Old 06-24-2009, 10:49 AM   #1
Registered User
Trade: Home Remodeling
 
Join Date: Feb 2008
Posts: 1
Billing customer for job development hours?

Hi all, I have a question for you.

We do much of our work on a time & materials basis, and are generally very open with our customers about how much time we spent on their job. We will even provide a breakdown of hours by work performed, straight off our carpenters' time sheets, if they ask for it. Usually this helps us justify the cost of our work and it's been a good thing for us.

Recently we had a customer request such a breakdown, and he was surprised to learn that we had billed him for job development time - hours the GC spent meeting with the client, working up plans for his job, ordering materials, and so on. He is now throwing a hissy fit about it, saying he shouldn't have to pay for those things.

My question is: Obviously that kind of work needs to happen. But it's kind of a grey area - it's job-specific work so it makes sense to bill it to the customer in a way. But it usually happens off-site, back in the office, so the customer doesn't see it happening. So in a way it's like overhead. Seems obvious that the two ways to deal with this are to simply bill for those hours like we've been doing, same as on-site work, or you can just call it overhead and correspondingly raise your rates enough to cover that additional overhead cost. Which approach are other people using?

greenbean is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 06-24-2009, 11:19 AM   #2
LRG WoodCrafting
 
Leo G's Avatar
Trade: Professional Sawdust Producer
 
Join Date: May 2005
Location: USA, Connecticut
Posts: 5,079
Nothing gray about it. It is part of getting the job done. It needs to be billed out. Pose a question to him, when he is sitting in a meeting and mostly just listening to what is going on, but really not getting any work done. Does he expect to get paid for those hours? He wasn't producing anything. He was just there. Why should he get paid if something isn't getting done.

At least you are working on his job. It is a necessary part of the construction. It has to get done and it cannot be done without it happening. It has value. Therefore it needs to be assessed a price. And if it is work being done on his project it is only fair that he pay for it. Why should anyone work for free.
__________________
Measure Twice Cut Once -- It's a lot easier to cut more off then it is to cut MORON.
Quote:
Originally Posted by HusqyPro View Post
Carpenter by day.
Mad scientist by night.
http://lrgwood.com
Leo G is offline   Reply With Quote
The Following User Says Thank You to Leo G For This Useful Post:
Meetre (06-26-2009)
Old 06-24-2009, 01:11 PM   #3
J F
where did everybody go?
 
J F's Avatar
Trade: Remodeler
 
Join Date: Dec 2005
Location: North of Atlanta
Posts: 3,619
Quote:
Originally Posted by Leo G View Post
Nothing gray about it. It is part of getting the job done. It needs to be billed out. Pose a question to him, when he is sitting in a meeting and mostly just listening to what is going on, but really not getting any work done. Does he expect to get paid for those hours? He wasn't producing anything. He was just there. Why should he get paid if something isn't getting done.

At least you are working on his job. It is a necessary part of the construction. It has to get done and it cannot be done without it happening. It has value. Therefore it needs to be assessed a price. And if it is work being done on his project it is only fair that he pay for it. Why should anyone work for free.
It's what waaaay too many consumers expect....starting with "free" estimates
J F is offline   Reply With Quote
The Following User Says Thank You to J F For This Useful Post:
fez-head (06-26-2009)
Old 06-24-2009, 01:34 PM   #4
Estimator, Engineer
 
Aggie67's Avatar
Trade: Mechanical, Structural
 
Join Date: Aug 2008
Location: New Jersey
Posts: 468
It is a recoverable cost. Whether you cover that cost in your labor rate markup or you bill it by the hour, either way it is legit. We cover it in our labor rate, so my salary (overhead) is covered in the rate we charge.

With that said, a conversation with them before the job started would have gone a long way in making sure it didn't become an issue.
Aggie67 is offline   Reply With Quote
Old 06-24-2009, 01:38 PM   #5
Pro
Trade: Consultant
 
Join Date: May 2005
Location: Holly Springs, GA
Posts: 1,011
Like you said- either it gets billed by the hour, or the cost gets put into OH, resulting in a higher hourly rate. Gotta get stuff like that into the contract up front though, since it's kinda tough to go back now and say "ohh, the carpenters are now at $55/hour instead of $45. Opps."
Bob Kovacs is offline   Reply With Quote
Old 06-24-2009, 08:33 PM   #6
Pro
Trade: Low Voltage
 
Join Date: Oct 2006
Location: Burlington, Ontario
Posts: 1,233
Does your client complain to his lawyer too when they itemize everything down to the number of pages photocopied?

Wish I could do things with that amount of detail, but the accounting costs would far outweight the amount collected.. Oh wait, I can charge for that too!
BuildingHomes is offline   Reply With Quote
Old 06-24-2009, 09:11 PM   #7
Pro
Trade: Custom Modular builder
 
Join Date: Nov 2008
Location: Denver, CO
Posts: 153
This is hard - you spend all that time - then you don't get the job? I am working with 2 architects ( young I might add ) they really like my ideas and organization - then ask for a detailed bid - no specs - and then I find out that contractor 2 knows more than I do and our pricing doesn't compare.

I asked politely - would they do free drawings - let me bid a job off free drawings - then if I like the drawings and the job goes through - I might pay them. They didn't understand.

I , of course spent 2 - 3 days on their bid - (really probably teaching them how we are detailed in our bidding). They asked about specific items and I said where did these come from. The other contractor knew what cabinets and appliances , lighting etc. and we didn't ( we put in our standard stuff )

I would like to be in early and act as a consultant - getting paid to bid and outline the specs.

Terry
modterry is offline   Reply With Quote
Old 06-24-2009, 09:24 PM   #8
Pro
Trade: Electrical Contractor
 
Join Date: Nov 2007
Location: Northern Illinois
Posts: 583
Quote:
Originally Posted by greenbean View Post
Recently we had a customer request such a breakdown, and he was surprised to learn that we had billed him for job development time - hours the GC spent meeting with the client, working up plans for his job, ordering materials, and so on. He is now throwing a hissy fit about it, saying he shouldn't have to pay for those things.

Which approach are other people using?
One of the downsides of T&M is that there can be confusion regarding what time is being billed and what the material markup is. A contract usually details the price for work and the scope of the project.

Shouldn't the T&M agreement also clarify the details?

It seems like a simple list of what time is going to be billed should be written in an agreement as well as the material markup, as well as the usual terms and conditions. I wonder if it isn't paperwork laziness or an expectation of mutual trust that would lead someone to say "I charge $50 per hour", watch for a nod from the client and then start buying and installing materials.

One of the downsides of T&M IMO is the itemization/breakdown and the questioning of items. I know this isn't a T&M vs. contracts but it simplified my life to switch to contract-only.

Now if I take a break or talk with a client for 1/2 hour or take a long lunch it's never an issue about the time I took. If I make an extra two trips for materials it's not an issue.

Basically IMO it's a problem of clarity in the original agreement.
__________________
www.TigerElectrical.com
Tiger is offline   Reply With Quote
Old 06-24-2009, 09:50 PM   #9
Lack Of All Trades
 
Darwin's Avatar
Trade: Professional handyman services
 
Join Date: Apr 2009
Location: Southeast Michigan
Posts: 988
Auto service stations will charge a $68 diagnostic fee to look at your car. This is in place, simply so the consumer will not waste the technician's time. There is no included 'waste-my-time' hours. Charge for that.
__________________
Darwin is offline   Reply With Quote
The Following User Says Thank You to Darwin For This Useful Post:
fez-head (06-26-2009)
Old 06-26-2009, 08:05 AM   #10
Member
Trade: carpentry
 
Join Date: Sep 2008
Location: breckenridge co
Posts: 98
I keep track of hours I spend preparing for a job, it's pretty easy, if the job is t&m I make it clear that I will charge them for those hours when it looks like the job is mine. Never does the customer get to touch those worksheets until they have paid for them.

I give people I haven't worked with before two numbers time and material. Simple. It may turn them off but you have to protect your time invested. I tell them I'll be happy to sit down and explain how I came up with those numbers. I used to give customers a nice detailed break down of how long each step should take and a nice list of materials. Thinking that would prove to them I know what I'm talking about.

instead they pass that info onto their brother in law or some other idiot who claims to be a contractor and under cut me. They go down to home depot with all my info and do the job for me. I just lost 3-6 hrs of my time.
fast fred is offline   Reply With Quote
Old 06-26-2009, 03:54 PM   #11
JimmyS
Trade: General contractor
 
Join Date: May 2009
Location: Mass
Posts: 63
agree

I agree with Leo. "Job development time" makes it sound a little like marketing or self-promotion, but the tasks you described are job-specific.
When you bill T&M, don't your bills show each cost line by line? Enter costs that relate to the specific job as billable to that job, and bill them.
Design, meetings, ordering materials - all for him alone. First job meeting, preliminary estimate - maybe not billable, depends how you run your business. Post those to your overhead accounts so they don't get billed out.
And yup, tell the customer ahead of time that you're going to bill him for time you worked on his job. I also agree with Tiger that contract work makes for many fewer problems of this sort.
Jim
jimmys is offline   Reply With Quote
Old 06-26-2009, 08:38 PM   #12
Moderator
 
Double-A's Avatar
Trade: GC - Remodeling Specialists
 
Join Date: Jul 2006
Location: Arkansas
Posts: 4,476
Send a message via ICQ to Double-A
The work that you did off-site was job specific. Putting it into overhead is not perfectly correct. You can take last years numbers for this work and break it down to how much is spent per dollar sold and bill every client the same way as a part of overhead, but again, its job specific.

The client pays for everything. How you get them to pay is where your business acumen comes in. How you present this to the client and get them to buy into the fact that they are gonna pay for every single aspect of their work is what will make or break your company.
__________________
"My clients’ wishes are the center of my attention." -- David Guido, a contractor in Woodstock, N.Y.
New York Times, July 20, 2006
Double-A is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Customer has an interesting request... duckdown General Discussion 45 01-13-2009 06:17 AM
How many sales are you throwing away? pcplumber Business 41 01-04-2009 01:10 PM
Got a customer from an online lead - any future referrals? Mike Bosch Online Leads Services 4 12-13-2008 12:50 AM
Billing hours jpplumbing Plumbing 11 11-07-2006 02:25 AM