How is the way you people deal with a customer who keeps telling you the price?
I have a customer who I started a small job off on contract, had a couple of minor additions no big deal. He then wants more work done so I write up a new contract for the next stage. I get the feeling he is going to neg the price so I add on a bit to my proper price and sure enough he starts to bargin. After some back and forth I lower my price back to where it should be. Then a 3rd set of work comes up a long list of small and big things electric plumbing demo drywall etc etc. We end up changing the scope of the work time after time after time. Ususally with him thinking he is only going to pay $6000 for $10,000 worth of work. In the meantime contract one is complete the second contract is held up due to additions of work mostly electric. I lined up a sparky to do all the electric, the plumbing is to be done by the ho plumber. Now for 2 weeks I have altered the contract with addon's subtrations, removing work adding work. basically all work has stalled I have wasted day after day because I will not do any new work without a signed contract. I probally have 20 hours in contract revisions alone now. Since the work have been splintered again it will actually cost even more than if we did all the work under one contract. I want to walk away but I cannot unless he releases me from contract 2 and he is not going to do that because he thinks I have not done enough work to cover payments. I worked out the time and even with not including the estimate time travel time metting time he owes me over $200 at this point. I also do not want to leave things the way they are because contract 2 has minor drywall work to be completed and I cannot close the walls up because there is a bunch of non agreeed to electric work that has to be done and if I close the wall up new holes will need to be punched into the wall to run the electric. I have given long detailed list of work for each contract but I do not break down it into individual prices. HE will then take that list send it back to me with his break down of hours and to top it off not include enough time to do the work will not include the material to complete the work. Every time I have to take an example and tell him he is missing hours and material to complete the job it seems to sink in but then we go back to square one. HE has even gone as far to suggest that because I live in a area of town where the average price is $800,000 I should be cheaper then the contractors in his area cause the avg price is $1.5 million. He also suggested that I should not be charging $50 and he should only be paying $35, because the economy is down. HOw do I deal with this guy I have tried many differnet approaches suggestions excuse the spelling grammer run on sentances I am heading out the door to meet this PITA |
|
|
|
|
|
#2 |
|
I'm a Mac
Trade: ICF Construction
Join Date: Apr 2007
Location: Hog Town
Posts: 3,266
|
Re: PITA Customer Telling Me What To Charge
Since you cannot come to an agreement on price/terms finish contract 2 and be done, he can hire someone else to open the drywall again and patch again.
or Send him a note saying he has requested additional items which neither of you can agree on, tell once done to notify you so you can finish your work Personally I like scenario 1 best because there is an end in site, scenario 2 is God knows when. Stand firm and tall, he's the customer, not your boss
__________________
Chris |
|
|
|
|
|
#3 |
|
You did what??
Trade: Carpenter
Join Date: Dec 2005
Location: North of Atlanta
Posts: 6,601
|
Re: PITA Customer Telling Me What To Charge
Too bad...you let him take the reins, which is a big no-no. Once you start lowering the price of your work (without changing the scope of the work) you screwed yourself (even if you "built-in" some fluff). That set the tone for the rest of your relationship with the client.
Betchya won't do it again....hopefully. Good luck. |
|
|
|
|
|
#4 | |
|
Pompass Ass
Trade: Certified Building and Certified A/C Contractor
Join Date: Jan 2009
Location: Plant City, Florida
Posts: 2,090
|
Re: PITA Customer Telling Me What To ChargeQuote:
is this client an accountant? |
|
|
|
|
|
|
#5 |
|
You did what??
Trade: Carpenter
Join Date: Dec 2005
Location: North of Atlanta
Posts: 6,601
|
Re: PITA Customer Telling Me What To Charge
Another thought...I've charged a $150 change order fee, stated in our contract...makes people think a little bit more about making changes. Don't mind doing them, but they're gonna cost just like everything should.
|
|
|
|
| The Following User Says Thank You to J F For This Useful Post: | Meetre (07-16-2009) |
|
|
#6 |
|
Custom Stuff
Trade: General Contractor - Custom Renovations
Join Date: Jan 2008
Location: Manassas, VA
Posts: 859
|
Re: PITA Customer Telling Me What To Charge
I think I would tell him that the price you give him is your price. If he doesn't like it, he can look for someone else at that lower price. Unfortunately, you have allowed this joker to get one step ahead of you and now you have to undo that. You played the negotiating game and thought you won.
Next time he tears apart your estimate, you should agree with him that your price is higher than he would like to pay but that the price is what you need to operate your business properly and profitably. If he still wants to 'negotiate', ask him what he would like to cut out of the scope or wish him well with the next contractor. Also, don't let him hold your existing contract hostage; get the work done now and let him worry about the 'fix' for other work later.
__________________
__________________________________________________ ___________ I EXPECT THAT SOMEDAY I WILL SEE THE FRUITS OF MY LABOR. IS IT SOMEDAY YET? ![]() Clifton, Great Falls, McLean, Fairfax Station, Manassas, Virginia Renovation Contractor |
|
|
|
| The Following User Says Thank You to Mike(VA) For This Useful Post: | bwalley (07-16-2009) |
|
|
#7 |
|
You did what??
Trade: Carpenter
Join Date: Dec 2005
Location: North of Atlanta
Posts: 6,601
|
Re: PITA Customer Telling Me What To Charge
And keep asking him what his budget is for any changes...
then laugh hysterically when he tells you
|
|
|
|
|
|
#8 |
|
Registered User
Trade: General contractor
Join Date: Jul 2009
Location: Iowa City, Iowa
Posts: 8
|
Re: PITA Customer Telling Me What To Charge
I agree I would finish contract 2 and be done. If the wiring is a saftey issue and you cannot in good consience cover it up , just let it go get paid everything except the patch and move on. This guy isn't going to give you any referral work anyway, and why would you want to work for him again? As Kenny Rogers said in a song. "You have to know when to walk away, and know when to run" Sounds like it's time to run to me.
Just a thought for next time. Don't write another contract. Use a written and signed change order to ammend the contract. Don't do any additional work until the dollar amount is aggreed to, signed and dated. It should be very specific and also list the revised overall contract price. I call for change orders to be paid in full at the next draw in the contract schedule. Let us know how it turns out. |
|
|
|
|
|
#9 |
|
Pro
Trade: general
Join Date: Sep 2007
Posts: 107
|
Re: PITA Customer Telling Me What To Charge
Ya I understand I F$$$up by letting him get his way.
But it has worked out met with him we split up the cantract again. I added in extra for time and effort. Basically told him to sign the contract at that price or we are done With only half the extra work being done I ended up charging him for 80% of what it would have cost to do everything on the list.
|
|
|
|
|
|
#10 | |
|
Pro
Trade: General Contractor
Join Date: Dec 2006
Location: NC
Posts: 473
|
Re: PITA Customer Telling Me What To ChargeQuote:
|
|
|
|
|
|
|
#11 | |
|
Pro
Trade: General Contractor
Join Date: Dec 2006
Location: NC
Posts: 473
|
Re: PITA Customer Telling Me What To ChargeQuote:
|
|
|
|
|
|
|
#12 |
|
The Duke
Trade: Cabinet Maker
Join Date: Mar 2006
Location: Portland, Maine
Posts: 10,101
|
Re: PITA Customer Telling Me What To Charge
You lost control. It's over.
__________________
If you correct your mind, the rest of your life will fall into place ~Lao Tzu Custom Cabinetry - Portland, Cape Elizabeth, Scarborough, Kennebunkport, Yarmouth, Falmouth, Cumberland, Ogunquit, Maine Salmon Falls Cabinetry |
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Customer cancels a contract...what are their rights? | Easy_rhyno | General Discussion | 80 | 02-01-2011 09:52 AM |
| Customer List Database | pcplumber | File Swap | 2 | 10-07-2009 10:33 PM |
| Customer Issue | ArmstrCarpentry | General Discussion | 21 | 07-15-2009 08:09 PM |