Bid On A Framing Job


I am just curious how you guys do it. As the framing subcontractor, do you include materials? I have hardly ever done this in 25 years ,but I know things are different in different parts of the country. There is one outfit in this area that seems to be getting a big part of what work there is here that furnishes the whole package. Just curious
knucklehead is offline  

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

   
 

Old 01-04-2010, 05:50 PM   #2
KemoSabe
 
loneframer's Avatar
 
Trade: residential framing/siding/general carpentry
Join Date: Feb 2009
Location: Vineland, New Jersey
Posts: 14,193
Rewards Points: 2,132

Re: Bid On A Framing Job


The only thing I ever supplied on a framing job is labor and gun nails. There were a few builders who asked me to bid jobs including material, but I stayed plenty busy without offering that service.
In this area, framers are responsible for framing, sheathing and installation of windows and exterior doors. I'd never float that kind of capital to finance someone elses project.

__________________
__________________________________




"Walking the fine line between production and perfection"




__________________________________
loneframer is online now  
Old 01-04-2010, 05:53 PM   #3
Geometrist
 
Warren's Avatar
 
Trade: framing/remodeling
Join Date: Feb 2005
Location: NE Ohio
Posts: 6,706
Rewards Points: 2,021

Re: Bid On A Framing Job


The only time I provide materials is when I do an insurance job. I have no idea why the contractor doesn't provide them, but who knows. If the job is large I get a deposit the covers the cost of materials. On residential framing jobs, I provide gun nails and all crane expenses. Everybody around here has done it this way for at least 30 years.
__________________
"The pro is the person who has all the hassles, obstacles, and disappointing frustrations that everyone else has. yet continues to persist, does the job, and makes it look easy."
Warren is online now  
Old 01-04-2010, 06:26 PM   #4
The Duke
 
Kent Whitten's Avatar
 
Trade: Cabinet Maker
Join Date: Mar 2006
Location: Portland, Maine
Posts: 14,745
Rewards Points: 2,036

Re: Bid On A Framing Job


No way would I supply materials for the job. That is way too much liability sitting in the driveway. Unless they want to pay a premium for it.

Or I have thought of this many, many times before. Prefab or precut everything at your shop. That way no materials are left on the site.

What I supply is labor and tools. Materials for the job that are supplied by the GC include wood, hangers, sill seal, nuts, washers, glue, typar, doors, windows and nails. Materials are precisely that....materials.

If I want to have a Lull, that's on my tab, not the GC's. We are fortunate here that the lumber trucks come with boom lifts and they are willing to send it up to the second floor for us. Boom trucks for trusses are supplied by the GC.
__________________
If you correct your mind, the rest of your life will fall into place ~Lao Tzu

SalmonFallsCabinetry.com

Salmon Falls Cabinetry on Facebook
Kent Whitten is offline  
Old 01-04-2010, 06:32 PM   #5
Geometrist
 
Warren's Avatar
 
Trade: framing/remodeling
Join Date: Feb 2005
Location: NE Ohio
Posts: 6,706
Rewards Points: 2,021

Re: Bid On A Framing Job


Man if the GC was paying for the crane I would have him there every week! Do you only use the crane to set roof trusses? On some of our bigger jobs we have had the crane there 5 or 6 times. I remember years ago we had a house with a 5000 sq ft pool room complete with church type beams. We had to have two cranes there that day.
Does the Contractor ever complain that your crane time was excessive?
__________________
"The pro is the person who has all the hassles, obstacles, and disappointing frustrations that everyone else has. yet continues to persist, does the job, and makes it look easy."
Warren is online now  
Old 01-04-2010, 06:34 PM   #6
Pro
 
Framer53's Avatar
 
Trade: Handyman
Join Date: Jan 2009
Location: Utica,NY
Posts: 2,273
Rewards Points: 1,112

Re: Bid On A Framing Job


All home builders or GC's complain about crane costs. Personally I think that's too bad! I am not ever going to lift a truss by hand again!
Framer53 is online now  
Old 01-04-2010, 06:47 PM   #7
Registered User
 
jochase1's Avatar
 
Trade: Framing contractor-General contractor
Join Date: Oct 2008
Location: Omaha
Posts: 6
Rewards Points: 10

Re: Bid On A Framing Job


All my proposals include all labor, any air driven fasteners, setting of all beams, steel or wood, and
setting of trusses if spec'd-I have 2 JCB loadalls, if they can't handle the load, I include crane rental as a part of my bid as well.
We also include exterior sheathing, housewrap, setting all exterior windows and doors, and taping them.

All materials are provided by GC
jochase1 is offline  
Old 01-04-2010, 07:14 PM   #8
Pro
 
cbfx3's Avatar
 
Trade: Framing and General Construction
Join Date: Aug 2009
Location: North Carolina
Posts: 157
Rewards Points: 150

Re: Bid On A Framing Job


I am seeing more and more of this. I think it is as much a factor of GC's being in a credit crunch as anything.
cbfx3 is offline  
Old 01-04-2010, 07:29 PM   #9
The Duke
 
Kent Whitten's Avatar
 
Trade: Cabinet Maker
Join Date: Mar 2006
Location: Portland, Maine
Posts: 14,745
Rewards Points: 2,036

Re: Bid On A Framing Job


Warren, I get the crane once for trusses. Beyond that, it's my money. If a GC complains about the time on the jobsite, it ain't me that's going slow, it's the crane operator. You and I have both seen great operators and pathetic ones. The good ones get the job done and save you money along with the GC.

Here, we get the boom truck to set individual trusses for however long we need it. When I lived in WA state, the boom came from the truss company and they set the trusses on top of our walls laying flat. 2 hours max and they were gone.

The lumber trucks around here have the fork booms like the sheetrock companies have. It's luxury. "Here...put that lift of studs right here"
__________________
If you correct your mind, the rest of your life will fall into place ~Lao Tzu

SalmonFallsCabinetry.com

Salmon Falls Cabinetry on Facebook
Kent Whitten is offline  
Old 01-04-2010, 09:21 PM   #10
Pro
 
galla35's Avatar
 
Trade: Framer
Join Date: Feb 2009
Location: Toledo Ohio
Posts: 440
Rewards Points: 250

Re: Bid On A Framing Job


For a framing job we bid labor and overhead and thats it. We set steel, run floor systems, decking, walls, wall sheathing, roof sheathing, tyvek set windows and exterior doors. We have a gradall lift so no crane needed round here.

If were not GC then we have everything supplied, sub floor adhesive, nuts, bolts, hand drive nails, shooters, c02 cardridges, gun oil, you name it..

Anything that is not supplied and needs to be used gets back charged such as a generator ect.
galla35 is offline  
Old 01-04-2010, 09:40 PM   #11
Member
 
grob62's Avatar
 
Trade: Windows and Doors
Join Date: May 2008
Location: North Central Illinois
Posts: 81
Rewards Points: 75

Re: Bid On A Framing Job


I'm framing a house for a guy who previously owned a crane company. He still owns two cranes. Let me tell you it was very nice not having to worry about crane times, because it is on the job the entire time. Setting the wall sections, trusses, any beams that need set, plywood while roof sheathing. He even picked his versa handler out of the foundation hole with his crane, after using it to bore a 24" hole out the side of the hill he's on for drainage.


grob62 is offline  
Old 01-04-2010, 11:05 PM   #12
Pro
 
jhark123's Avatar
 
Trade: General Contractor
Join Date: Aug 2008
Location: Enumclaw, WA
Posts: 1,854
Rewards Points: 278

Re: Bid On A Framing Job


Framerman,

I always have them help me set the girder trusses, they have never had a problem with that. I've never tried for individual trusses, maybe I'll see next time
jhark123 is online now  
Old 01-07-2010, 08:06 PM   #13
Pro
 
d-rock's Avatar
 
Trade: carpentry/drywall/plaster
Join Date: Oct 2009
Location: NYC
Posts: 377
Rewards Points: 250

Re: Bid On A Framing Job


we pay for all our own material. we also mark it up. I usually have the GC pay for boom, lifts or cranes. I prefer being in control of our material and making a profit on it.
d-rock is offline  
Old 01-07-2010, 10:28 PM   #14
I like Green things
 
WarnerConstInc.'s Avatar
 
Trade: Custom Carpentry Services
Join Date: Jan 2008
Location: In a van, down by the river. Auburn, IN
Posts: 16,525
Rewards Points: 3,316

Re: Bid On A Framing Job


I get just about everything delivered by one of those trucks.
The lumber yard is one block away too!!
__________________
Quote:
Originally Posted by Leo G View Post
Thanks for that tidbit of information Darcy.
Quote:
Originally Posted by Californiadecks View Post
I don't normally talk to people like I talk to you, however you have the little immature schoolgirl mentality so this is new to me.
Warner Remodeling
WarnerConstInc. is online now  
Old 01-08-2010, 10:41 PM   #15
Pro
 
galla35's Avatar
 
Trade: Framer
Join Date: Feb 2009
Location: Toledo Ohio
Posts: 440
Rewards Points: 250

Re: Bid On A Framing Job


Quote:
Originally Posted by WarnerConstInc. View Post
I get just about everything delivered by one of those trucks.
The lumber yard is one block away too!!
That is always nice.. We always use the same lumber yard so they stop out about 15 to 20 times a week so if we need something it gets there quick
galla35 is offline  
Old 01-10-2010, 01:21 AM   #16
Pro
 
KennMacMoragh's Avatar
 
Trade: Repair/Remodel
Join Date: Sep 2008
Location: Seattle, WA
Posts: 3,589
Rewards Points: 2,468
Send a message via MSN to KennMacMoragh

Re: Bid On A Framing Job


Almost always the framer supplies just labor, not material. Although one framing company I worked for was also a lumber yard, so they supplied their own materials. Except I don't know if they asked for the money up front on materials or not.

KennMacMoragh is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Framing Documents To Die For NC2X4 Framing 33 09-17-2010 10:45 AM
Framing Safety Safety Guy Tools & Equipment 3 08-13-2009 08:46 PM
Steel Framing Fasteners Orca Construction 12 05-23-2009 07:25 AM
Commercial wood framing mckellarman Commercial Construction 2 05-06-2009 05:11 PM
Framing Knee Wall with Metal Studs arawas Framing 6 02-18-2009 07:03 PM

Join Now... It's Fast and FREE!

I am a professional contractor
I am a DIY Homeowner
Drywall Talk is for
PROFESSIONAL CONTRACTORS ONLY!

At DrywallTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?