Contractor Talk - Construction and Remodeling Site
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Contractor Talk - Professional Construction and Remodeling Forum > Trade Talk > Roofing

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 08-31-2009, 01:08 PM   #1
JTW
Member
Trade: GC
 
Join Date: Jan 2009
Location: Coastal NH
Posts: 72
How would you deal with this?

Ok, check out the picture, this is on my own house, I will be doing the shingling on this one myself as times have been a little tough for everyone. I will be using Landmark TL's, so weaving is not a good option and I think this looks like (explative)......, was thinking a cut valley as this is the technique I will be using on the rest of the house? Of course the back of the house creates just the oppositte problem, a small hip that I think the shingles will be able to form too or might I be better off running H/R down over the bend(not sure this would look best), it is an odd spot!
Attached Thumbnails
how-would-you-deal-img00003-20090828-1455.jpg   how-would-you-deal-img00099.jpg  

JTW is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 08-31-2009, 01:44 PM   #2
Pro
Trade: roofing,siding,gutters,windows
 
Join Date: Jan 2009
Location: VIRGINIA
Posts: 231
You gotta treat it like a valley. Actually two valleys. If you're doing a closed valley, be sure to run the middle section first.
__________________
www.clarkroofingandsiding.com
outlaw is offline   Reply With Quote
Old 08-31-2009, 02:07 PM   #3
Pro
Trade: Roofing & Siding Contractor
 
Join Date: Mar 2007
Posts: 378
That hurts my eyes
J-Peffer is offline   Reply With Quote
Old 08-31-2009, 02:12 PM   #4
Pro
Trade: Framing
 
Join Date: Jan 2009
Location: Utica,NY
Posts: 521
Quote:
Originally Posted by J-Peffer View Post
That hurts my eyes
Mine also!
Framer53 is offline   Reply With Quote
Old 08-31-2009, 02:12 PM   #5
Pro
Trade: Framing
 
Join Date: Jan 2009
Location: Utica,NY
Posts: 521
Not to insult you, but did you do that work?
Framer53 is offline   Reply With Quote
Old 08-31-2009, 04:04 PM   #6
JTW
Member
Trade: GC
 
Join Date: Jan 2009
Location: Coastal NH
Posts: 72
None taken, But if I did that would I be asking what to do with it? We are done the interior and now working exterior. Bought the house in foreclosure. That lot is unparraled in these parts. Yes the roof is ugly, can't wait to getthe IKO junk off the front of the house, and frankly there is barely any asphalt left on the back.......

Outlaw, if I understand you correctly, shingle the middle, then bring the 2 sides in, creating a V shaped valley, if so how open should I leave the bottom? I had not thought of having two cuts in there?????

It seems like they originally should have just run it straight into the house ratherthan putting a little turn in. I have no idea why they did that..... I guess why wonder at this point, just clean it up!
JTW is offline   Reply With Quote
Old 08-31-2009, 04:15 PM   #7
Pro
Trade: roofing,siding,gutters,windows
 
Join Date: Jan 2009
Location: VIRGINIA
Posts: 231
.......

Outlaw, if I understand you correctly, shingle the middle, then bring the 2 sides in, creating a V shaped valley, if so how open should I leave the bottom? I had not thought of having two cuts in there?????

Yeah, exactly.

I would weave the first course. As far as cutting, the "tamko" style valley should suffice.

Or just reframe it. If it were my house, I would reframe it. I couldn't stand looking at that stuff every day.
__________________
www.clarkroofingandsiding.com
outlaw is offline   Reply With Quote
Old 08-31-2009, 04:26 PM   #8
Professiona Instigator
 
rbsremodeling's Avatar
Trade: Design Build Remodeling Contractor Washington, DC
 
Join Date: Nov 2007
Location: Washington, DC/ Maryland
Posts: 6,546
Quote:
Originally Posted by outlaw View Post
.......

Outlaw, if I understand you correctly, shingle the middle, then bring the 2 sides in, creating a V shaped valley, if so how open should I leave the bottom? I had not thought of having two cuts in there?????

Yeah, exactly.

I would weave the first course. As far as cutting, the "tamko" style valley should suffice.

Or just reframe it. If it were my house, I would reframe it. I couldn't stand looking at that stuff every day.
Then after you are done with that find the original builder and kick his azz
rbsremodeling is offline   Reply With Quote
Old 08-31-2009, 04:38 PM   #9
Curmudgeon
 
neolitic's Avatar
Trade: carpentry/remodeling/"Yes M'am we do"
 
Join Date: Apr 2006
Location: Beech Grove, Indiana, Birthplace of the "King of Cool"
Posts: 10,150
Another vote to re-frame it.
Two valleys coming together
at the bottom can't be good.
__________________
Put your location in your profile!
(Sorry....it seems there really are dumb questions)
neolitic is online now   Reply With Quote
Old 08-31-2009, 04:39 PM   #10
Professiona Instigator
 
rbsremodeling's Avatar
Trade: Design Build Remodeling Contractor Washington, DC
 
Join Date: Nov 2007
Location: Washington, DC/ Maryland
Posts: 6,546
Quote:
Originally Posted by neolitic View Post
Another vote to re-frame it.
Two valleys coming together
at the bottom can't be good.
Yes re-frame it.

No vote to kick the OB azz?
rbsremodeling is offline   Reply With Quote
The Following User Says Thank You to rbsremodeling For This Useful Post:
bert0168 (08-31-2009)
Old 08-31-2009, 04:42 PM   #11
Curmudgeon
 
neolitic's Avatar
Trade: carpentry/remodeling/"Yes M'am we do"
 
Join Date: Apr 2006
Location: Beech Grove, Indiana, Birthplace of the "King of Cool"
Posts: 10,150
Figure it's not worth the trouble
to dig him up.
Surely he's hiding in a very deep hole.
__________________
Put your location in your profile!
(Sorry....it seems there really are dumb questions)
neolitic is online now   Reply With Quote
Old 08-31-2009, 05:18 PM   #12
Chief hand holder
 
bert0168's Avatar
Trade: Residential Remodeling
 
Join Date: Jan 2008
Location: South Eastern PA
Posts: 551
2 for the azz kickin'

And yes DEFINATELY reframe it. Anything you do, even if correct, will still look like chit on what's there now.
bert0168 is offline   Reply With Quote
Old 08-31-2009, 05:22 PM   #13
Pro
Trade: Roofing & Siding Contractor
 
Join Date: Mar 2007
Posts: 378
I'd also opt to fix it with framing.

That small of an area you are not going to have much into materials to fix that problem the right way.

Getting it framed right, might be a head ache, but you won't have to look at that every time you come home.

You are probably a better framer than me, and I'd reframe it, so no excuse
J-Peffer is offline   Reply With Quote
Old 08-31-2009, 05:50 PM   #14
Pro
Trade: Framing
 
Join Date: Jan 2009
Location: Utica,NY
Posts: 521
Quote:
Originally Posted by JTW View Post
None taken, But if I did that would I be asking what to do with it? We are done the interior and now working exterior. Bought the house in foreclosure. That lot is unparraled in these parts. Yes the roof is ugly, can't wait to getthe IKO junk off the front of the house, and frankly there is barely any asphalt left on the back.......

Outlaw, if I understand you correctly, shingle the middle, then bring the 2 sides in, creating a V shaped valley, if so how open should I leave the bottom? I had not thought of having two cuts in there?????

It seems like they originally should have just run it straight into the house ratherthan putting a little turn in. I have no idea why they did that..... I guess why wonder at this point, just clean it up!

Now you are telling us you remodeled the inside and now are going to address the roof??
Something sounds off with that order of work.

Now I guess I know what I am looking at, your house, take the time to fix the framing properly. Now you understand about the question of your order of construction.
Good luck!
Framer53 is offline   Reply With Quote
Old 08-31-2009, 07:09 PM   #15
JTW
Member
Trade: GC
 
Join Date: Jan 2009
Location: Coastal NH
Posts: 72
So true, our projects come after the bills get payed. The wife wanted to get the inside done first, and it was plenty weather tight, what was another 6 months, so the exterior has waited. Plus I am trying to keep the assesor away, already have an $11k tax bill.
I double checked and just as I recalled it, absolutely no reason for the jog in Ridge, other than maybe someone thought that was a good solution(WTF)! I agree re-frame, simple job, just more time....., I could not stand to look at a V valley like that for the next who knows how many years....still will look a little funky, but better than the alternative. At the price of the TL's, I am nevre doing this roof again!
JTW is offline   Reply With Quote
Old 08-31-2009, 07:50 PM   #16
Pro
Trade: Roofing & Siding Contractor
 
Join Date: Mar 2007
Posts: 378
Quote:
Originally Posted by JTW View Post
So true, our projects come after the bills get payed. The wife wanted to get the inside done first, and it was plenty weather tight, what was another 6 months, so the exterior has waited. Plus I am trying to keep the assesor away, already have an $11k tax bill.
I double checked and just as I recalled it, absolutely no reason for the jog in Ridge, other than maybe someone thought that was a good solution(WTF)! I agree re-frame, simple job, just more time....., I could not stand to look at a V valley like that for the next who knows how many years....still will look a little funky, but better than the alternative. At the price of the TL's, I am nevre doing this roof again!
Dam 11k tax bill, I feel for you.

I get hit pretty hard on some investment properties because they are not primary residents.

I complain about taxes to everyone. I pay 30% off any income I make right off the bat, then have to pay to register vehicles to drive on the road, extra tax on gas, cell phones, land lines, I pay it on cable, internet providers.

Then Property tax, Sales tax on anything I buy. I've never figured it, what I bring it, probably more than 50% goes to taxes between the income tax and all the other taxes that are paid on things.
J-Peffer is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
DW718 Heck of a deal @ Lowes...you heard me Lowes CrpntrFrk Tools & Equipment 23 08-28-2009 02:50 AM
A major deal for someone! done4fun Contractor Swap 10 06-24-2009 10:03 PM
Deal or No Deal MarcoPaints Painting & Finish Work 13 05-27-2009 05:10 PM
Here is the Deal about Lead Services GC3 Online Leads Services 19 04-13-2009 12:46 PM
Does any one have good system in place to deal with this? J3 Construction Business 16 09-10-2008 08:49 PM




Top of Page | View New Posts


All times are GMT -5. The time now is 11:26 PM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC