Thread Tools | Search this Thread | Display Modes |
|
|
#1 |
|
Pro
Trade: Engineer & Ret. GC
Join Date: May 2007
Location: 44deg15'43"N 74deg14'26"W
Posts: 833
|
Sitebuilt Stairs - Techniques
Take a look a this picture, and ignore the way the detail implies the use of t&g floor finish for the tread and riser finish.
I want to ask about two things, the steel hanger clipping the carriages to the landing header, and the use of plywood substrate under both tread and riser. Having only built a few of these, my method has been to use a full-width sheet of 3/4 plywood as the hanger for carriages, and the finish tread and riser parts are fixed directly to the carriages, with no sheetgoods substrates on there first. What do you do, and why? |
|
|
|
|
|
#2 |
|
Palisade Point Const.
Trade: Remodeling/Finish/Framing/Log
Join Date: Feb 2007
Location: Bozeman MT
Posts: 1,781
|
Re: Sitebuilt Stairs - Techniques
The plywood treads do two things- they act as temporary stairs so that the final stairs can be done later and not screwed up during construction, and they allow for more nailing for the T&G.
|
|
|
|
|
|
#3 |
|
Maker of fine kindling
|
Re: Sitebuilt Stairs - Techniques
I agree about the use of the stairs during construction.
The plywood riser should be run to the bottom of the tread IMO. So it can be fastened from behind and the tread is supoorted by those fasteners in shear along with the goo. LVL's are the best for the stringers with this cuz of the no shrinkage factor. I would prefer to lay out the system so that the top tread that is shown at the upper floor elevation to be full width when at all possible. Mostly for the ease of lay out but there comes a point where you can shorten it to the point of reducing the bottom chord's width. The ply wood just adds stability to the assembly. It can't hurt to have it.
__________________
Every parent who has walked barefoot into their child's room late at night hates Legos |
|
|
|
|
|
#4 |
|
Curmudgeon
Trade: carpentry/remodeling/"Yes M'am we do"
Join Date: Apr 2006
Location: Beech Grove, Indiana, Birthplace of the "King of Cool"
Posts: 11,707
|
Re: Sitebuilt Stairs - Techniques
I think it was drawn by someone
who never built a set of stairs, and probably couldn't if asked to. JMO....
__________________
Put your location in your profile! (Sorry....it seems there really are dumb questions) |
|
|
|
|
|
#5 |
|
Pro
Trade: framing/remodeling
Join Date: Feb 2005
Location: NE Ohio
Posts: 3,696
|
Re: Sitebuilt Stairs - Techniques
That hanger at the top should not be necessary if the bottom is secured properly. As long as the bottom doesn't move, where can the top go?
I think the plywood is unnecessary as well. I don't see the need for the top tread like that either. The deck should be the starting point for the stairs. |
|
|
|
|
|
#6 | |
|
Maker of fine kindling
|
Re: Sitebuilt Stairs - TechniquesQuote:
I am absolutely sure you have that all worked out for yourself. I am a simple man with an uncomplicated mind unlike the geometric brainstorm that you are.
__________________
Every parent who has walked barefoot into their child's room late at night hates Legos |
|
|
|
|
|
|
#7 |
|
The Duke
Trade: Cabinet Maker
Join Date: Mar 2006
Location: Portland, Maine
Posts: 10,101
|
Re: Sitebuilt Stairs - Techniques
Depends, but usually plywood risers and treads. Like Gus says, the riser needs to go behind the tread. I've done it the way you show it, once. Usually hang it with ply. Your sheetrock nailer at the top and bottom, unnecessary. Your flooring for risers, retarded.
__________________
If you correct your mind, the rest of your life will fall into place ~Lao Tzu Custom Cabinetry - Portland, Cape Elizabeth, Scarborough, Kennebunkport, Yarmouth, Falmouth, Cumberland, Ogunquit, Maine Salmon Falls Cabinetry |
|
|
|
|
|
#8 |
|
Motorboatin' son of a ...
Trade: General Contractor
Join Date: Feb 2008
Location: Orange County, CA
Posts: 1,069
|
Re: Sitebuilt Stairs - Techniques
|
|
|
|
|
|
#9 |
|
Pro
Trade: Deck Builder
Join Date: Oct 2007
Location: Austin, Tx.
Posts: 1,511
|
Re: Sitebuilt Stairs - Techniques
What's with the full stringer & notched stringer? It looks like the "full stringer" is nothing more than a 2x6 nailer usually added on when the stairway goes up against a wall to have S/R & trim piece.
|
|
|
|
|
|
#10 | |
|
Pro
Trade: GC, Remodeling
Join Date: Sep 2009
Location: Central, MN
Posts: 177
|
Re: Sitebuilt Stairs - TechniquesQuote:
If I understand you correctly (we use diffrent terms) but, I don't bother with plywood. Why? Because it's more work. Just put stringers up one at a time and secure to sub floor and the double header at top. Why would you need more product? |
|
|
|
|
|
|
#11 |
|
chief pencil holder
Trade: Custom Cabinet Maker, Handrail
Join Date: Mar 2009
Location: sacramento CA
Posts: 1,271
|
Re: Sitebuilt Stairs - Techniques
wow you guys make stairs complicated, just rember that the crotch of the stringer is the weak point take cate of that, cleat the bottom dont use t+g, anywhere, plywood risers, 5/4 treads. keep it tight and glue evreything.
__________________
http://sacramentomillworks.com |
|
|
|
|
|
#12 |
|
Pro
Trade: Kitchen and bath design+remodel
Join Date: Mar 2009
Posts: 710
|
Re: Sitebuilt Stairs - Techniques
We do it like figure "C" above, you need to know all of the flooring thicknesses,
with false treads and risers use 5/4 treads, use 3/4 sub floor for treads under full treads. The stringers are usually (3) 2x12 with 2x4 nailer spacer on inside for drywall and skirt board clearance and stiffening. lots of glue on 1/2 ply risers |
|
|
|
|
|
#13 | |
|
Member
Trade: Framing
Join Date: Nov 2009
Posts: 35
|
Re: Sitebuilt Stairs - TechniquesQuote:
|
|
|
|
|
|
|
#14 |
|
Curmudgeon
Trade: carpentry/remodeling/"Yes M'am we do"
Join Date: Apr 2006
Location: Beech Grove, Indiana, Birthplace of the "King of Cool"
Posts: 11,707
|
Re: Sitebuilt Stairs - Techniques
Drywall = ½"
Skirt board = ¾" Total = 1¼" 2X = 1½"
__________________
Put your location in your profile! (Sorry....it seems there really are dumb questions) |
|
|
|
|
|
#15 | |
|
Pro
Trade: Framing Contractor
Join Date: Jun 2004
Location: Caldwell, New Jersey
Posts: 1,541
|
Re: Sitebuilt Stairs - TechniquesQuote:
With all this framing material and finish material time and labor, how much doe it cost for a set of stairs the way you guys build them? It's amazing how much framing material has to go into a set of stairs. LVL's for stringers is insane for me to read when all you need is a set of stairs made out of pine to do the same job and will last just as long.
__________________
Joe Carola |
|
|
|
|
|
|
#16 |
|
Pro
Trade: Railing
Join Date: Jan 2008
Location: Cincinnati
Posts: 700
|
Re: Sitebuilt Stairs - Techniques
Around here, it's 2x10 routed stringers, with no center carriage. The stringers are shimmed, & nailed at each stud. My home of 21 years was done this way, with zero problems, & never will be. Stairs have the least live load, of any floor, or roof in a home. There is only a momentary load on them. 99.9 % of the time, no live load. Why all the extra lumber?
Joe |
|
|
|
|
|
#17 | |
|
Pro
Trade: Framing Contractor
Join Date: Jun 2004
Location: Caldwell, New Jersey
Posts: 1,541
|
Re: Sitebuilt Stairs - TechniquesQuote:
They use 5/4 outside stringers around here with nothing in the middle. Do you have any pictures of the building process?
__________________
Joe Carola |
|
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| How much to charge for new stairs | skarrlette | Finish Carpentry | 40 | 12-14-2010 05:38 PM |
| Question on stairs. | billy d | Decks & Fencing | 59 | 11-12-2009 08:01 PM |
| A question about the top tread of stairs. | justariot | Finish Carpentry | 3 | 11-11-2009 10:48 AM |
| Leveling of Banister Stairs in old row home | limamike | Carpentry | 22 | 08-25-2009 05:22 AM |
| Are uncut stringers old fashioned for stairs? | atari | Finish Carpentry | 2 | 05-30-2006 01:59 PM |
| Go to Page... |