I Need A Itemized "construction Schedule" For A Residential House

 
Thread Tools Search this Thread Display Modes
Old 10-05-2008, 07:16 PM   #1
Pro
 
kdub1777's Avatar
 
Trade: Builder
Join Date: Apr 2006
Posts: 110

I Need A Itemized "construction Schedule" For A Residential House


Any body have an in depth itemized construction schedule handy? I'm a little computer illiterate and would think someone out there has something real handy typed up in a great little spreadsheet or something??

Thanks

kdub1777 is offline  
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Old 10-05-2008, 07:51 PM   #2
Pro
 
GregS's Avatar
 
Trade: Low Voltage
Join Date: Oct 2006
Location: Burlington, Ontario
Posts: 1,330

Re: I Need A Itemized "construction Schedule" For A Residential House


Have you built a house before?

Write down all the steps needed to do that and how long each one should take. Consult the trades you use by giving them the plans and ask them how long it would take for their respective jobs in order to rough-in and complete.

There's your schedule.

This is not going to be the same for every house.
GregS is offline  
Old 10-05-2008, 07:56 PM   #3
Pro
 
BMAN's Avatar
 
Trade: Painting & Remodeling
Join Date: Aug 2006
Location: Rochester, NY
Posts: 468

Re: I Need A Itemized "construction Schedule" For A Residential House


http://www.b4ubuild.com/resources/schedule/6kproj.shtml
BMAN is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Spraying house while wife is pregnant plumberman Pest Control 20 12-17-2010 09:22 PM
Question on Residential Brick Veneer Tommy C Masonry 12 09-14-2008 08:29 PM
Simple (custom residential) wood cabinet spec ??? akm Finish Carpentry 4 08-28-2008 09:50 PM
panel in guest house veer Electrical 15 08-10-2008 05:42 PM
finishing house exterior lionhntr Carpentry 3 03-19-2007 11:13 AM

Join Now... It's Fast and FREE!

Privacy Badge
I am a professional contractor
I am a DIY Homeowner
ContractorTalk.com is for
PROFESSIONAL CONTRACTORS ONLY!

At ContractorTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?