Take a look a this picture, and ignore the way the detail implies the use of t&g floor finish for the tread and riser finish.

I want to ask about two things, the steel hanger clipping the carriages to the landing header, and the use of plywood substrate under both tread and riser.
Having only built a few of these, my method has been to use a full-width sheet of 3/4 plywood as the hanger for carriages, and the finish tread and riser parts are fixed directly to the carriages, with no sheetgoods substrates on there first.
What do you do, and why?

UpNorth is offline  
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Old 11-19-2009, 02:03 PM   #2
Palisade Point Const.
 
TempestV's Avatar
 
Trade: Remodeling/Finish/Framing/Log
Join Date: Feb 2007
Location: Bozeman MT
Posts: 1,781

Re: Sitebuilt Stairs - Techniques


The plywood treads do two things- they act as temporary stairs so that the final stairs can be done later and not screwed up during construction, and they allow for more nailing for the T&G.
TempestV is offline  
Old 11-19-2009, 03:07 PM   #3
Maker of fine kindling
 
Gus Dering's Avatar
 
Trade: cabinet maker
Join Date: Oct 2008
Location: Santa Rosa CA
Posts: 4,755
Send a message via Yahoo to Gus Dering

Re: Sitebuilt Stairs - Techniques


I agree about the use of the stairs during construction.

The plywood riser should be run to the bottom of the tread IMO. So it can be fastened from behind and the tread is supoorted by those fasteners in shear along with the goo.

LVL's are the best for the stringers with this cuz of the no shrinkage factor.

I would prefer to lay out the system so that the top tread that is shown at the upper floor elevation to be full width when at all possible. Mostly for the ease of lay out but there comes a point where you can shorten it to the point of reducing the bottom chord's width.

The ply wood just adds stability to the assembly. It can't hurt to have it.
__________________
Every parent who has walked barefoot into their child's room late at night hates Legos
Gus Dering is offline  
Old 11-19-2009, 04:10 PM   #4
Curmudgeon
 
neolitic's Avatar
 
Trade: carpentry/remodeling/"Yes M'am we do"
Join Date: Apr 2006
Location: Beech Grove, Indiana, Birthplace of the "King of Cool"
Posts: 11,707

Re: Sitebuilt Stairs - Techniques


I think it was drawn by someone
who never built a set of stairs,
and probably couldn't if asked to.
JMO....
__________________
Put your location in your profile!
(Sorry....it seems there really are dumb questions)
neolitic is offline  
Old 11-19-2009, 05:21 PM   #5
Pro
 
Warren's Avatar
 
Trade: framing/remodeling
Join Date: Feb 2005
Location: NE Ohio
Posts: 3,696

Re: Sitebuilt Stairs - Techniques


That hanger at the top should not be necessary if the bottom is secured properly. As long as the bottom doesn't move, where can the top go?
I think the plywood is unnecessary as well. I don't see the need for the top tread like that either. The deck should be the starting point for the stairs.
Warren is online now  
Old 11-19-2009, 05:45 PM   #6
Maker of fine kindling
 
Gus Dering's Avatar
 
Trade: cabinet maker
Join Date: Oct 2008
Location: Santa Rosa CA
Posts: 4,755
Send a message via Yahoo to Gus Dering

Re: Sitebuilt Stairs - Techniques


Quote:
Originally Posted by Warren View Post
That hanger at the top should not be necessary if the bottom is secured properly. As long as the bottom doesn't move, where can the top go?
I think the plywood is unnecessary as well. I don't see the need for the top tread like that either. The deck should be the starting point for the stairs.
Different strokes I guess. I have always found it easier to just lean the stairs against the floor system. Never liked extending them up into the bottom and blocking them out and all that stuff.

I am absolutely sure you have that all worked out for yourself. I am a simple man with an uncomplicated mind unlike the geometric brainstorm that you are.
__________________
Every parent who has walked barefoot into their child's room late at night hates Legos
Gus Dering is offline  
Old 11-19-2009, 06:01 PM   #7
The Duke
 
KentWhitten's Avatar
 
Trade: Cabinet Maker
Join Date: Mar 2006
Location: Portland, Maine
Posts: 10,101

Re: Sitebuilt Stairs - Techniques


Depends, but usually plywood risers and treads. Like Gus says, the riser needs to go behind the tread. I've done it the way you show it, once. Usually hang it with ply. Your sheetrock nailer at the top and bottom, unnecessary. Your flooring for risers, retarded.
__________________
If you correct your mind, the rest of your life will fall into place ~Lao Tzu

Custom Cabinetry - Portland, Cape Elizabeth, Scarborough, Kennebunkport, Yarmouth, Falmouth, Cumberland, Ogunquit, Maine


Salmon Falls Cabinetry
KentWhitten is offline  
Old 11-19-2009, 06:11 PM   #8
Motorboatin' son of a ...
 
BKFranks's Avatar
 
Trade: General Contractor
Join Date: Feb 2008
Location: Orange County, CA
Posts: 1,069

Re: Sitebuilt Stairs - Techniques


__________________

BKFranks is offline  
Old 11-19-2009, 06:17 PM   #9
Pro
 
deckman22's Avatar
 
Trade: Deck Builder
Join Date: Oct 2007
Location: Austin, Tx.
Posts: 1,511

Re: Sitebuilt Stairs - Techniques


What's with the full stringer & notched stringer? It looks like the "full stringer" is nothing more than a 2x6 nailer usually added on when the stairway goes up against a wall to have S/R & trim piece.
__________________
Deckman
www.alscustomdecks.com
deckman22 is online now  
Old 11-19-2009, 06:46 PM   #10
Pro
 
AJAX's Avatar
 
Trade: GC, Remodeling
Join Date: Sep 2009
Location: Central, MN
Posts: 177

Re: Sitebuilt Stairs - Techniques


Quote:
Originally Posted by UpNorth View Post
Take a look a this picture, and ignore the way the detail implies the use of t&g floor finish for the tread and riser finish.

I want to ask about two things, the steel hanger clipping the carriages to the landing header, and the use of plywood substrate under both tread and riser.
Having only built a few of these, my method has been to use a full-width sheet of 3/4 plywood as the hanger for carriages, and the finish tread and riser parts are fixed directly to the carriages, with no sheetgoods substrates on there first.
What do you do, and why?

If I understand you correctly (we use diffrent terms) but, I don't bother with plywood. Why? Because it's more work. Just put stringers up one at a time and secure to sub floor and the double header at top. Why would you need more product?
AJAX is offline  
Old 11-19-2009, 11:23 PM   #11
chief pencil holder
 
Scribbles's Avatar
 
Trade: Custom Cabinet Maker, Handrail
Join Date: Mar 2009
Location: sacramento CA
Posts: 1,271

Re: Sitebuilt Stairs - Techniques


wow you guys make stairs complicated, just rember that the crotch of the stringer is the weak point take cate of that, cleat the bottom dont use t+g, anywhere, plywood risers, 5/4 treads. keep it tight and glue evreything.
__________________
Quote:
Originally Posted by Leo G View Post
Ahhhhh, just buy it.
http://sacramentomillworks.com
Scribbles is offline  
Old 11-23-2009, 01:08 AM   #12
Pro
 
bconley's Avatar
 
Trade: Kitchen and bath design+remodel
Join Date: Mar 2009
Posts: 710

Re: Sitebuilt Stairs - Techniques


We do it like figure "C" above, you need to know all of the flooring thicknesses,
with false treads and risers use 5/4 treads, use 3/4 sub floor for treads under full treads.
The stringers are usually (3) 2x12 with 2x4 nailer spacer on inside for drywall and skirt board clearance and stiffening. lots of glue on 1/2 ply risers
bconley is offline  
Old 11-23-2009, 01:36 AM   #13
Member
 
DFC's Avatar
 
Trade: Framing
Join Date: Nov 2009
Posts: 35

Re: Sitebuilt Stairs - Techniques


Quote:
Originally Posted by bconley View Post
We do it like figure "C" above, you need to know all of the flooring thicknesses,
with false treads and risers use 5/4 treads, use 3/4 sub floor for treads under full treads.
The stringers are usually (3) 2x12 with 2x4 nailer spacer on inside for drywall and skirt board clearance and stiffening. lots of glue on 1/2 ply risers
I do this. Except I use 1x4 nailer spacer. Why do you prefer 2x4?
DFC is offline  
Old 11-23-2009, 09:33 AM   #14
Curmudgeon
 
neolitic's Avatar
 
Trade: carpentry/remodeling/"Yes M'am we do"
Join Date: Apr 2006
Location: Beech Grove, Indiana, Birthplace of the "King of Cool"
Posts: 11,707

Re: Sitebuilt Stairs - Techniques


Quote:
Originally Posted by DFC View Post
I do this. Except I use 1x4 nailer spacer. Why do you prefer 2x4?
Drywall = ½"
Skirt board = ¾"
Total = 1¼"
2X = 1½"
__________________
Put your location in your profile!
(Sorry....it seems there really are dumb questions)
neolitic is offline  
Old 11-23-2009, 09:57 AM   #15
Pro
 
Joe Carola's Avatar
 
Trade: Framing Contractor
Join Date: Jun 2004
Location: Caldwell, New Jersey
Posts: 1,541

Re: Sitebuilt Stairs - Techniques


Quote:
Originally Posted by Gus Dering View Post
I agree about the use of the stairs during construction.

The plywood riser should be run to the bottom of the tread IMO. So it can be fastened from behind and the tread is supoorted by those fasteners in shear along with the goo.

LVL's are the best for the stringers with this cuz of the no shrinkage factor.

I would prefer to lay out the system so that the top tread that is shown at the upper floor elevation to be full width when at all possible. Mostly for the ease of lay out but there comes a point where you can shorten it to the point of reducing the bottom chord's width.

The ply wood just adds stability to the assembly. It can't hurt to have it.
Gus,

With all this framing material and finish material time and labor, how much doe it cost for a set of stairs the way you guys build them? It's amazing how much framing material has to go into a set of stairs. LVL's for stringers is insane for me to read when all you need is a set of stairs made out of pine to do the same job and will last just as long.
__________________
Joe Carola
Joe Carola is offline  
Old 11-23-2009, 10:58 AM   #16
Pro
 
Railman's Avatar
 
Trade: Railing
Join Date: Jan 2008
Location: Cincinnati
Posts: 700

Re: Sitebuilt Stairs - Techniques


Around here, it's 2x10 routed stringers, with no center carriage. The stringers are shimmed, & nailed at each stud. My home of 21 years was done this way, with zero problems, & never will be. Stairs have the least live load, of any floor, or roof in a home. There is only a momentary load on them. 99.9 % of the time, no live load. Why all the extra lumber?
Joe
Railman is offline  
Old 11-23-2009, 11:09 AM   #17
Pro
 
Joe Carola's Avatar
 
Trade: Framing Contractor
Join Date: Jun 2004
Location: Caldwell, New Jersey
Posts: 1,541

Re: Sitebuilt Stairs - Techniques


Quote:
Originally Posted by Railman View Post
Around here, it's 2x10 routed stringers, with no center carriage. The stringers are shimmed, & nailed at each stud. My home of 21 years was done this way, with zero problems, & never will be. Stairs have the least live load, of any floor, or roof in a home. There is only a momentary load on them. 99.9 % of the time, no live load. Why all the extra lumber?
Joe
Joe,

They use 5/4 outside stringers around here with nothing in the middle. Do you have any pictures of the building process?
__________________
Joe Carola
Joe Carola is offline  
Old 11-23-2009, 09:10 PM   #18
Member
 
DFC's Avatar
 
Trade: Framing
Join Date: Nov 2009
Posts: 35

Re: Sitebuilt Stairs - Techniques


Quote:
Originally Posted by neolitic View Post
Drywall = ½"
Skirt board = ¾"
Total = 1¼"
2X = 1½"
Right, my bad, missed the skirt board. Haven't framed for hardwood floors in awhile.
DFC is offline  


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
How much to charge for new stairs skarrlette Finish Carpentry 40 12-14-2010 05:38 PM
Question on stairs. billy d Decks & Fencing 59 11-12-2009 08:01 PM
A question about the top tread of stairs. justariot Finish Carpentry 3 11-11-2009 10:48 AM
Leveling of Banister Stairs in old row home limamike Carpentry 22 08-25-2009 05:22 AM
Are uncut stringers old fashioned for stairs? atari Finish Carpentry 2 05-30-2006 01:59 PM

Join Now... It's Fast and FREE!

Privacy Badge
I am a professional contractor
I am a DIY Homeowner
ContractorTalk.com is for
PROFESSIONAL CONTRACTORS ONLY!

At ContractorTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?