#21 |
|
Rock it...
Trade: Framing, Roofing, Siding, Sheetrock, Interior Trim
Join Date: Feb 2008
Location: Montana
Posts: 865
|
Re: Remote Construction
A Kmax will haul 10k pounds but getting them to drop things off is ridiculously expensive. Heli is definitely the way to go if it fits in the budget. We did that for sheetrock here once just to get it to the house in the winter. Its pretty cool to watch. It was that or haul it 50 miles on about 3-4 ft of snow in the mountains.
__________________
www.battleridgebuilders.com |
|
|
|
|
|
#22 | |
|
General Contractor
Trade: General Contractor
Join Date: Jan 2009
Location: St. Petersburg, FL Minds of moderate caliber ordinarily condemn everything which is beyond their range.
Posts: 2,653
|
Re: Remote ConstructionQuote:
__________________
"True eloquence consists in saying all that is necessary, and only that which is." François Duc de La Rochefoucauld Bill Everett - St. Petersburg, FL |
|
|
|
|
|
|
#23 |
|
Palisade Point Const.
Trade: Remodeling/Finish/Framing/Log
Join Date: Feb 2007
Location: Bozeman MT
Posts: 1,781
|
Re: Remote Construction
Keep in mind, you will probably need more live load than that in Alaska. You need more than that here, and that's barely makes it at that load.
|
|
|
|
|
|
#24 |
|
Pro
Trade: contractor
Join Date: Oct 2008
Location: Alaska
Posts: 1,062
|
Re: Remote Construction
I can't imagine using 2x4 for any exterior wall or floor anyway ..it isn't enough space for insulation.
I'm thinking modules or panels. Panels would probably be easiest for logistics and onsite assembly. Air lift sounds fun but...sleds are pretty convenient and panels can be built in any garage. Keep in mind most of these structures will be recreational shelters. |
|
|
|
|
|
#25 | |
|
Palisade Point Const.
Trade: Remodeling/Finish/Framing/Log
Join Date: Feb 2007
Location: Bozeman MT
Posts: 1,781
|
Re: Remote ConstructionQuote:
I would think that if you could drop the whole thing in one load, it would be worth it, a lot due to the fact that you could build the whole thing before moving it. If you had to make several trips, I would guess that it would be better off loading it in on sled, trailer, horse, or maybe even a truck, depending on what the access to the site is like. |
|
|
|
|
|
|
#26 |
|
Pro
Trade: contractor
Join Date: Oct 2008
Location: Alaska
Posts: 1,062
|
Re: Remote Construction
Well to these remote site owners part of the fun is riding the machines and playing in the snow...give them a reason to own the toys. Most of the sites are near water and recreational activity keeps trails packed and groomed. A 500 will pull a 600# sled full of materials on a packed trail at 35 mph fairly easily.
|
|
|
|
|
|
#27 | |
|
Palisade Point Const.
Trade: Remodeling/Finish/Framing/Log
Join Date: Feb 2007
Location: Bozeman MT
Posts: 1,781
|
Re: Remote ConstructionQuote:
Garlic helicopters, also based in the Bitteroot, modifies the Huey Cobras for heavy lift, and they will pick up 9000, which is nearly as much as a sky crane. However, they are only used for fire fighting. |
|
|
|
|
|
|
#28 |
|
Maker of fine kindling
|
Re: Remote Construction
I used a helicopter once in Tacoma WA for a remodel at a hospital.
We needed 12 ft rock and fairly long steel studs to an area of the hospital that would have been a biotch to carry them through the halls and the elevator couldn't handle the lengths.. We had the whole package dropped on the roof real close to the job. What a cool deal that was. There was a pucker factor for us with visions of this load flying over all those occupied areas of the hospital and breaking up. ![]() ![]() Pilot made it look so easy. Sleds traveling at 35 mph down a trail through the woods seems like a blast too.
__________________
Every parent who has walked barefoot into their child's room late at night hates Legos |
|
|
|
|
|
#29 |
|
Pro
Trade: contractor
Join Date: Oct 2008
Location: Alaska
Posts: 1,062
|
Re: Remote Construction
The forest service had a chopper sling a dozer in for fighting a fire a few years ago...the had to take the tracks off and sling them separately. The set it down in a clearing.. dummies. Natural clearings in alaska are swamps. It sunk too far to get the tracks back on it. It might still be there.
|
|
|
|
|
|
#30 | |
|
Palisade Point Const.
Trade: Remodeling/Finish/Framing/Log
Join Date: Feb 2007
Location: Bozeman MT
Posts: 1,781
|
Re: Remote ConstructionQuote:
by panels, do you mean Sips, or framed panels? Sips would be a pain to do in a garage. |
|
|
|
|
|
|
#31 | |
|
Contractor
Trade: Excavation, Foundation, Concrete
Join Date: Feb 2006
Location: Maryland
Posts: 3,278
|
Re: Remote ConstructionQuote:
http://www.asvi.com/pdfs/spec_sheets...spec_sheet.pdf They don't go at 35 mph, but you can level the site with it, move boulders, take down trees, etc. |
|
|
|
|
|
|
#32 |
|
Pro
Trade: contractor
Join Date: Oct 2008
Location: Alaska
Posts: 1,062
|
Re: Remote Construction
sips are beyond the capabilities of an average DIYer. My plans will become obsolete once wesley clark gets time travel and teleportation working.
|
|
|
|
|
|
#33 | |
|
Palisade Point Const.
Trade: Remodeling/Finish/Framing/Log
Join Date: Feb 2007
Location: Bozeman MT
Posts: 1,781
|
Re: Remote ConstructionQuote:
|
|
|
|
|
|
|
#34 |
|
Member
Trade: remodeling
Join Date: Dec 2008
Location: north east ohio
Posts: 78
|
Re: Remote Construction
If you plan to use vinyl siding on the exterior, you could use 2x4 studs, 1" dow for the sheeting, fiberglass in the pocket, steel t bracing and 1/4" ply on the inside. Panelize 4x8 sections and lock it all together with steel plates.
Single top plates would also lighten the load. The panels would be very light and easily transportable. Brian |
|
|
|
|
|
#35 |
|
Pro
Trade: General Contracting, Remodeling
Join Date: Dec 2008
Location: Omaha, NE
Posts: 149
|
Re: Remote Construction
What program do you use to draw those sketches?
|
|
|
|
|
|
#36 |
|
solar guy
Trade: solar contracting
Join Date: Feb 2009
Location: Annapolis Md
Posts: 1,883
|
Re: Remote Construction |
|
|
|
|
|
#37 |
|
Pro
Trade: contractor
Join Date: Oct 2008
Location: Alaska
Posts: 1,062
|
Re: Remote Construction
Forsmant, I use Google Sketchup. Kewl huh?
|
|
|
|
|
|
#38 |
|
Pro
Trade: General Contracting, Remodeling
Join Date: Dec 2008
Location: Omaha, NE
Posts: 149
|
Re: Remote Construction
yes thanks
|
|
|
|
|
|
#39 | |
|
Contractor
Trade: Excavation, Foundation, Concrete
Join Date: Feb 2006
Location: Maryland
Posts: 3,278
|
Re: Remote ConstructionQuote:
Sorry for the interruption, carry on. |
|
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Commercial Construction Spreadsheet Help?? | SBI | Commercial Construction | 16 | 12-17-2010 11:17 AM |
| Construction Clean Up Rate in Missouri | mrcleanup | Business | 13 | 10-09-2009 02:47 PM |
| New construction - hardwood flooring advice | simeon | Flooring | 17 | 03-16-2009 10:58 PM |
| Geothermal to heat house under construction? | GregWCIL | HVAC | 9 | 11-26-2008 01:30 AM |
| Go to Page... |