Contractor Talk - Construction and Remodeling Site
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Contractor Talk - Professional Construction and Remodeling Forum > Trade Talk > Carpentry > Framing

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 08-19-2009, 01:55 PM   #1
Fentoozler
 
Celtic's Avatar
Trade: Professional Pie and Pastry Taster
 
Join Date: May 2007
Location: New Jersey
Posts: 5,589
Strapping?

I'm getting ready to start a renov. on my 1st. flr bath....I want to sister up the 2x8 joists for added support for the tub, tile, etc.

Looking up at the 1st flr joists from the basement, there is this metal strapping in place..sort of forming an "X" between 2 adjacent joists.
What is this for?
Why?
This house was built in 1950...I don't think much consideration was given to hurricanes and that sort of event.

Can I just cut this strapping out and sister up as planned ...abandoning the strapping?
I don't see what purpose it serves...other than to be in my way

__________________


The UD is quite possibly man kinds finest accomplishment.
Celtic is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 08-19-2009, 02:00 PM   #2
Plausible Deniability
 
JumboJack's Avatar
Trade: General Contractor
 
Join Date: Aug 2007
Location: Lakewood CA.
Posts: 2,235
I "think" they where used like a block would be used.To keep the joists from twisting...
__________________
"The problem with socialism is that eventually you run out of other people's money."
JumboJack is offline   Reply With Quote
The Following User Says Thank You to JumboJack For This Useful Post:
Celtic (08-19-2009)
Old 08-19-2009, 02:08 PM   #3
Fentoozler
 
Celtic's Avatar
Trade: Professional Pie and Pastry Taster
 
Join Date: May 2007
Location: New Jersey
Posts: 5,589
Quote:
Originally Posted by JumboJack View Post
I "think" they where used like a block would be used.To keep the joists from twisting...

I could understand that IF they had done the same on the 2nd floor...

...UNLESS of course, the strapping was there to prevent twisting while working the joists on a cement/cinder block wall...

The 2nd flr joists could have been nailed to 1st flr walls/framing and such to prevent the twisting and falling/domino effect.


The place is balloon construction.
__________________


The UD is quite possibly man kinds finest accomplishment.
Celtic is offline   Reply With Quote
Old 08-19-2009, 02:09 PM   #4
Pro
Trade: Carpentry
 
Join Date: Nov 2007
Location: Boise, ID
Posts: 619
Quote:
Originally Posted by JumboJack View Post
I "think" they where used like a block would be used.To keep the joists from twisting...
my thoughts exactly, fancy blocking used back then, if you cut it, you may want to replace it with wood blocking when you are done sistering joists.
__________________
Quote:
Originally Posted by Zinsco View Post
First off, I have nothing but contempt for my employees, they will never be as good as me and I hate them for that.
www.meetre.com
Meetre is offline   Reply With Quote
The Following User Says Thank You to Meetre For This Useful Post:
Celtic (08-19-2009)
Old 08-19-2009, 02:55 PM   #5
framer
 
steves's Avatar
Trade: framing
 
Join Date: Feb 2007
Location: S.E. mass
Posts: 123
Does it look like this ?

http://www.strongtie.com/products/CFS/TB-LTB.asp

If so you can replace it with blocking or strapping on the bottom of the joists.
steves is offline   Reply With Quote
The Following User Says Thank You to steves For This Useful Post:
Celtic (08-19-2009)
Old 08-19-2009, 03:01 PM   #6
Fentoozler
 
Celtic's Avatar
Trade: Professional Pie and Pastry Taster
 
Join Date: May 2007
Location: New Jersey
Posts: 5,589
Quote:
Originally Posted by steves View Post



Very similar..probably a thinner steel.


Quote:
Originally Posted by steves View Post
If so you can replace it with blocking or strapping on the bottom of the joists.
I *could*...but why?
Is it really necessary considering I will be doubling up the 2x8s ?
__________________


The UD is quite possibly man kinds finest accomplishment.
Celtic is offline   Reply With Quote
Old 08-19-2009, 03:57 PM   #7
Maker of fine kindleing
 
Gus Dering's Avatar
Trade: cabinet maker
 
Join Date: Oct 2008
Location: Santa Rosa CA
Posts: 2,197
Send a message via Yahoo to Gus Dering
Metal bridging or solid blocking placed midspan adds stiffness to a joist when a load is applied to one or two joists. In order for them to deflect a significant amount the bottom of the joist needs to twist to one side or the other. The metal bridging you need to remove keeps the bottom of the joist stacked with the top so the joist will perform to it's highest load rating.

All that said, cut it out of your way, throw in the new joist and block the bay if you want. If not don't loose any sleep over it.
__________________
Quote:
Originally Posted by WarnerConstInc. View Post
Gus is right.
Gus Dering is online now   Reply With Quote
The Following User Says Thank You to Gus Dering For This Useful Post:
Celtic (08-19-2009)
Old 08-19-2009, 06:29 PM   #8
Curmudgeon
 
neolitic's Avatar
Trade: carpentry/remodeling/"Yes M'am we do"
 
Join Date: Apr 2006
Location: Beech Grove, Indiana, Birthplace of the "King of Cool"
Posts: 10,149
Put in the bridging.
Then don't lose any sleep.
__________________
Put your location in your profile!
(Sorry....it seems there really are dumb questions)
neolitic is online now   Reply With Quote
The Following User Says Thank You to neolitic For This Useful Post:
Celtic (08-19-2009)
Old 08-19-2009, 09:28 PM   #9
Fentoozler
 
Celtic's Avatar
Trade: Professional Pie and Pastry Taster
 
Join Date: May 2007
Location: New Jersey
Posts: 5,589
I did the math on what I need as far as joists go [I can almost count to five by myself now]....

...and should have just enough scrap to block each bay twice...which is one more than the strapping



Thanks guys.
__________________


The UD is quite possibly man kinds finest accomplishment.
Celtic is offline   Reply With Quote
Old 08-19-2009, 09:28 PM   #10
Pro
Trade: Repair/Remodel
 
Join Date: Sep 2008
Location: Seattle, Wa
Posts: 542
If the buildings been there for 60 years, I think it's safe to just cut them and forget about it. The joists have done all the twisting and cupping they are going to do. Unless it makes you feel better, go ahead and put some new blocks in.
KennMacMoragh is offline   Reply With Quote
Old 08-19-2009, 09:36 PM   #11
Fentoozler
 
Celtic's Avatar
Trade: Professional Pie and Pastry Taster
 
Join Date: May 2007
Location: New Jersey
Posts: 5,589
Quote:
Originally Posted by KennMacMoragh View Post
Unless it makes you feel better, go ahead and put some new blocks in.

It's that or toss the scrap...
__________________


The UD is quite possibly man kinds finest accomplishment.
Celtic is offline   Reply With Quote
Old 08-19-2009, 09:37 PM   #12
---
 
loneframer's Avatar
Trade: residential framing/general carpentry
 
Join Date: Feb 2009
Location: Southern New Jersey
Posts: 3,596
I have thrown in the towel on metal strap bridging. In addition to preventing "splaying" of the joists, properly installed X bridging will allow load sharing between the joists. As joists shrink over time, metal bridging loses it's tension and is useless for load sharing. If 1x3 or 4 wood X bridging is properly installed, as the joists shrink, they actually get tighter and stiffen the floor, removing "bounce". Metal strap is also notorious for annoying squeeks in the floor, which is ultimately caused by their failure to loadshare.

Last edited by loneframer; 08-19-2009 at 09:40 PM.
loneframer is online now   Reply With Quote
Old 08-19-2009, 09:42 PM   #13
Think it Draw it Build it
 
wallmaxx's Avatar
Trade: WA STATE GC Specialized in Structural Framing
 
Join Date: Jun 2007
Location: Lynden, Washington
Posts: 1,620
People used to think that bridging (blocks or strapping) reduced floor bounce when the spans were close to the code limits.

The last apartment I did, the engineer said to my face - bridging is only good for adding squeaks to your floor system.
__________________
WallMaxx, Inc.
Think it. Draw it. Build it.
Gun control is like trying to reduce drunk driving by making it tougher for sober people to own cars..
>>>>>libertas<<<<<
wallmaxx is offline   Reply With Quote
Old 08-19-2009, 09:43 PM   #14
Pro
 
knucklehead's Avatar
Trade: Framing,Remodeling,General Contractor
 
Join Date: Mar 2009
Location: Kansas City
Posts: 613
You will have to do solid bridging to replace the old because you won't be able to nail the top of "X" bridging, unless you take out the subfloor. I would put some back if you can . It can't hurt. Even if it is not as tall as the joists. It will help keep those double joists tight together
knucklehead is offline   Reply With Quote
Old 08-19-2009, 09:46 PM   #15
Pro
 
knucklehead's Avatar
Trade: Framing,Remodeling,General Contractor
 
Join Date: Mar 2009
Location: Kansas City
Posts: 613
Quote:
Originally Posted by wallmaxx View Post
People used to think that bridging (blocks or strapping) reduced floor bounce when the spans were close to the code limits.

The last apartment I did, the engineer said to my face - bridging is only good for adding squeaks to your floor system.
What do engineers know?

I think it helps, personally. I lived in a house that had a 16' span with a bounce when the kids were running around. I put solid blocks in and it got rid of the bounce.
knucklehead is offline   Reply With Quote
Old 08-19-2009, 09:49 PM   #16
Fentoozler
 
Celtic's Avatar
Trade: Professional Pie and Pastry Taster
 
Join Date: May 2007
Location: New Jersey
Posts: 5,589
Quote:
Originally Posted by knucklehead View Post
You will have to do solid bridging to replace the old because you won't be able to nail the top of "X" bridging, unless you take out the subfloor.

I can actually remove the sub floor.
It doesn't really affect me.
I have to lay a new sub floor and was just going to pile it on the existing floor before slapping down some DenseShield.

The saddle/threshold into the bath is probably about 1" - 2" higher than the hallway.
__________________


The UD is quite possibly man kinds finest accomplishment.
Celtic is offline   Reply With Quote
Old 08-19-2009, 10:10 PM   #17
---
 
loneframer's Avatar
Trade: residential framing/general carpentry
 
Join Date: Feb 2009
Location: Southern New Jersey
Posts: 3,596
Quote:
Originally Posted by knucklehead View Post
You will have to do solid bridging to replace the old because you won't be able to nail the top of "X" bridging, unless you take out the subfloor. I would put some back if you can . It can't hurt. Even if it is not as tall as the joists. It will help keep those double joists tight together
I have retrofitted wood X-bridging. Once they are cut to fit, lay the piece flat to the joist and nail or staple the top through the short point of the bevel. Then fold it over to the opposing joist, persuade it up tight and fasten. This is not the best way, but it works well if done correctly.
loneframer is online now   Reply With Quote
Old 08-19-2009, 10:32 PM   #18
Pro
 
knucklehead's Avatar
Trade: Framing,Remodeling,General Contractor
 
Join Date: Mar 2009
Location: Kansas City
Posts: 613
So you forgot to put it in before you put the plywood down?


I guess that would work, Aren't the metal ones made specifically for 16" centers?

Last edited by knucklehead; 08-19-2009 at 10:34 PM.
knucklehead is offline   Reply With Quote
Old 08-19-2009, 10:52 PM   #19
Fentoozler
 
Celtic's Avatar
Trade: Professional Pie and Pastry Taster
 
Join Date: May 2007
Location: New Jersey
Posts: 5,589
Quote:
Originally Posted by knucklehead View Post
So you forgot to put it in before you put the plywood down?



Quote:
Originally Posted by Celtic View Post
I can actually remove the sub floor.
It doesn't really affect me.
I have to lay a new sub floor and was just going to pile it on the existing floor before slapping down some DenseShield.

The saddle/threshold into the bath is probably about 1" - 2" higher than the hallway.


Nothing has been forgotten as nothing has been installed yet.
The room is demo'ed and that's it.
__________________


The UD is quite possibly man kinds finest accomplishment.
Celtic is offline   Reply With Quote
Old 08-20-2009, 08:38 AM   #20
Maker of fine kindleing
 
Gus Dering's Avatar
Trade: cabinet maker
 
Join Date: Oct 2008
Location: Santa Rosa CA
Posts: 2,197
Send a message via Yahoo to Gus Dering
Quote:
Originally Posted by Celtic View Post







Nothing has been forgotten as nothing has been installed yet.
The room is demo'ed and that's it.
He was razzin Loneframer with that comment.
It's not always about you.
__________________
Quote:
Originally Posted by WarnerConstInc. View Post
Gus is right.
Gus Dering is online now   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Dead blocks or strapping for trusses Csavage1 Carpentry 3 04-20-2009 12:04 PM
Strapping John1 Drywall 8 02-07-2009 04:15 AM
Insulating brick with 3/4 strapping downwithfloors Insulation 11 10-29-2008 05:59 PM
Insulating brick with 3/4 strapping downwithfloors Drywall 1 10-28-2008 06:40 PM
Studs on strapping Maplehead Framing 1 06-14-2008 01:15 PM




Top of Page | View New Posts


All times are GMT -5. The time now is 08:12 PM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC