Re: 203k Hell


Okay been there done that, you WILL HAVE a final inspection buy lender and IF the scope of work is not done then there is NO final payment. Even if the money was used for "other" items you will lose final payment. The roof leak should not be a problem, there should be a % above your estimates for "unforseens". Now you "CAN" make changes BUT the bottom dollar does not change you have to do change orders and they have to be signed by both partys and sent to lender and put on file. Good luck we have finish two and let me tell you HELLLLLL no never again I will go to Wal Mart and get a job first hahahahaah

Roberts Ren is offline  
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Old 10-29-2009, 08:05 PM   #22
I like Green things
 
WarnerConstInc.'s Avatar
 
Trade: Custom Carpentry Services
Join Date: Jan 2008
Location: In a van, down by the river. Auburn, IN
Posts: 11,675

Re: 203k Hell


203k work sounds like a huge PIA. I like customers that have their own money in their checking account.
__________________
Quote:
Originally Posted by Leo G View Post
Thanks for that tidbit of information Darcy.
Warner Remodeling ll Auburn Indiana Remodeling ll Dekalb County Remodeling ll Custom Woodworking Auburn Indiana
Warner Remodeling Facebook
WarnerConstInc. is offline  
Old 10-30-2009, 06:54 AM   #23
Pro
 
mikec's Avatar
 
Trade: remodeling contractor
Join Date: Jan 2007
Location: Connecticut
Posts: 573

Re: 203k Hell


Quote:
Originally Posted by WarnerConstInc. View Post
203k work sounds like a huge PIA. I like customers that have their own money in their checking account.
Some are not bad, some are pita.
But the customers with there own money are much better.
mikec is offline  
Old 12-24-2010, 09:06 AM   #24
203k Consultant
 
Garrett1605's Avatar
 
Trade: 203k Construction Consultant
Join Date: Dec 2010
Location: Atlanta Ga
Posts: 2
Send a message via Skype™ to Garrett1605

Re: 203k Hell


You might want to talk to the lender. They can control her better than you can.
Garrett1605 is offline  
Old 12-24-2010, 09:18 AM   #25
Pro
 
TxElectrician's Avatar
 
Trade: Electrical
Join Date: May 2008
Location: Central Texas
Posts: 1,087

Re: 203k Hell


Quote:
Originally Posted by Garrett1605 View Post
You might want to talk to the lender. They can control her better than you can.

YOU may want to check the date of the OP
TxElectrician is offline  
Old 01-21-2011, 02:27 PM   #26
Registered User
 
PTP's Avatar
 
Trade: Home Improvement
Join Date: Jan 2011
Location: Maryland
Posts: 4

Re: 203k Hell


This sounds more like an FHA Streamline loan. The HO gets 50% up front and then 50% at closing. The check is a two party check and her bank should not let her cash or deposit it because your company is on it. In other words she should be signing it over to you.
The entire scope does need to be completed. If she is going to finace the windows MAKE sure it is completed before you finish your work, otherwise you may not be paid the alotted amount for the windows!!
Also, check with the Lender to see if there is a Contingency amount. Typically, there is an extra 10% in escrow. This is not always the case for a Streamline but it is mandatory for a 203k. I consult on these loans so feel free to ask me anything.
PTP is offline  
Old 01-21-2011, 03:06 PM   #27
Pro
 
aptpupil's Avatar
 
Trade: Handyman
Join Date: Jun 2010
Location: oakland, ca
Posts: 719

Re: 203k Hell


curious how this one turned out...mike?
aptpupil is offline  
Old 01-22-2011, 11:54 AM   #28
Pro
 
mikec's Avatar
 
Trade: remodeling contractor
Join Date: Jan 2007
Location: Connecticut
Posts: 573

Re: 203k Hell


Well, heres how it turned out.

First 203k consultant, let me say. The lender is on the side of the HO always and forever, and so is the FHA.

So we had everything done except putting in cabinets. Very straight forward. Literally ten feet of lowers with a laminate top, and eight feet of uppers. Exact layout that was there. Cheap off the shelf cabs.

Well miss new homeowner keeps bitching and moaning about what the cabinets will look like. I explained to her that the are natural oak, raised panel doors, just like the sample.

One day she calls, and asks how much do the cabs cost? I ask why, and she goes on to tell me about this place she found where the cabs are cheap, and she get nicer ones.

Finally I give in (mistake). I tell her she has X amount to purchase cabinets. Go there, pick them out, and I will go order them. But it has to be the same layout as I scoped.

Ok, she calls the next day to tell me the cabs are ordered. "What?"
"I ordered them they will be in right after xmas." Now I am leary.

Day after xmas she calls, the cabs are there, you can go install them. I go up there, and she has over twice the amount of cabs, crown molding, and a note saying "installer please build a six inch base to put base cabs on.
She's a very tall woman.

I call her and tell her that with all the xtra work she has, that the install price will more than double. She freaks out. So I leave.

Later on I call the bank. I tell the draw administrator the situation. She is shocked. She tells me that the woman is violation of her contract with me, the bank, and HUD. She calls the HO while I am on hold. When she comes back she tells me basically the woman is crazy, and not fear I will be paid for what I have done, if the time frame expires before the cabs are in.

However she says, the woman can fire me inwriting, and the bank would pay out for work completed. SHe goes on to tell me that it is in my best interest to work this out with the HO.

I call the HO the next day. She has a friend who will put in the cabs by the end of the week, we get the draw, and I get paid. I agree.

Well a month later after several calls to her, they aren't done with the the cabs. The timeframe for the 203k is coming to an end. I call the bank again.
Get the same draw administrator on the phone. I say hi, remember me, I called before about the ___ job?

She says "yes I remember, and I will tell you the same thing now, I did then. I can not talk to you about the loan. We work for the HO.

"What? But last time you told me about how......"

"I told you nothing! You need to call the hO."

So, I think someone got in trouble for talking to me the first time.

At the end of it I got paid. The HO finished the cabs, and got the check around March 20th.

She was way beyond her deadline with the bank. The bank didn't care, they never made her get an extension, they never came out, and paid for what was already done.

With a 203k you will always get paid no matter what, but it can take a while.
mikec is offline  
The Following User Says Thank You to mikec For This Useful Post:
aptpupil (01-24-2011)
Old 01-22-2011, 09:22 PM   #29
Registered User
 
PTP's Avatar
 
Trade: Home Improvement
Join Date: Jan 2011
Location: Maryland
Posts: 4

Re: 203k Hell


That is definitely good to hear you were paid! With a 203k (not an FHA streamline) The Consultant usually) or at least should) let the HO know that as stated in the initial write up everything is based on medium grade and if she chooses to upgrade or change the layout it must be in the contract prior to settlement...glad yours finally worked out. If you ever run into another one let me know and I can assist you prior to the loan closing.
PTP is offline  
Old 01-22-2011, 10:50 PM   #30
The Remodeler
 
Splinter's Avatar
 
Trade: Home Remodeler
Join Date: Apr 2005
Location: Long Island, NY
Posts: 940

Re: 203k Hell


Mike, I dont mean to sound harsh or rude, but what is so hard about telling the homeowner, "This is the contract and scope of work you signed with me, and was approved by those actually paying for it. (the bank) There cannot be any changes now that the checks have been written."

If the homeowner is using their own cash to fund a project, I have no problem doing what it takes to give them what they want.... When a third party is involved that can keep my money, I'll do what was agreed on so I get paid.
__________________
- Alex

Long Island Remodeling Contractor
Splinter is offline  
Old 01-23-2011, 06:33 AM   #31
Pro
 
mikec's Avatar
 
Trade: remodeling contractor
Join Date: Jan 2007
Location: Connecticut
Posts: 573

Re: 203k Hell


Quote:
Originally Posted by Splinter View Post
Mike, I dont mean to sound harsh or rude, but what is so hard about telling the homeowner, "This is the contract and scope of work you signed with me, and was approved by those actually paying for it. (the bank) There cannot be any changes now that the checks have been written."

If the homeowner is using their own cash to fund a project, I have no problem doing what it takes to give them what they want.... When a third party is involved that can keep my money, I'll do what was agreed on so I get paid.

You are absolutley right. And it is what I should have done. And what I will always do in the future.
mikec is offline  
The Following User Says Thank You to mikec For This Useful Post:
Splinter (01-23-2011)
Old 01-23-2011, 09:23 PM   #32
Registered User
 
203kconsultant's Avatar
 
Trade: 203K Contractor/Home Builder/Remodeler
Join Date: Jan 2011
Location: Ridgeland, MS
Posts: 5
Question

Re: 203k Hell


Was this a streamline K? (cost of repairs less than $35,000)
Was there a consultant involved in the transaction as all?
Did anyone ever mention a consultant during the bidding?

gs
203kconsultant is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
203k mikec Business 0 09-22-2009 07:08 PM
Accounting = hell, does it have to be so? Bluepenguin Business 21 07-14-2009 04:26 PM
How the hell do some contractors stay in business?? Brickie Masonry 18 02-20-2009 08:46 PM
Had a convo with a "new builder" this morning.. I am mad as hell nEighter General Discussion 16 02-07-2009 01:55 PM
Hell Explained! Hammatime Off Topic (Non Trade) 5 10-11-2006 08:17 AM

Join Now... It's Fast and FREE!

Privacy Badge
I am a professional contractor
I am a DIY Homeowner
ContractorTalk.com is for
PROFESSIONAL CONTRACTORS ONLY!

At ContractorTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?