Contractor Talk - Construction and Remodeling Site
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   Contractor Talk - Professional Construction and Remodeling Forum > Contractors Talk Forums > General Discussion

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 11-10-2009, 09:07 PM   #1
Pro
Trade: Construction
 
Join Date: Jun 2009
Location: VA
Posts: 1,821
How do you guys bill travel time?

I was having a arguement with my bro in law about how people bill travel time. In the UK we used to bill one way at normal hourly rate so it would basicly be half rate there and half rate back. How do you guys bill this? He says i shouldnt bill that at all or bill my time in picking up materials and supplys!

BCConstruction is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. ContractorTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Join Contractor Talk

Join the #1 Contractor Forum Today - It's Totally Free!

ContractorTalk.com - Are you a Professional Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for contractors to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your trade is you'll find that ContractorTalk.com is a great community to join. Best of all it's totally free!

Join ContractorTalk.com - Click Here JOIN FOR FREE

Old 11-10-2009, 09:15 PM   #2
Pro
 
rselectric1's Avatar
Trade: Licensed Electrical Contractor and Remodeler
 
Join Date: Sep 2009
Location: Chicago Suburbs
Posts: 2,008
Depends on the job, but for a simple t&m service call, I charge a "service call fee" which is more than twice my hourly rate, but it includes the first hour of labor. Additional labor is billed in 15 minute (completed) increments.

For parts runs, if I am marking up the materials, I dont bill to go get them. If I am charging the customer what I am paying, I charge my hourly rate for the travel times both ways. (Jobsite to supply house and back to jobsite)

As far as travel time after the job-like back home, I never charge for that.
__________________
220...221...whatever it takes!
rselectric1 is offline   Reply With Quote
Old 11-10-2009, 09:44 PM   #3
One of the sheep
 
angus242's Avatar
Trade: Kitchen/Bath Remodeling, Tile
 
Join Date: Oct 2007
Location: Will County, Illinois
Posts: 2,056
For estimates, contract signing or material pick up, I base it off of mileage. None of these charges are actually itemized for the customer. I have a set "fee" that includes the above plus (some) design, phone calls, etc. This fee is determined on a per-job basis.

Not included in said fee is my basic charge for overall travel. It's usually $100 on a 3-5 day job. If I get into a 2+ week job, it's $200. Basically that translates to a full tank of fuel ($100) for me. Seeing as I can get almost 700 miles to a tank, this also pays for my time sitting in my truck too.
__________________
Angus
"If you're good at something, never do it for free."
angus242 is offline   Reply With Quote
Old 11-10-2009, 10:10 PM   #4
Capra aegagrus
 
Tinstaafl's Avatar
Trade: Remodeler
 
Join Date: Jan 2008
Location: Central Pennsylvania
Posts: 2,440
Billing for travel time is valid for service work, whether you cover it with a minimum charge or itemize it. For a bidded and contracted job, it would be calculated in as part of the overall overhead, and certainly not itemized to the customer.
Tinstaafl is offline   Reply With Quote
Old 11-11-2009, 07:55 AM   #5
Pro
Trade: Construction
 
Join Date: Jun 2009
Location: VA
Posts: 1,821
Thanks guys. seems everyone has a different way of billing for travel time but in the end they are billed.
BCConstruction is offline   Reply With Quote
Old 11-11-2009, 06:22 PM   #6
Pro
Trade: Contractor Residential Construction
 
Join Date: Jan 2008
Location: Home of Bobby Hull
Posts: 117
I no longer do material or supply runs. Too much wear and tear on the vehicle and can't justify my hourly rate sitting in a vehicle. I pay a hot shot service that is far less than I could charge. I am surprised plumbers and electricians etc... don't do the same. Book a hotshot for the morning running around delivering all your parts and a way you go. I spent lot's of up front time building a relationship with suppliers so they know the deal. I also charge a transportation fee to and from the site due to the nature of my location. Just to be specific here, transportation is a cost that takes into account the replacement value of my vehicle. This would be part of overhead.
__________________
Ever get the feeling when your up to your arse in aligators that someone forgot to drain the swamp?
10fingers is offline   Reply With Quote
Old 11-11-2009, 06:39 PM   #7
Licensed Contractor
 
Magnettica's Avatar
Trade: Electrician
 
Join Date: Dec 2006
Location: Rahway, New Jersey
Posts: 3,656
Service call is a fixed rate with 1 hour labor built in to the price. Most service calls I can accomplish in 1 hour, including diagnosing the problem. The repair is a separate price and that price may or may not wipe out the service call fee. This is what's been working for me so far.

Trips to the supply house don't get directly billed to the customer. That's why we mark up materials and to cover any warranty on the labor and/ or material.
Magnettica is offline   Reply With Quote
Old 11-11-2009, 09:23 PM   #8
Pro
 
katoman's Avatar
Trade: carpenter
 
Join Date: Apr 2009
Location: Kirkfield,Ontario, Canada
Posts: 1,104
Our last three jobs, ranging from 2 weeks to 2 months, were all T&M. We bill travel time one way at our hourly rate. If the job is only 30 min. away, we don't charge it at all.

Got one coming up, the travel is 2 1/2 hrs one way! It will be charged. Makes for a long day though.

This is of course agreed to by the customer before hand. One customer balked at this, and we simply told him if he wouldn't pay it we would not do the job.

If the job is contract price, we work it into the overhead.
katoman is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
St.Louis Guys N.Schiffer General Discussion 10 09-16-2009 01:05 PM
bill for setup and cleanup time woodworkbykirk General Discussion 15 07-22-2009 09:57 PM
Time To Really Consider Escalation Clauses Ed the Roofer Business 18 06-25-2008 10:42 PM


Top of Page | View New Posts


All times are GMT -5. The time now is 04:45 PM.


Contractor Talk™ © 2003 - 2009 The Building Network LLC