Contractor Talk - Construction and Remodeling Site
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Contractor Talk - Professional Construction and Remodeling Forum > Business Discussion > Technology

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 03-08-2004, 11:07 PM   #1
stop botherin' me!
 
Grumpy's Avatar
Trade: Roofing Siding Gutters Windows
 
Join Date: Oct 2003
Location: Chicago
Posts: 7,666
Send a message via AIM to Grumpy
computer and math geeks, read please

Many of you know I use excel to estimate my projects. As a roofer we always charge more for a steeper slope. My spreadsheet has been suprisingly accurate for an average size house, though the formula used is totally flawed in theory. I realized this when trying to plug in a mansard roof.

In any case here is what I am trying to do:

a 12/12 roof is quite steep I'd like to add $25 per square, but at the same time a 18/12 is very steep, in which case I'd like to add $75 per square.

Ok so here's how I'd like it to work and keep knocking my head against the wall. In one field I enter the pitch (1-24) The math forumla computes based on the pitch variable and outputs an upcharge to the total price. The problem I am having is finding some common ground with the formula. I spent an hour inputting as many different formulas as I could think of.

Those of you who don't know what I am talking about can download the spreadhseet http://bestexteriors.com/pricing.xls

__________________
-Grumpy
Chicago Gutters Chicago Roofing
Grumpy is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 05-01-2005, 05:34 PM   #2
Repair/Remodeling Tech.
 
jproffer's Avatar
Trade: Repair and Remodeling Services
 
Join Date: Feb 2005
Location: Chester, IL
Posts: 597
hey Grumpy, sorry I'm about a year late looking thru the old stuff here, but what about using a table with the various pitches and a V-LOOKUP to find your upcharge. Then if you decide $25 isnt enough, just change each pitch to whatever upcharge you want.

If you're unfamiliar with V-lookups and such, it's kinda hard to explain but easy to do. I can make up a little something for you and email it to you if you want.
jproffer is offline   Reply With Quote
Old 05-01-2005, 06:54 PM   #3
General Contractor
 
hatchet's Avatar
Trade: General Contractor
 
Join Date: Oct 2003
Location: Montana - where I belong.
Posts: 1,035
Geesh - I missed this one too.
You could easily enough have it check the slope cell. if slope < 12 - x ; if 12 < slope < 18 - x+25 ; else if slope > 18 - x+75; i.e. a couple if statements.
Grumpy probably already has it figured out
__________________
Rich
WIT Construction Co.
Superior MT Contractor
hatchet is offline   Reply With Quote
Old 05-01-2005, 09:38 PM   #4
Repair/Remodeling Tech.
 
jproffer's Avatar
Trade: Repair and Remodeling Services
 
Join Date: Feb 2005
Location: Chester, IL
Posts: 597
probably so...a year later..lol...sorry grump...hatchet your way would work too....i was thinking more like the following:

Slope.....Upcharge
1..............0
2..............0
3..............0
4..............0
and so on to 11
12............25
13............25
14............25
up to 17
18............75
19............75
to 24

then lookup the slope value from cell(whatever cell), and add the corresponding upcharge to the base price per square.

If statement would work too, little harder to change later on, say if you want to change your 18 criteria to 16 or 14, or $75 to $100...but it would work just as well or better if you don't plan on that happening. However works for the user, go for it.
jproffer is offline   Reply With Quote
Old 05-02-2005, 08:35 AM   #5
General Contractor
 
hatchet's Avatar
Trade: General Contractor
 
Join Date: Oct 2003
Location: Montana - where I belong.
Posts: 1,035
True.. more difficult to update but you could have it pull the slope min/max and the upcharges from a configuration page. I've done my estimating sheet like that.
I'll have to look at vlookup - haven't worked with that yet
__________________
Rich
WIT Construction Co.
Superior MT Contractor
hatchet is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Top of Page | View New Posts


All times are GMT -5. The time now is 09:11 AM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC