Contractor Talk - Construction and Remodeling Site
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Contractor Talk - Professional Construction and Remodeling Forum > Trade Talk > Carpentry > Framing

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 08-27-2009, 11:38 AM   #1
Member
Trade: Spec GC
 
Join Date: May 2007
Location: Lake Placid, NY
Posts: 98
Thermally broken studs

Ever used them? A client for which I did plans got a deal on enough to frame his new house.

Thought I would post a couple pics, now that the place is mostly framed out.

Studs and plates are all 2x4s, to which the manufacturer has laminated a 1.5x1.5 layer of rigid iso foam, then an inner nailing surface of 1/2" OSB. Maker is Nordic Engineered Wood Products, of someplace in northern Quebec.

Insulation in walls will be 3" nominal thickness spray iso foam, the fillets of which will pretty much ensure no delamination occurs between the rigid foam thermal break and the studs. Or so the owner hopes.
My apologies to the dialup folks.

I helped frame for a couple days, and in my experience, the loss from delams was pretty minimal. The way that Nordic makes these, the lams are resawn once the glueup is done, with the inside parts measuring about 1-3/8", so that any ganged members are tight, wood to wood. A close look at the pics will show the telltale sawkerf mark about 1/4" onto the 2x4.
Attached Thumbnails
thermally-broken-studs-dscf0582.jpg   thermally-broken-studs-dscf0584.jpg  

UpNorth is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 08-27-2009, 11:42 AM   #2
Plausible Deniability
 
JumboJack's Avatar
Trade: General Contractor
 
Join Date: Aug 2007
Location: Lakewood CA.
Posts: 2,231
Why not just use 2x6's?
__________________
"The problem with socialism is that eventually you run out of other people's money."
JumboJack is online now   Reply With Quote
Old 08-27-2009, 11:56 AM   #3
Pro
 
concretemasonry's Avatar
Trade: Masonry consultant
 
Join Date: Nov 2006
Location: Minnesota
Posts: 1,433
Thermally broken studs

2x6's would obviously be better structurally, but there is still a "thermal short circuit" through the wood.

This thermal short circuit is the reason why R19 insulation in a 6" wall actually gives an R10 to R15 wall at best (in a short term lab test). The only thing worse would be a steel stud.

If you are just concerned with material costs, and tradition and you can sell the owner on it, it may be within "code" (which is the worst way you can build and still be legal) and not the best way.
__________________
Dick
concretemasonry is offline   Reply With Quote
Old 08-27-2009, 01:41 PM   #4
Pro
Trade: general contractor
 
Join Date: Oct 2008
Location: Sterling ,Alaska
Posts: 731
That's one way...another way is to use 2x6 top and bottom plates( or wider) but use 2x4 studs staggared on 1' centers... the outside course for the exterior surface and the inside course for the drywall which eliminates thermal bridging.

thermally-broken-studs-thermal-wall.jpg
__________________
http://sullcon.homestead.com/

Last edited by mics_54; 08-27-2009 at 01:54 PM.
mics_54 is offline   Reply With Quote
Old 08-27-2009, 02:27 PM   #5
Pro
Trade: general contractor
 
Join Date: Oct 2008
Location: Sterling ,Alaska
Posts: 731
I'd say overall the design looks terribly costly in labor. I've seen a few energy efficient homes being built here in alaska with 2x4 walls for structural frame covered on the exterior with 4 inches of ridgid foam and an outer layer of bitumin.
__________________
http://sullcon.homestead.com/
mics_54 is offline   Reply With Quote
Old 08-27-2009, 06:28 PM   #6
The Duke
 
framerman's Avatar
Trade: Framing, Custom Carpentry, Architectural Design
 
Join Date: Mar 2006
Location: Maine
Posts: 3,782
Blog Entries: 3
There are dozens of ways to break the thermal bridge. Half inch rigid foam inside or out would do this. A ceramic coating does too (it's applied like paint)

This manufactured stud to me seems unnecessary.

2x4's look like nice material.
__________________
If one advances confidently in the direction of one's dreams,
and endeavors to live the life which one has imagined,
one will meet with a success unexpected in common hours
~Henry David Thoreau

Last edited by framerman; 08-27-2009 at 06:30 PM.
framerman is offline   Reply With Quote
Old 08-27-2009, 08:12 PM   #7
New Guy
Trade: Carpenter
 
Join Date: Jan 2009
Location: Edmonton, AB
Posts: 25
Hmmm, that is interesting but almost seems "gimmicky" to me, XPS on the outside is probably the easiest way to get that thermal break (as framerman stated).

I walked through a "net-zero" house built here in Edmonton that had an interesting design for its exterior walls (its a duplex whose net energy use over the course of a full year is zero, keep in mind that we regularly get down to -30 Celcius in the winter, so its quite impressive IMHO).


Walls were R56! Exterior wall was 2x4, 16" space, inner wall was 2x4 @ 24"oc. This design also gives you an almost 100% thermal break.

Link: http://www.riverdalenetzero.ca
canadianwood is offline   Reply With Quote
Old 08-27-2009, 08:20 PM   #8
Pro
 
BirmanBuilders's Avatar
Trade: Framing
 
Join Date: Aug 2005
Location: Evergreen Park, Illinois
Posts: 170
don't think the trim will hold on too well to 1/2 osb! what about drywall? Do they have to use longer screws to hit into the stud?
__________________
If at first you don't succeed hit it harder!
BirmanBuilders is offline   Reply With Quote
Old 08-29-2009, 09:25 AM   #9
Member
Trade: Spec GC
 
Join Date: May 2007
Location: Lake Placid, NY
Posts: 98
Design versus reality

Here is a shot of the project thus far, and for comparison, a render of the design as done using Chief Architect software. Roof trusses go on next week. Except for me helping out for a little bit when framing walls off the first deck, the entire thing, dig, footings, foundation, framing, etc., has been done by owner/builder and his one helper.

The photo is a pretty good approximation of the view seen from the second story windows looking W. That is the upper L in the photo and render of the house, the windows looing out over the screened porch.

The sun in May, June, and July, sets near Indian Pass, which is the deep notch in the photo of the range.
Attached Thumbnails
thermally-broken-studs-rear-render-looking-north-northeast.jpg   thermally-broken-studs-dscf0591.jpg  
Attached Images
 
UpNorth is offline   Reply With Quote
Old 08-29-2009, 10:57 AM   #10
Pro
 
tomstruble's Avatar
Trade: siding
 
Join Date: Mar 2007
Location: west milford n.j.
Posts: 1,855
looks awesome
__________________
Tom
tomstruble is online now   Reply With Quote
Old 08-29-2009, 11:10 AM   #11
Pro
Trade: general contractor
 
Join Date: Oct 2008
Location: Sterling ,Alaska
Posts: 731
yea...nice job!
__________________
http://sullcon.homestead.com/
mics_54 is offline   Reply With Quote
Old 08-29-2009, 11:14 AM   #12
Pro
Trade: Framing
 
Join Date: Jan 2009
Location: Utica,NY
Posts: 517
How much time have they into the project?
Looks like a nice site!
Framer53 is online now   Reply With Quote
Old 08-29-2009, 11:25 AM   #13
Carpenter
 
WNYcarpenter's Avatar
Trade: custom homebuilding/remodeling/restoration
 
Join Date: Mar 2007
Location: Jamestown NY
Posts: 906
Quote:
Originally Posted by BirmanBuilders View Post
don't think the trim will hold on too well to 1/2 osb! what about drywall? Do they have to use longer screws to hit into the stud?
I was wondering the same thing.
__________________
"I knew I lost my wallet as soon as I threw my pants over the fence". -'lil jarhead bro when asking for a wire transfer...
WNYcarpenter is offline   Reply With Quote
Old 08-29-2009, 11:27 AM   #14
Pro
 
tomstruble's Avatar
Trade: siding
 
Join Date: Mar 2007
Location: west milford n.j.
Posts: 1,855
interesting i thought the foam would be on the outside
tomstruble is online now   Reply With Quote
Old 08-29-2009, 02:42 PM   #15
Member
Trade: Spec GC
 
Join Date: May 2007
Location: Lake Placid, NY
Posts: 98
I just ran some numbers on how many manhours have gone into the project from groundbreaking to where you see it in these pics.

I get about 950 total, half of which the owner/builder got for free, since it is his own labor and he is sort of retired, and the other half is paid for (475 manhours) to his able assistant, a very capable 66-year old.

Let's presume his fully-burdened cost for those 475 hours of hired labor is $30 per hour. I get a total cost of $14,250, and I'll bet that is conservative.

That includes all excavation, underground drainage, underground to existing septic system, footings, foundation (all Amvic ICF), and the frame carpentry you see. The owner has for a long time operated a cabinet and tile business, and is a very talented mason and carpenter. His helper is a retired stonemason.

The owner has a John Deere loader/excavator/backhoe with all kinds of attachments for hoisting, etc.

Nothing at all will be subcontracted in this project. Plumbing, HVAC, and electric work will all be done by the owner/builder.
UpNorth is offline   Reply With Quote
Old 09-03-2009, 12:49 PM   #16
Member
Trade: Spec GC
 
Join Date: May 2007
Location: Lake Placid, NY
Posts: 98
Part of roof framed

Trusses are up on garage and connector.

The garage has a square footprint, about 25x25, a hipped duncecap roof at 6:12, and with no internal supports wanted, trussing was the solution.

The overhangs are such that the truss hips have 2x8 top chords. When the roof goes on the house, with its 46" overhangs, we will see the hip trusses with their 2x12 top chords. The truss supplier used machine stressed lumber with a higher allowable stress than #1 structural, for these.

Perfection in planing was gotten everywhere. Trusses were ordered with 1" extra tail extensions, so as to allow for tail cutting to a stringline, but the fab-up was so good that no cutting will be done. Tails are in line, as-is.

No blocking or capping is on yet. They just got slapped up quickly and braced across the commons, as can be seen.
Attached Thumbnails
thermally-broken-studs-021.jpg   thermally-broken-studs-022.jpg  

Last edited by UpNorth; 09-03-2009 at 12:51 PM.
UpNorth is offline   Reply With Quote
Old 09-03-2009, 12:53 PM   #17
Member
Trade: Spec GC
 
Join Date: May 2007
Location: Lake Placid, NY
Posts: 98
Another view of the low roof trussed part

A photo, and a rendering from the Chief file that shows where the project is headed.

Trees are northern white birch, and leaves will be falling soon. The summer birds, the robins, virios, thrushes, swallows, and the others, have all left, and things are pretty quiet. All we have now for bird noise are crows, jays, chickadees, turkeys, grouse, and some loons. The loons will head out in a few more weeks.
Attached Thumbnails
thermally-broken-studs-023.jpg   thermally-broken-studs-render-looking-se.jpg  

Last edited by UpNorth; 09-03-2009 at 12:57 PM.
UpNorth is offline   Reply With Quote
Old 09-03-2009, 07:28 PM   #18
Pro
 
oldfrt's Avatar
Trade: Remodeling
 
Join Date: Oct 2007
Location: Northwest Connecticut
Posts: 1,135
I don't get it!!!!!

All that expense for thermally broken studs and to save what?

You're going to lose a ton of heat through all that glass.
Is that issue addressed in this design?

Are they counting on passive solar gain?
__________________
There is no warranty, expressed or implied, as to the accuracy, reliability or completeness of furnished data.Information gathered here may be for the sole purpose of entertainment.
oldfrt is offline   Reply With Quote
Old 09-03-2009, 08:05 PM   #19
Member
Trade: Spec GC
 
Join Date: May 2007
Location: Lake Placid, NY
Posts: 98
Windows are by Thermotech.

You are invited to study their specs by going here.

Triple pane, special inert gases, warm edge spacers, high-performance coatings. Pretty special, and verrrrrryyyyy pricey.
UpNorth is offline   Reply With Quote
The Following User Says Thank You to UpNorth For This Useful Post:
oldfrt (09-03-2009)
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Removing studs from a load bearing wall. Russ25nys Framing 36 06-13-2009 08:52 PM
Extending 4" studs to 5 1/2" Danno6102 Carpentry 18 05-29-2009 06:38 PM
Attaching wood studs to metal studs AlSmith Framing 13 05-16-2009 10:58 PM
Is this window broken? Captainsls Windows, Siding and Doors 4 05-03-2009 02:27 PM
broken wood screw cab-guy89 Carpentry 28 04-11-2009 12:36 AM




Top of Page | View New Posts


All times are GMT -5. The time now is 03:00 PM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC