar
 
Trade: General Contractor
Join Date: Sep 2008
Location: Cullman, AL
Posts: 4,515
Send a message via Skype™ to SLSTech

Re: Average Time For Kitchen Remodels?


Quote:
Originally Posted by ProWallGuy View Post
But yet it's still open
SLSTech is offline  
Old 09-29-2009, 07:28 PM   #50
Member
 
jeremy-lvhm's Avatar
 
Trade: HVACR
Join Date: Sep 2009
Location: PA
Posts: 66

Re: Average Time For Kitchen Remodels?


Quote:
Originally Posted by bwalley View Post
You should have requested a daily log from the guy listing what he did each day and how many hours he had put in.

I asked for this log last week. He JUST called my aunt with the hours tonight but only read them to her. Now when I talked to him last he said he keeps all his hours in a notebook and showed me a new one that he must have just started. Said the other one was at HOME. Why does it take a week to come up with hours unless he was cooking some up?
jeremy-lvhm is offline  
Old 09-29-2009, 07:32 PM   #51
Pro
 
samccard's Avatar
 
Trade: Property Preservation and Remodeling.
Join Date: Aug 2007
Location: Ga.
Posts: 100

Re: Average Time For Kitchen Remodels?


Keep in mind "He is drawing unemployment" wonder why?
samccard is offline  
Old 09-29-2009, 07:36 PM   #52
Member
 
jeremy-lvhm's Avatar
 
Trade: HVACR
Join Date: Sep 2009
Location: PA
Posts: 66

Re: Average Time For Kitchen Remodels?


Quote:
Originally Posted by CookeCarpentry View Post
So you knew he was registered but couldn't take checks in the company name? To me, that would indicate he was not registered.

Swapping out receptacles (no new wiring) usually does not require a permit in PA. Moving water lines and DWV does require a permit.

The PA HIC registration does not cover electrical, plumbing, hvac.

Your numbers seem off in most categories for labor (low).

Bottom line is you hired a guy who turned out to be a hack, now you want to beat him over the head for payment. You are just as guilty as he is. How can you be in the business (HVAC trade) and not know the value of a good contractor, a good contract, warranty, etc, etc.
Ok let me reiterate on the plumbing. How about just replacing valves. Two sink valves and I moved the laundry room bib. I didnt just fall off the banana boat. And NOWHERE does anyone require permits for replacing receptacles. If you have a malfunctioning receptacle you have to go down to the city and pull a permit. Give me a break.

And if you want to put me down why dont we talk about it face to face. It's easy to be tough over a computer.
jeremy-lvhm is offline  
Old 09-29-2009, 07:37 PM   #53
Member
 
jeremy-lvhm's Avatar
 
Trade: HVACR
Join Date: Sep 2009
Location: PA
Posts: 66

Re: Average Time For Kitchen Remodels?


Quote:
Originally Posted by samccard View Post
Keep in mind "He is drawing unemployment" wonder why?

Now now. We all know that with unions it doesnt matter how good you are. Just what your number is.

Although the carpenters union in our area has been hit hard because they are overpaid loads.
jeremy-lvhm is offline  
Old 09-29-2009, 07:39 PM   #54
Back from the dead...
 
ProWallGuy's Avatar
 
Trade: Paperhanger/Painter
Join Date: Oct 2003
Location: St. Louis, MO
Posts: 6,544

Re: Average Time For Kitchen Remodels?


Quote:
Originally Posted by jeremy-lvhm View Post

And if you want to put me down why dont we talk about it face to face. It's easy to be tough over a computer.
Ain't no one putting you down, or talking tough. Its just that the truth hurts, but it will set you free.
ProWallGuy is offline  
The Following User Says Thank You to ProWallGuy For This Useful Post:
CookeCarpentry (09-29-2009)
Old 09-29-2009, 07:40 PM   #55
Member
 
jeremy-lvhm's Avatar
 
Trade: HVACR
Join Date: Sep 2009
Location: PA
Posts: 66

Re: Average Time For Kitchen Remodels?


Quote:
Originally Posted by genecarp View Post
Damn Mike, i am going to suggest that Nathan adds a THANKS AGAIN button. This whole thread should be titled-( The business of the Clueless)
You know what. If you dont have anything to help with in the thread why dont you shut your pie hole. The main probelm with half of these forums is everyone is a damn know it all yet can never seem to answer the actual question asked without diverting into everything else. I am SURE everything and every decision you make is perfect without fault!!!

Do you walk on water too? hole
jeremy-lvhm is offline  
The Following User Says Thank You to jeremy-lvhm For This Useful Post:
genecarp (09-29-2009)
Old 09-29-2009, 07:42 PM   #56
Member
 
jeremy-lvhm's Avatar
 
Trade: HVACR
Join Date: Sep 2009
Location: PA
Posts: 66

Re: Average Time For Kitchen Remodels?


Quote:
Originally Posted by ProWallGuy View Post
Ain't no one putting you down, or talking tough. Its just that the truth hurts, but it will set you free.
Oh your a great moderator. Stick up for the punks

when someone questions my business ability according to what they think is proper I consider that a putdown.
jeremy-lvhm is offline  
Old 09-29-2009, 07:47 PM   #57
Its all ball bearings
 
angus242's Avatar
 
Trade: Tile
Join Date: Oct 2007
Location: Will County, Illinois
Posts: 16,789

Re: Average Time For Kitchen Remodels?


Jeremy,

I was trying to be nice about this. But now you're attacking some of the members here. No one called YOU a hack, just the guy that performed the work. Lighten up!

SO...

The problem with these forums isn't everyone is a damn know it all yet can never seem to answer the actual question. The problem is guys posting stories about unqualified "contractors" performing shoddy work and then trying to defend it.
__________________
Angus
L+M+O+P=Chttp://www.millan.net/minimations/smileys/einstein3.gif
"Promise only what you can deliver. Then deliver more than you promise"
angus242 is offline  
The Following User Says Thank You to angus242 For This Useful Post:
CookeCarpentry (09-29-2009)
Old 09-29-2009, 07:53 PM   #58
Sean
 
SLSTech's Avatar
 
Trade: General Contractor
Join Date: Sep 2008
Location: Cullman, AL
Posts: 4,515
Send a message via Skype™ to SLSTech

Re: Average Time For Kitchen Remodels?


Jeremy - sorry but you are the one acting like a punk now.

If you are not questioning your business acumen by now you should be. You wrote down so many red flags it is unbelievable. Then you basically excuse all the BS, flagrant evasion of the laws, etc... and wonder why you got shafted. If my business was located up there, simply based off this thread, I would never consider letting you sub a job from me.

Oh as a quick side note, Gene does walk on water compared to your "Contractor"
SLSTech is offline  
Old 09-29-2009, 07:55 PM   #59
Pro
 
rselectric1's Avatar
 
Trade: Licensed Electrical Contractor and Remodeler
Join Date: Sep 2009
Location: Chicago Suburbs
Posts: 7,018

Re: Average Time For Kitchen Remodels?


Standard kitchen remodel including full gutting, minor structural changes, change of cabinet configuration and related mechanicals, etc. from demo day to close should be in the neighborhood of 6-7 weeks for a full time contractor with full time subs.
AS STATED BY POSTERS ABOVE-every job is unique and this is only an average.

I'm guessing from the "union" hint, that this guy is a specialist in one trade only. I am also guessing that you are also in the trades. I am also guessing that this guy couldn't provide references as a GC that were verifiable, and if he did you didn't check them out. I am also guessing that there was no permit on this job, and I am also guessing that if all the above is true, you may have been better qualified to GC the job yourself.
Don't worry, most everyone has fallen for a line or two and assumed that just because someone is good at one trade and says they have run jobs that they can GC a job.
But honestly, he is making you look bad but I'm sure you know that.
__________________
220...221...whatever it takes!
rselectric1 is offline  
Old 09-29-2009, 07:55 PM   #60
Maker of fine kindling
 
Gus Dering's Avatar
 
Trade: cabinet maker
Join Date: Oct 2008
Location: Santa Rosa CA
Posts: 4,755
Send a message via Yahoo to Gus Dering

Re: Average Time For Kitchen Remodels?


I just scanned through this thread so forgive me if this has been clearly stated. Maybe someone can give me a post # if it has.

Has there been a clear list of the scope of work this guy did for the 300 some hours?

How many feet of cabinet?

List the facts so I can help.
__________________
Every parent who has walked barefoot into their child's room late at night hates Legos
Gus Dering is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Cedar Deck Sealer - Ready Seal vs One Time LLCaruso Decks & Fencing 5 10-07-2009 08:20 PM
What's your average customer sale? jbogs1 Marketing & Sales 13 06-10-2009 09:53 PM
Real Time Rendering KentWhitten Technology 5 06-10-2009 07:18 AM
Nickel and dime? In tough economic time? poole_3 General Discussion 29 04-16-2009 02:30 AM
Top 5 projects you now have time for--business building ChrWright Business 1 08-17-2008 04:45 PM

Join Now... It's Fast and FREE!

Privacy Badge
I am a professional contractor
I am a DIY Homeowner
ContractorTalk.com is for
PROFESSIONAL CONTRACTORS ONLY!

At ContractorTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?