HO cancels check for Final Payment

Hey Guys,
Been a while since I've been here but need opinions on a couple things.
First,
I presented the HO an itemized bill for final payment on a project.
It included ; Total payments received,and a Balance due.
He looks at the bill,writes me a check for the balance and I leave.
A half hour later he calls me saying ,we have to talk!!!.Since he called on my cell while I was on the road I waited for a spot to pull over and check for a message.
Ten minutes later he calls again saying he is going to cancel payment on the check and spews out some incoherent reasoning for his decision.
Can he legally get away with this?

Second,
Since the HO decides he has paid too much for the work completed(after he paid the total), I wanted opinions about this project being in the Ballpark price wise?
It's a 400 sq/ft addition.We did the framing,roofing,siding,interior trim.We used TJI joists and it's 2x6 exterior walls.Material costs were about $20,000,my cost was $42,000 with all the material from foundation up,less the finish floors,sheet rock and electrical and plumbing.
We had to tie this into his existing log cabin ranch and cut a 6' opening into the house.Also had to tie into the existing roof and continue the porch roof(separate roof line) over to meet the new roof.

Total job costs came to $105.00 sq/ft and this includes a T&G Red Cedar Vaulted ceiling.
I'll try and post a couple of pics ;
Attached Images
  

__________________
There is no warranty, expressed or implied, as to the accuracy, reliability or completeness of furnished data.Information gathered here may be for the sole purpose of entertainment.
oldfrt is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 01-21-2009, 07:43 PM   #2
Steve
 
OCRS's Avatar
Trade: Residential Renovations
 
Join Date: Apr 2008
Location: Sarsfield, Ontario, Canada
Posts: 761
Contract?
OCRS is offline   Reply With Quote
Old 01-21-2009, 07:57 PM   #3
Pro
Trade: seamless gutters
 
Join Date: Dec 2007
Location: new hampshire
Posts: 655
I think we are missing something here.
What were the excuses or reasons he spurted out?

ALSO WHO CARES IF YOU ARE IN THE BALLPARK HE ACCEPTED YOUR PRICE AND TOLD YOU TO DO THE JOB.
__________________
www.nlseamlessgutters.com
nlgutters is offline   Reply With Quote
Old 01-21-2009, 08:04 PM   #4
Pro
 
oldfrt's Avatar
Trade: Remodeling
 
Join Date: Oct 2007
Location: Northwest Connecticut
Posts: 1,136
The contract was verbal,as we had just finished building a 3-bay garage for him and he was up in the air about how he wanted to design the addition.
Since we had no problem with him on the garage,all extra's were compensated for after a verbal agreement on any changes,we felt comfortable enough to continue to work for him with a verbal contract.
I gave him a ball park figure of $40,000 for the addition,+/- the cost on number and brand of windows.
After that discussion,he added the cedar ceiling and misc. repairs to the exisiting house.

My point is since he saw the final price,and wrote me a check for that amount,doesn't this show an acceptance of the costs for work done?
__________________
There is no warranty, expressed or implied, as to the accuracy, reliability or completeness of furnished data.Information gathered here may be for the sole purpose of entertainment.
oldfrt is offline   Reply With Quote
Old 01-21-2009, 08:06 PM   #5
Professiona Instigator
 
rbsremodeling's Avatar
Trade: Design Build Remodeling Contractor Washington, DC
 
Join Date: Nov 2007
Location: Washington, DC/ Maryland
Posts: 6,546
Quote:
Originally Posted by oldfrt View Post
The contract was verbal,as we had just finished building a 3-bay garage for him and he was up in the air about how he wanted to design the addition.
Since we had no problem with him on the garage,all extra's were compensated for after a verbal agreement on any changes,we felt comfortable enough to continue to work for him with a verbal contract.
I gave him a ball park figure of $40,000 for the addition,+/- the cost on number and brand of windows.
After that discussion,he added the cedar ceiling and misc. repairs to the exisiting house.

My point is since he saw the final price,and wrote me a check for that amount,doesn't this show an acceptance of the costs for work done?

Yes. But it will cost you 40K to prove it in court

There are a few good post around here about filing liens and other means of collecting you money. By a 6 pack of beer and kick back and read some of them lost of good info
rbsremodeling is offline   Reply With Quote
Old 01-21-2009, 08:10 PM   #6
Pro
 
oldfrt's Avatar
Trade: Remodeling
 
Join Date: Oct 2007
Location: Northwest Connecticut
Posts: 1,136
Quote:
Originally Posted by nlgutters View Post
I think we are missing something here.
What were the excuses or reasons he spurted out?

ALSO WHO CARES IF YOU ARE IN THE BALLPARK HE ACCEPTED YOUR PRICE AND TOLD YOU TO DO THE JOB.
His excuses ranged from it costing more than a 3-bay garage we just built for him (1500sq/ft ,2deep car bays and a mobile home bay,with a second floor loft.
We didn't work on his schedule.
The total finished addition,with sheetrock elec,foundation etc was more than he wanted to spend.
And his wife is unhappy with the costs
__________________
There is no warranty, expressed or implied, as to the accuracy, reliability or completeness of furnished data.Information gathered here may be for the sole purpose of entertainment.
oldfrt is offline   Reply With Quote
Old 01-21-2009, 08:18 PM   #7
Member
Trade: general contractor
 
Join Date: Nov 2007
Location: East Bay, CA
Posts: 51
Not sure about Connecticut but in CA you'd have a hard time collecting without a contract - ALWAYS HAVE EVERYTHING IN WRITING, including additions/changes & make sure it's signed & dated - not only protects you but the homeowner as well. Sorry but sounds like he knew what he was doing, better check w/an attorney.
CA Contractor is offline   Reply With Quote
Old 01-21-2009, 08:20 PM   #8
Pro
 
oldfrt's Avatar
Trade: Remodeling
 
Join Date: Oct 2007
Location: Northwest Connecticut
Posts: 1,136
Quote:
Originally Posted by rbsremodeling View Post
Yes. But it will cost you 40K to prove it in court

There are a few good post around here about filing liens and other means of collecting you money. By a 6 pack of beer and kick back and read some of them lost of good info
Next time I pay for a new car with a check,I'll rush over to the bank and put a stop payment on the check after I drive it off the lot.
Legally,it seems like a pretty quick judgement,but I don't want to take it there.
I've tried to explain all my costs to the HO and have an open discussion going with him.I just hope he sees that he agreed to the price and his own lack of diligence about what he was spending got him to this final pissy fit.
__________________
There is no warranty, expressed or implied, as to the accuracy, reliability or completeness of furnished data.Information gathered here may be for the sole purpose of entertainment.
oldfrt is offline   Reply With Quote
Old 01-21-2009, 08:20 PM   #9
Pro
Trade: sun rooms and room additions
 
Join Date: Dec 2006
Location: Indiana
Posts: 179
Looks like a fantastic addition, and the price is very much in line with a lot of the rooms our company has built. Everyone has a little buyer's remorse, and he just didn't have enough information about what he is paying for.. the buyer's remorse kicked in after you left with his check.

Don't jump to conclusions about what he can do and can't do legally. After all, he told you he wants to talk. That sounds like an invitation for you to do some selling after the fact. He just wants to understand what he is paying for and justify the cost.

Sit down with the gentleman and lay your cards on the table. Your rates are fair, you protected him through the job with insurance, you used your expertise to assure quality and prompt completion of the work. He didn't say he would not pay you, he said he wanted to talk.

Just do a little selling. Good Luck!
Bill Z is offline   Reply With Quote
Old 01-21-2009, 08:21 PM   #10
Steve
 
OCRS's Avatar
Trade: Residential Renovations
 
Join Date: Apr 2008
Location: Sarsfield, Ontario, Canada
Posts: 761
Quote:
Originally Posted by oldfrt View Post
His excuses ranged from it costing more than a 3-bay garage we just built for him (1500sq/ft ,2deep car bays and a mobile home bay,with a second floor loft.
We didn't work on his schedule.
The total finished addition,with sheetrock elec,foundation etc was more than he wanted to spend.
And his wife is unhappy with the costs
And now he wants you to pay for it. Do like RBS suggested and read about threatening court proceedings.
OCRS is offline   Reply With Quote
Old 01-21-2009, 08:23 PM   #11
Pro
Trade: seamless gutters
 
Join Date: Dec 2007
Location: new hampshire
Posts: 655
You said you told him 40k +/- and he agreed to do the job.
Now he and his wife say it's too much?
__________________
www.nlseamlessgutters.com
nlgutters is offline   Reply With Quote
Old 01-21-2009, 08:25 PM   #12
Pro
 
Greg Di's Avatar
Trade: Remodeling & Decks
 
Join Date: Mar 2005
Location: Bergen County, NJ
Posts: 1,747
Not for anything, but how the f**k is anyone doing a $40,000 job without a written contract? Seriously. This is precisely the reason why people look to take advantage of contractors--because they can.

You are doing no one, including the client, any favors by not putting things in writing.

Reading these types of posts disgusts me.

I hope you get your money, but man-o-man.
Greg Di is online now   Reply With Quote
Old 01-21-2009, 08:25 PM   #13
Pro
Trade: Roofing Contractor
 
Join Date: Dec 2006
Location: NW Suburbs of Chicago
Posts: 6,705
I think, if I remember correctly, that you have mentioned in the past, or actually even bragged about how and why you didn't use or need written contracts.

If I am wrong about that being you, please excuse me and my memory.

But, this is a prime example of nothing to show in writing that was agreed to.

Do you have ANYTHING AT ALL in writing that is signed about changes in the scope?

It would "SEEM", since he wrote you the check, that the amount was agreed to and acceptable to him, but now you have to spend money to prove that point.

Ed
Ed the Roofer is offline   Reply With Quote
Old 01-21-2009, 08:26 PM   #14
Pro
Trade: seamless gutters
 
Join Date: Dec 2007
Location: new hampshire
Posts: 655
Quote:
Originally Posted by oldfrt View Post
Next time I pay for a new car with a check,I'll rush over to the bank and put a stop payment on the check after I drive it off the lot.
Legally,it seems like a pretty quick judgement,but I don't want to take it there.
I've tried to explain all my costs to the HO and have an open discussion going with him.I just hope he sees that he agreed to the price and his own lack of diligence about what he was spending got him to this final pissy fit.

I don't think you realize the diffrence here. When you buy a car they have the price on a CONTRACT which you sign first before they get a check from you.
__________________
www.nlseamlessgutters.com
nlgutters is offline   Reply With Quote
Old 01-21-2009, 08:27 PM   #15
Pro
 
oldfrt's Avatar
Trade: Remodeling
 
Join Date: Oct 2007
Location: Northwest Connecticut
Posts: 1,136
Quote:
Originally Posted by Bill Z View Post
Looks like a fantastic addition, and the price is very much in line with a lot of the rooms our company has built. Everyone has a little buyer's remorse, and he just didn't have enough information about what he is paying for.. the buyer's remorse kicked in after you left with his check.

Don't jump to conclusions about what he can do and can't do legally. After all, he told you he wants to talk. That sounds like an invitation for you to do some selling after the fact. He just wants to understand what he is paying for and justify the cost.

Sit down with the gentleman and lay your cards on the table. Your rates are fair, you protected him through the job with insurance, you used your expertise to assure quality and prompt completion of the work. He didn't say he would not pay you, he said he wanted to talk.

Just do a little selling. Good Luck!
Yea,
I did the selling thing with him after his second call and he seemed to settle down a bit.I left it with a promise to check my material and labor costs again.He's trying to compare his extra large garage to a small finished room and doesn't see the differences.
__________________
There is no warranty, expressed or implied, as to the accuracy, reliability or completeness of furnished data.Information gathered here may be for the sole purpose of entertainment.
oldfrt is offline   Reply With Quote
Old 01-21-2009, 08:35 PM   #16
Sean
 
SLSTech's Avatar
Trade: General Contractor
 
Join Date: Sep 2008
Location: Cullman, AL
Posts: 3,418
Send a message via Skype™ to SLSTech
I would make a copy of the check & then deposit the check - you have just been forewarned that it might not clear. If it doesn't clear & was truly canceled, then you need to figure out your options & talk to a lawyer. You will end up filling a lien & if the amount is small enough you will probably end up going through small claims court. While a written contract is the best thing to have, a verbal contract is still valid.
SLSTech is offline   Reply With Quote
Old 01-21-2009, 08:35 PM   #17
Pro
Trade: sun rooms and room additions
 
Join Date: Dec 2006
Location: Indiana
Posts: 179
At least he will have a little time to grow accustomed to the price while you are "checking" your costs. You may want to return with some good documentation or he'll be expecting a cut in the price.

He sounds emotional and when his logical side wakes up, he'll realize his mistake, and yours, was not getting everything in writing up front. He's already had the meal, too late to go back. Attorneys will cost you both more than it's worth, in dollars, headaches and lost time.
Bill Z is offline   Reply With Quote
Old 01-21-2009, 08:36 PM   #18
Pro
 
oldfrt's Avatar
Trade: Remodeling
 
Join Date: Oct 2007
Location: Northwest Connecticut
Posts: 1,136
Quote:
Originally Posted by Ed the Roofer View Post
I think, if I remember correctly, that you have mentioned in the past, or actually even bragged about how and why you didn't use or need written contracts.

If I am wrong about that being you, please excuse me and my memory.

But, this is a prime example of nothing to show in writing that was agreed to.

Do you have ANYTHING AT ALL in writing that is signed about changes in the scope?

It would "SEEM", since he wrote you the check, that the amount was agreed to and acceptable to him, but now you have to spend money to prove that point.

Ed
Ed,
I do use written contracts,and I did on his first project,but his indecision on how he wanted to complete the addition kept me from getting it in writing,
He was in a hurry for us to get started and I had to draw up plans three times before we had the final design,thus the +/- on the verbal.
I'll admit I let this one slip by me by not getting it in writing,but three weeks before we finished .I gave him a progress report on where we stood financially,and what the final cost should be.
He accepted it and the final costs were actually lower than my report.
__________________
There is no warranty, expressed or implied, as to the accuracy, reliability or completeness of furnished data.Information gathered here may be for the sole purpose of entertainment.
oldfrt is offline   Reply With Quote
Old 01-21-2009, 08:38 PM   #19
Pro
Trade: Roofing Contractor
 
Join Date: Dec 2006
Location: NW Suburbs of Chicago
Posts: 6,705
You need to read that one thread that Dirt Diggler started.

Even something written a a napkin that you blew your nose in would be better than what you do now.

How in the Heck can ANYONE be do fricking naive or actually just Plain Old Dumb?

I wouldn't do a $ 400.00 dollar job without SOMETHING in writing, let alone a $ 40,000.00 job.

I am not trying to roast your azz, but come on, WTF were you thinking?

If you believe that nothing bad will ever happen to you financially, and there will NEVER be any misunderstandings, why don't you just go to the casino instead?

That is some nice and valuable work you did and I hope you get paid every penny you have coming, but please finally learn something from this experience.

Are you trying to skate under the radar by not having any paper trails?

Ed
Ed the Roofer is offline   Reply With Quote
Old 01-21-2009, 08:39 PM   #20
Pro
 
oldfrt's Avatar
Trade: Remodeling
 
Join Date: Oct 2007
Location: Northwest Connecticut
Posts: 1,136
Quote:
Originally Posted by SLSTech View Post
I would make a copy of the check & then deposit the check - you have just been forewarned that it might not clear. If it doesn't clear & was truly canceled, then you need to figure out your options & talk to a lawyer. You will end up filling a lien & if the amount is small enough you will probably end up going through small claims court. While a written contract is the best thing to have, a verbal contract is still valid.
I deposited the check right after he paid me and before I got his calls. I have been working out of town and couldn't get to a bank for about a week.
__________________
There is no warranty, expressed or implied, as to the accuracy, reliability or completeness of furnished data.Information gathered here may be for the sole purpose of entertainment.
oldfrt is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Non Payment problem involving Insurance job?? Very long but need feedback! kdub1777 General Discussion 21 12-22-2008 09:18 AM
Collecting Overdue Payment - Internationally...Help Bluepenguin Business 11 08-21-2008 01:43 PM
Customer Stopped Payment on Check HJConstruction Business 15 04-20-2008 02:27 AM
Embarrasing, but I gotta tell ya - CHECK IMAGES TigerFan Business 26 10-06-2007 11:26 AM