Contractor Talk - Construction and Remodeling Site
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Contractor Talk - Professional Construction and Remodeling Forum > Trade Talk > Carpentry > Finish Carpentry

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 08-25-2009, 02:30 PM   #1
Pro
Trade: general contractor
 
Join Date: Oct 2008
Location: Sterling ,Alaska
Posts: 731
New to me.

Ok. For the first time in my career I have been asked to bid to install cabinets purchased at Lowes. Hickory. I am pretty certain the owners have recieved an estimate from Lowes. The kitchen is very simple with one corner sink base. 9 wall cabinets, 11 base cabinets, 1 pantry. The two two runs of cabinets are 10' and 11'. There is an island consisting of 5 bases 3/2 back to back. Tile tops are to be installed by others. The wall cabinets are a common height finished with crown. The owner says supports were built in prior to drywall. I can't see more than 2 days max to install these my self.
I usually build my cabinets. I use 2 1/2" screws through shelf supports at the backs. I use 1 1/4" screws to attach cabinets to one another. What method of wall fastening is most common with cabs purchased at the big box stores?
Any words of wisdom?

__________________
http://sullcon.homestead.com/
mics_54 is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 08-25-2009, 02:35 PM   #2
Pro
 
ChrWright's Avatar
Trade: Builder/Remodeler
 
Join Date: Jul 2007
Location: Indianapolis, Indiana
Posts: 2,070
Blog Entries: 1
Quote:
Originally Posted by mics_54 View Post
Ok. For the first time in my career I have been asked to bid to install cabinets purchased at Lowes. Hickory. I am pretty certain the owners have recieved an estimate from Lowes. The kitchen is very simple with one corner sink base. 9 wall cabinets, 11 base cabinets, 1 pantry. The two two runs of cabinets are 10' and 11'. There is an island consisting of 5 bases 3/2 back to back. Tile tops are to be installed by others. The wall cabinets are a common height finished with crown. The owner says supports were built in prior to drywall. I can't see more than 2 days max to install these my self.
I usually build my cabinets. I use 2 1/2" screws through shelf supports at the backs. I use 1 1/4" screws to attach cabinets to one another. What method of wall fastening is most common with cabs purchased at the big box stores?
Any words of wisdom?
What you describe is typical for stock cabinets. There's usually a solid wood screw cleat at the top of the base cabinets and the top & bottom of the wall cabinets.

I'm not sure what manuf. you're installing--but Kraftmaid sends screw kits with each cabinet--three washer head screws to anchor to the wall and two bugle head screws to join the face frames to one another.

Your time estimate sounds about right as well. But you might want to allow an extra half-day (if you can still price it competitive) for PITA factor.

You'll have to hold your nose while you're installing these. Most guys who are used to working with their own custom cabinets find the stocks to be crap to work with. Often times they require a lot more "persuasion" to get them level, plumb & square.

__________________
Christopher Wright, WrightWorks, LLC
www.WrightWorks.net - Facebook - Christopher Wright, Remodeling Info on Twitter
Indianapolis Remodeling Contractor - Remodeling Photos: Kitchens, Baths, Room Additions, Basements
"Form follows function - that has been misunderstood. Form and function should be one, joined in a spiritual union." -Frank Lloyd Wright

Last edited by ChrWright; 08-25-2009 at 02:39 PM.
ChrWright is offline   Reply With Quote
The Following User Says Thank You to ChrWright For This Useful Post:
mics_54 (08-25-2009)
Old 08-25-2009, 02:49 PM   #3
Pro
 
basswood's Avatar
Trade: trim carpenter
 
Join Date: Oct 2008
Location: SE MN
Posts: 1,085
Recovering Borg Installer here.

You should be able to do that job in the time you estimated. Charge what you want to make, but add 1/2 day to protect yourself. If the designer or cab supplier makes a mistake, or a cab is damaged, that should cover an extra trip. I speaketh from experience... something might not be right. Or offer to do it for your hourly rate.

Chances are good that a quote of say $1250 will still beat Blowes price. Their install prices usually have to pay money to the store, the installer, and often a third party middleman that hires the installer for the store.
basswood is offline   Reply With Quote
The Following 2 Users Say Thank You to basswood For This Useful Post:
jmthouston (09-02-2009), mics_54 (08-25-2009)
Old 08-25-2009, 02:59 PM   #4
Pro
Trade: general contractor
 
Join Date: Oct 2008
Location: Sterling ,Alaska
Posts: 731
Excellent info guys. That's what I needed to know! Sounds like my hourly rate is low! I usually wouldn't even bid stuff like this but I gotta tell ya..It's dead around here.
As an aside...she asked if I could install some "reclaimed" flooring she got from her grandfathers grocery store in the Dakotas. Ugh!
__________________
http://sullcon.homestead.com/
mics_54 is offline   Reply With Quote
Old 08-25-2009, 03:05 PM   #5
DavidC
 
DavidC's Avatar
Trade: Remodeler
 
Join Date: Feb 2008
Location: NNY
Posts: 1,316
Lowes will use a point sheet to calculate their quote. If you could find out the value of a point in your area then you could easily see if your going to be competitive. Not sure if it matters to you or your client.

Good Luck
Dave
__________________
OK, rant if you must. For the love of Pete, use paragraphs and spell check.
DavidC is offline   Reply With Quote
The Following User Says Thank You to DavidC For This Useful Post:
mics_54 (08-25-2009)
Old 08-25-2009, 03:22 PM   #6
Pro
Trade: general contractor
 
Join Date: Oct 2008
Location: Sterling ,Alaska
Posts: 731
DavidC
I wouldn't mind knowing this point value or or their bid specifics but I don't know how I would find this out. They have a contractor installation estimator do an estimate for a refundable fee...I ran into this in a carpeting bid... they tried to get an estimate fee from me a couple of years ago. I told them they were out of their minds and the waved it. That dog don't hunt on my jobs. They screwed up the carpet order anyway.
__________________
http://sullcon.homestead.com/
mics_54 is offline   Reply With Quote
Old 08-25-2009, 03:34 PM   #7
DavidC
 
DavidC's Avatar
Trade: Remodeler
 
Join Date: Feb 2008
Location: NNY
Posts: 1,316
Quote:
Originally Posted by mics_54 View Post
DavidC
I wouldn't mind knowing this point value or or their bid specifics but I don't know how I would find this out. They have a contractor installation estimator do an estimate for a refundable fee...I ran into this in a carpeting bid... they tried to get an estimate fee from me a couple of years ago. I told them they were out of their minds and the waved it. That dog don't hunt on my jobs. They screwed up the carpet order anyway.
I don't think the open forum is a good place for specific pricing info. Check your PM box.

FWIW, they are famous for screwing up orders.

Good Luck
Dave
__________________
OK, rant if you must. For the love of Pete, use paragraphs and spell check.
DavidC is offline   Reply With Quote
Old 08-25-2009, 03:40 PM   #8
Pro
Trade: general contractor
 
Join Date: Oct 2008
Location: Sterling ,Alaska
Posts: 731
Thanks for the info Dave
__________________
http://sullcon.homestead.com/
mics_54 is offline   Reply With Quote
Old 08-25-2009, 03:47 PM   #9
Plausible Deniability
 
JumboJack's Avatar
Trade: General Contractor
 
Join Date: Aug 2007
Location: Lakewood CA.
Posts: 2,235
I posted some pictures of a kitchen cabinet install I did a month or two ago...http://www.contractortalk.com/f11/po...44440/index96/
Post #1903

I kid you not Lowes wanted 2400.00 to do an install on their cabinets..They got these cabinets from my guy instead.....I did it in a day and a half....
__________________
"The problem with socialism is that eventually you run out of other people's money."
JumboJack is offline   Reply With Quote
The Following User Says Thank You to JumboJack For This Useful Post:
mics_54 (08-25-2009)
Old 08-25-2009, 03:55 PM   #10
Member
Trade: Remodel/Deck
 
Join Date: May 2009
Location: Jackson, MS
Posts: 41
Quote:
Originally Posted by mics_54 View Post
As an aside...she asked if I could install some "reclaimed" flooring she got from her grandfathers grocery store in the Dakotas. Ugh!
I think your hourly rate just went up. I'm not big on too much reclaimed materials. The flooring will be a PITA. From an old grocery store, it will likely have uneven wear patterns, meaning they will be unlikely to be even thickness, depending on age and species.

I hope she is planning to refinish the floors too. I have had people find great looking reclaimed flooring, and are looking to have it installed "as-is" with all the patina and wear intact. Including the old finishes. I declined to bid that job. It will never match up right, and never look as good as it did when it was still installed in its original location. Being that it's from the "grandfather's grocery" and has sentimental value, that might be what they are looking for.

If you decide to go with it, make sure they have plenty of stock available. Quite a bit more waste with reclaimed. And add a good PITA cushion to your hourly rate. It's hard to estimate time on a project like that. And insist that it will need to be refinished when complete. They will need to have realistic expectations when it comes to reclaimed floors.

All that being said, reclaimed floors can be beautiful. Although I'm not a flooring guy, I have installed some. All smaller sections. One or two rooms. Usually sub that out. And, I've only once used reclaimed flooring; for a sun room. I wouldn't do it again, unless for a VERY good customer.
Rustbucket is offline   Reply With Quote
The Following User Says Thank You to Rustbucket For This Useful Post:
mics_54 (08-25-2009)
Old 08-31-2009, 02:19 PM   #11
Pro
Trade: general contractor
 
Join Date: Oct 2008
Location: Sterling ,Alaska
Posts: 731
Bid it and never heard another word from the lady. Not "no thanks" "KMA" or nothin. What a waste of time.
__________________
http://sullcon.homestead.com/
mics_54 is offline   Reply With Quote
Old 08-31-2009, 02:22 PM   #12
J F
where did everybody go?
 
J F's Avatar
Trade: Remodeler
 
Join Date: Dec 2005
Location: North of Atlanta
Posts: 3,257
Imagine that.
J F is offline   Reply With Quote
Old 08-31-2009, 04:54 PM   #13
General Contractor
 
Willie T's Avatar
Trade: General Contractor
 
Join Date: Jan 2009
Location: St. Petersburg, FL
Posts: 474
Gosh, lost a bid? Well, we're here to help you through it.
__________________
"True eloquence consists in saying all that is necessary, and only that which is."
François Duc de La Rochefoucauld
Bill Everett - St. Petersburg, FL
Willie T is offline   Reply With Quote
Old 08-31-2009, 04:59 PM   #14
Maker of fine kindleing
 
Gus Dering's Avatar
Trade: cabinet maker
 
Join Date: Oct 2008
Location: Santa Rosa CA
Posts: 2,199
Send a message via Yahoo to Gus Dering
Quote:
Originally Posted by mics_54 View Post
Bid it and never heard another word from the lady. Not "no thanks" "KMA" or nothin. What a waste of time.
Really?
That has never happened to me.













NOT !

I'm sorry to say, you'll get used to it.
__________________
Quote:
Originally Posted by WarnerConstInc. View Post
Gus is right.
Gus Dering is online now   Reply With Quote
Old 08-31-2009, 05:01 PM   #15
Pro
Trade: general contractor
 
Join Date: Oct 2008
Location: Sterling ,Alaska
Posts: 731
Thanks guys...I feel better!
It isn't the first time...I just thought the people that helped me with the bid would like an update on that job. I wasn't crazy about installing Lowes cabs anyway. I imagine she had several offers around here.
__________________
http://sullcon.homestead.com/

Last edited by mics_54; 08-31-2009 at 05:04 PM.
mics_54 is offline   Reply With Quote
Old 08-31-2009, 05:06 PM   #16
Maker of fine kindleing
 
Gus Dering's Avatar
Trade: cabinet maker
 
Join Date: Oct 2008
Location: Santa Rosa CA
Posts: 2,199
Send a message via Yahoo to Gus Dering
I lied anyway.

It sucks everytime
__________________
Quote:
Originally Posted by WarnerConstInc. View Post
Gus is right.
Gus Dering is online now   Reply With Quote
Old 08-31-2009, 05:11 PM   #17
Pro
Trade: general contractor
 
Join Date: Oct 2008
Location: Sterling ,Alaska
Posts: 731
Wish I had another bid to waste time on!
__________________
http://sullcon.homestead.com/
mics_54 is offline   Reply With Quote
Old 08-31-2009, 05:15 PM   #18
Chief hand holder
 
bert0168's Avatar
Trade: Residential Remodeling
 
Join Date: Jan 2008
Location: South Eastern PA
Posts: 551
Quote:
Originally Posted by mics_54 View Post
Wish I had another bid to waste time on!
Patience young Jedi.

I'm hopefully not wasting my time on three right now, well not this second cause I AM wasting my time here
bert0168 is offline   Reply With Quote
Old 08-31-2009, 05:52 PM   #19
LRG WoodCrafting
 
Leo G's Avatar
Trade: Professional Sawdust Producer
 
Join Date: May 2005
Location: USA, Connecticut
Posts: 3,903
Quote:
Originally Posted by Gus Dering View Post
I lied anyway.

It sucks everytime
Not every time. Every once in a while I get a job that after dealing with the people I discover that I really don't want it. So I bid it high. And when I don't get it I am happy. But if you do get it you are happy too, because you are going to make a butt load of money.
__________________
Measure Twice Cut Once -- It's a lot easier to cut more off then it is to cut MORON.
Quote:
Originally Posted by HusqyPro View Post
Carpenter by day.
Mad scientist by night.
http://lrgwood.com
Leo G is offline   Reply With Quote
The Following User Says Thank You to Leo G For This Useful Post:
Meetre (09-02-2009)
Old 08-31-2009, 06:10 PM   #20
Pro
 
D.Foster's Avatar
Trade: Carpentry & Remodeling
 
Join Date: Sep 2008
Location: N.Y. State
Posts: 537
Every Lowes or HD kitchen i have installed has been missing fillers and short on toe kick. Be there for the measurements and figure out your fillers yourself!!
__________________
Do what you would do, as if i won't Do anything after you Did It!
D.Foster is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off





Top of Page | View New Posts


All times are GMT -5. The time now is 02:41 AM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC