Hip Truss system

I posted this a few years back and I just wanted to start a thread up again about this. While I prefer to see rafters in a home, it's not always my call. Most of the time here, we have gables, so it's not a big deal.

But when we do get a hip truss system here, it really, really blows. It's the most awful system you can imagine. Hangers everywhere, a hip girder hangered into the hip master, termination of the jacks into the hip master, nowhere to run a continuous hip since the rest of the hip package interferes with the plane.....it's hell

When I lived in Seattle, I met with a truss designer and we educated each other from our point of view and came up with a hip truss system that requires no metal connectors (hangers), no bracing on the strongbacks, or extra material by either the truss company or builder.

And it's fast.

The comments I posted on the pdf aren't quite as professional as I'd like to see, but I'm not in the mood to rewrite things.

This is what I and many others would call a California hip system or close to it.

There's a chance in the next month or two I may get a hip truss system and I'm going to try once again to convert the truss designer. We'll see.

http://whittendesigns.com/pdf/HipRoofTruss.pdf

framerman is online now   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 09-03-2009, 08:06 PM   #2
Framer
 
Warren's Avatar
Trade: framing/remodeling
 
Join Date: Feb 2005
Location: NE Ohio
Posts: 1,371
You get used to doing those after you have done enough of em. We usually get ours dropped 1 1/2" and then we run 2x4 purlins up the ends. The hip can be a pain because only one side planes to the purlin. The other side we end up nailing blocks between the trusses to create a nailer for the hip. The hangers and girders can be a pain. We often have systems with 100+ hangers of maybe 7 or 8 different varieties. We try to prefab as much of the mono/girder systems, including hangers, as we can on the ground. Most of our roof systems are a combination of trusses and stick. Seems like that system you called out would work well. I may have to run it by our truss designers in the near future.
__________________
"Stop wasting lumber. It doesn't grow on trees ya know! Oh wait, it does."
Warren is online now   Reply With Quote
Old 09-03-2009, 08:26 PM   #3
Pro
Trade: Ret.
 
Join Date: May 2007
Location: Lake Placid, NY
Posts: 230
There are various ways to configure engineered trusses to handle hips.

here is a page with diagrams of four different ways, and each includes descriptive text.

What's your preference?

Not all truss makers will offer the customer this full array of choices.
UpNorth is offline   Reply With Quote
Old 09-03-2009, 08:36 PM   #4
Pro
Trade: General, Electrical, and Plumbing Contractor
 
Join Date: Feb 2007
Location: Portland, OR & Eatonville, WA
Posts: 858
Thats the way hip trusses have been done around here for years, and as Framerman mentioned called a California Hip Set.

Been a long time since I have used one, but it was easy compared to some of those other nightmares I have seen and used. Love those little dog ears where the hip master attaches to each truss on its way to the peak and how those stepdowns support the jacks.

The only thing now around here is that pressure blocking is frowned upon by the inspectors, they want to see hangers where those short trusses attach to the girder. I am assuming because a hangers strength can be verified compared to a pressure block. But I have used pressure blocking for years and have never had a problem.


Kgmz is offline   Reply With Quote
Old 09-03-2009, 08:42 PM   #5
Framer
 
Warren's Avatar
Trade: framing/remodeling
 
Join Date: Feb 2005
Location: NE Ohio
Posts: 1,371
We are required to leave a set of truss plans on the site for the inspector to review. Some places thy look at em, some they don't. It's not the inspectors job to play engineer and decide what goes or doesn't go when it comes to the truss assembly.
__________________
"Stop wasting lumber. It doesn't grow on trees ya know! Oh wait, it does."
Warren is online now   Reply With Quote
Old 09-03-2009, 08:51 PM   #6
Pro
Trade: General, Electrical, and Plumbing Contractor
 
Join Date: Feb 2007
Location: Portland, OR & Eatonville, WA
Posts: 858
Some other Hip systems.

























Kgmz is offline   Reply With Quote
Old 09-03-2009, 08:54 PM   #7
Pro
Trade: General, Electrical, and Plumbing Contractor
 
Join Date: Feb 2007
Location: Portland, OR & Eatonville, WA
Posts: 858
Quote:
Originally Posted by Warren View Post
We are required to leave a set of truss plans on the site for the inspector to review. Some places thy look at em, some they don't. It's not the inspectors job to play engineer and decide what goes or doesn't go when it comes to the truss assembly.
Same requirement here and now the building department has to see and have the truss engineering before you get the permit. As for the hangers, the truss engineers always spec hangers in their designs.
Kgmz is offline   Reply With Quote
Old 09-03-2009, 08:57 PM   #8
Framer
 
Warren's Avatar
Trade: framing/remodeling
 
Join Date: Feb 2005
Location: NE Ohio
Posts: 1,371
That drop in purlin system is what we see a lot of. If you look at the 2x4 hip purlin, you will wee that it only provides a nailer for one side. Blocks are added to make a nailer for the other side.
__________________
"Stop wasting lumber. It doesn't grow on trees ya know! Oh wait, it does."
Warren is online now   Reply With Quote
Old 09-03-2009, 08:58 PM   #9
Member
Trade: Framer
 
Join Date: Jul 2009
Location: South Central Texas
Posts: 82
That looks like another “Better Mouse Trap” hip truss design. I could work with those.

The midwest style is most common locally.

I prefer the type that is not dropped at all and I precut all the pressure, rafter, and hip blocks on a shop saw. I stock the trusses with a crane (2 hours crane time at most, it’s the minimum too.) laying down on the building with temporary purlin supports at ceiling height (- a little), pre build the girders and 8’ kickers and roll the assembly up, it is self bracing and straightens easily too. I pre block all the remainder trusses and roll them up, they also brace themselves with the blocks. Stack the commons against the first completed hip assembly to create work room and repeat the process on the other end, then slide the commons in place. 4 or 5 hours for three or four guys, rolled, blocked, and braced.

That system may go a little quicker since its eliminating a lot of rafter blocking. I like simple truss systems like that. Easy money.

Last edited by Birch; 09-03-2009 at 09:05 PM. Reason: Bigger Font, add MW comment
Birch is offline   Reply With Quote
Old 09-03-2009, 08:59 PM   #10
The Duke
 
framerman's Avatar
Trade: Custom Carpentry and Design
 
Join Date: Mar 2006
Location: Portland, Maine
Posts: 4,744
Blog Entries: 7
Ours around here are what you show as the step down. Total PITA
framerman is online now   Reply With Quote
Old 09-03-2009, 09:01 PM   #11
Framer
 
Warren's Avatar
Trade: framing/remodeling
 
Join Date: Feb 2005
Location: NE Ohio
Posts: 1,371
We used to do a lot of the block in systems too. Then we started seeing the purlin ones, which I hated at firs. For a while, they would call and ask me which one I wanted. Now that I am used to the purlins, I like them a lot better.
__________________
"Stop wasting lumber. It doesn't grow on trees ya know! Oh wait, it does."
Warren is online now   Reply With Quote
Old 09-03-2009, 09:04 PM   #12
Pro
Trade: General, Electrical, and Plumbing Contractor
 
Join Date: Feb 2007
Location: Portland, OR & Eatonville, WA
Posts: 858
I can't figure out why everyone else doesn't use the California style hip set. It is a lot easier and the top side is laid out just like you stick framed it.
Kgmz is offline   Reply With Quote
Old 09-03-2009, 09:05 PM   #13
Framer
 
Warren's Avatar
Trade: framing/remodeling
 
Join Date: Feb 2005
Location: NE Ohio
Posts: 1,371
Framerman:

When using the block system, after your guy precuts the common blocks, have him drive an 8d nail in halfway at the proper purlin. This way when you install the blocks, the nail can ride on the horizontal member truss, making the nailing/setting easier. Its a pain without the nail, because you have to hold the block in one hand, gun in the other, and try to nail it at the proper purlin. Hope I explained that so that you understand it. It really is a time saver.
__________________
"Stop wasting lumber. It doesn't grow on trees ya know! Oh wait, it does."
Warren is online now   Reply With Quote
Old 09-04-2009, 04:56 AM   #14
The Duke
 
framerman's Avatar
Trade: Custom Carpentry and Design
 
Join Date: Mar 2006
Location: Portland, Maine
Posts: 4,744
Blog Entries: 7
Thanks Warren, that is a good tip.
framerman is online now   Reply With Quote
Old 09-04-2009, 06:36 AM   #15
Pro
Trade: Framing and General Construction
 
Join Date: Aug 2009
Location: North Carolina
Posts: 153
see the drop ins around here mostly
cbfx3 is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Truss System Roof aliciadove Construction 1 01-18-2009 11:27 PM
Styrafoam wall system? mhillis General Discussion 6 10-31-2008 05:58 AM
??? Whats the best way to spread the news about your company? jmgrahamjr Marketing & Sales 21 06-24-2008 03:46 AM
System Bonding Jumper vs. Main Bonding Jumper Mark Twenhafel NEC Discussion 3 02-09-2008 06:15 PM
Systems Development List Gordo Business 19 01-08-2007 07:28 PM


Top of Page | View New Posts


All times are GMT -5. The time now is 05:18 PM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC